B08 Attachment 0004 Appendix C Submittal Register.pdf

PDF 87 KB Posted

Attached to
Repair Roof - Building 250
Solicitation number
W519TC-23-R-2045
Issued by

About this file

This submittal register outlines the submittal requirements for a roof repair project at Building 250 on Rock Island Arsenal in Rock Island, Illinois. The project specifications require submittals for items including a quality control plan, construction waste management plan, warranties, shop drawings, product data sheets, manufacturer instructions, qualifications, test reports, and closeout documents. Specified materials and systems include EPDM roofing, roof insulation, flashing, firestopping, sealants, gypsum board, ceramic tile, and coatings. The register lists the relevant specification sections and paragraphs governing each submittal item and its classification. It provides columns for the contractor and approving authority to track submittal dates and review actions. The related federal contract opportunity is a solicitation from the Department of the Army Materiel Command Contracting Command Rock Island Arsenal to repair the roof at Building 250 on the installation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

Building 250 Roof Repair, Project No. 2019-4428

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.6.1 GAPP - Construction

1.6 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.11 FIONotifications and Reports

1.11.2 GAccident Reports

1.11.3 FIOLHE Inspection Reports

SD-07 Certificates

1.5.1.3 FIOCrane Operators/Riggers

1.6.3.1 GStandard Lift Plan

1.7 FIOActivity Hazard Analysis (AHA)

1.8.1 FIOHot Work Permit

1.11.4 FIOCertificate of Compliance

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 74 19 SD-01 Preconstruction Submittals

1.5 GConstruction Waste Management

Plan SD-06 Test Reports

1.7.2 FIOQuarterly Reports

01 78 00 SD-03 Product Data

1.7.1 FIOWarranty Management Plan

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES

01 78 00 1.7.1 FIOAs-Built Record of Equipment and Materials

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

06 10 00 SD-02 Shop Drawings GTrussed Rafters

07 21 23 SD-03 Product Data

2.1 FIOLoose Fill Insulation

SD-08 Manufacturer’s Instructions

2.1 FIOLoose Fill Insulation

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.1 GInsulation

1.4 GCover Board

2.4 GFasteners

2.3 GMoisture Control

2.1.2 SRecycled Content For Insulation

SD-06 Test Reports

1.7.1 GFlame Spread Rating

SD-07 Certificates

1.6 GInstaller Qualifications

1.6 GCertificates Of Compliance For

Felt Materials SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

07 22 00 2.4 GFasteners

2.1 GInsulation

07 53 23 SD-02 Shop Drawings

1.3.1 FIORoof Plan Drawing

1.3.1 FIOWind Load Calculations

1.3.1 FIOBoundaries of Enhanced

Perimeter

1.3.1 FIOCorner Attachments of Roof

System Components

1.3.1 FIOSlopes and Drain Locations

SD-03 Product Data

2.2 FIOCement

2.1.1 GEPDM Sheet

2.1.3 FIOSeam Tape

2.1.5 FIOBonding Adhesive

2.1.4 FIOLap Splice Adhesive

2.1.7 FIOWater Cutoff Mastic/Water Block

2.1.6 FIOLap Cleaner, Lap Sealant, and

Edge Treatment

3.3 FIOFlashings

2.1.8 FIOFlashing Accessories

2.1.8.1 FIOFlashing Tape

2.1.9 FIORoof Insulation

1.8 GWarranty

SD-05 Design Data

1.4.4 GWind Uplift Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

07 53 23 SD-07 Certificates

1.4.1 FIOQualification of Manufacturer

1.4.2 FIOQualification of Applicator

1.4.4 GWind Uplift Resistance

1.4.3 GFire Resistance

SD-08 Manufacturer’s Instructions

3.2 GApplication

3.2.3 GApplication Method

3.3.2 GMembrane Flashing

2.1.3 FIOSeam Tape

3.2.4 FIOTape Seams / Lap Splices

3.2.5 FIOAdhesive Seams / Lap Splices

3.2.6 FIOPerimeter Attachment

3.2.4 FIOPrimer

1.6 GCold Weather

SD-11 Closeout Submittals

1.8 FIOWarranty

3.8 FIOInformation Card

07 60 00 SD-02 Shop Drawings

3.1.10 GFlashing for Roof Drains

3.1.7 GBase Flashing

3.1.8 GCounterflashing

3.1.12 GFlashing at Roof Penetrations

and Equipment Supports SD-08 Manufacturer’s Instructions

1.4.2 GInstructions for Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

07 60 00 SD-10 Operation and Maintenance Data

1.4.2 GCleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

2.2 FIOFirestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

09 29 00 SD-03 Product Data

2.1.1 FIOGypsum Board

09 30 10 SD-03 Product Data GGlazed Ceramic Tile

SD-04 Samples

2.1 GTile

2.2.1 GGrout

SD-08 Manufacturer’s Instructions

3.4 FIOManufacturer's Approved

Cleaning Instructions 09 90 00 SD-03 Product Data

2.1 GCoating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

09 90 00 2.1 FIOProduct Data Sheets SD-04 Samples

2.2 GColor

SD-08 Manufacturer’s Instructions

3.2.1 FIOApplication Instructions

2.1 FIOMixing

1.7.1 FIOManufacturer's Safety Data

Sheets 23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3 FIOPipe Insulation Systems

3.2 FIOPipe Insulation Systems

2.3.1 FIORecycled content for insulation

materials SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR