B08 - Attachment 0005 - 2024-241 Appendix D - Non-Hazardous Construction and Demolition Debris Submittal.pdf

PDF 338 KB Posted

Attached to
Repair Roof - Building 208
Solicitation number
W519TC-24-R-2024
Issued by

About this file

This document contains a template for tracking non-hazardous construction and demolition debris from a project. It includes tables to estimate the weight, percentage to be landfilled versus recycled or otherwise diverted, and space to identify the vendors or companies receiving the various materials.

The related federal contract opportunity is a solicitation from the Army Contracting Command - Rock Island to repair the roof of Building 208 on the Rock Island Arsenal in Illinois. Interested contractors should submit a proposal in response. The Department of the Army Materiel Command Contracting Command Rock Island Arsenal is listed as the contracting agency. No further details are provided on response dates, award timing, pricing terms, or set-asides in the opportunity description.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rock Island Arsenal Scope of Work

PR# 2024-241

Building 208 Roof Repair

4 January 24

Appendix D - Non-Hazardous

Construction and Demolition Debris

Submittal

US Army Garrison-Rock Island Arsenal Directorate of Public Works

Engineering and Services Division

AMIM-RIP-G

1 Rock Island Arsenal Rock Island, IL 61299-5000

Estimated Weight Estimated Percent to be Landfilled

Estimated Percent to be Recycled

Estimated Percent to be Diverted TOTAL Weight Weight landfilled Landfill Weight recycled Recycler Weight

Diverted Diversion Weight tickets received

(pounds) (%) (%) (%) (pounds) (pounds) (vendor/ company name) (pounds) (vendor/ company name) (pounds) (vendor/ company name) Y or N

CIVIL

Asphalt Concrete Gravel Soil Structural Steel Structural Wood Other Wood Other Steel/Metal Top Soil Sub Soil Trees Crushed Stone/Base

ARCHITECTURAL

Aluminum Brick Carpet Ceiling Tile

CMU

Copper Doors Drywall Glass Insulation Materials Iron Metal Studs Misc Metal Paper Plastic Roofing Materials Sheet Metal Stone Vinyl Base Vinyl Flooring Windows Wood Studs

ELECTRICAL

Ballasts Light Fixtures Transformers Wire Conduit

MECHANICAL

Cast Iron Pipe Copper Pipe Steel Pipe HVAC Equipment White Goods Plumbing Fixtures

RPZ/DCD

Insulation

PHASE II:C&D Report Data

Material

Non-Hazardous Construction and Demolition Debris Submittal Project Title:

Project Number:

Contractor Name:

Contracting Officer's Representative:

PHASE I:C&D Plan Data

File details come from the government source that posted it. Updated .