B08 Attachment 0004 Appendix C Submittal Register.pdf

PDF 65 KB Posted

Attached to
Repair Roof - Building 350
Solicitation number
W52P1J-22-R-5006
Issued by

About this file

This document is a submittal register for a federal contract to repair the roof of Building 350 on the Rock Island Arsenal. Key details include that the Army Contracting Command - Rock Island is soliciting proposals under solicitation number W52P1J-22-R-5006 to replace the roofing system. The submittal register lists required submittals and documentation for the roof repair project, including accident prevention plans, waste management plans, shop drawings, product data sheets, manufacturer instructions, testing reports, warranties, and certificates. It provides deadlines and requirements for submitting this documentation to the government for review and approval throughout the project period.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES

Repair Roof - Building 350

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.6.1 GAPP - Construction

1.6 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.10Notifications and Reports

1.10.2 GAccident Reports

1.10.3LHE Inspection Reports

SD-07 Certificates

1.5.1.4Crane Operators/Riggers

1.6.3.1 GStandard Lift Plan

1.7Activity Hazard Analysis (AHA)

1.8.1Hot Work Permit

1.10.4Certificate of Compliance

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 74 19 SD-01 Preconstruction Submittals

1.5 GConstruction Waste Management

Plan

1.7.2Quarterly Reports

01 78 00 SD-11 Closeout Submittals

3.1 GAs-Built Drawings

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

07 22 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES

07 22 00 2.1 GInsulation

1.3 GCover Board

2.2 GFasteners

SD-06 Test Reports

1.6.1 GFlame Spread Rating

SD-07 Certificates

1.5 GInstaller Qualifications

SD-08 Manufacturer’s Instructions

2.2 GFasteners

2.1 GInsulation

07 53 23 SD-02 Shop Drawings

1.3.1Roof Plan Drawing

1.3.1Wind Load Calculations

1.3.1Boundaries of Enhanced

Perimeter

1.3.1Corner Attachments of Roof

System Components

1.3.1Location of Perimeter Half-Sheets

1.3.1Spacing of Perimeter, Corner, and Infield Fasteners

1.3.1Slopes and Drain Locations

SD-03 Product Data

2.2Cement

2.1.1 GEPDM Sheet

2.1.2Seam Tape

2.1.4Bonding Adhesive

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES

07 53 23 2.1.3Lap Splice Adhesive

2.1.6Water Cutoff Mastic/Water Block

2.1.5Lap Cleaner, Lap Sealant, and

Edge Treatment

3.3Flashings

2.1.7Flashing Accessories

2.1.7.1Flashing Tape

2.1.8Fasteners and Plates

2.1.9Roof Insulation

SD-05 Design Data

GWind Uplift Calculations

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.4.4 GWind Uplift Resistance

SD-08 Manufacturer’s Instructions

3.2 GApplication

3.2.3 GApplication Method

3.3.2 GMembrane Flashing

2.1.2Seam Tape

3.2.4Tape Seams / Lap Splices

3.2.5Adhesive Seams / Lap Splices

3.2.6Perimeter Attachment

3.2.4Primer

3.2.7Fasteners

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES

07 53 23 1.8Warranty

07 92 00 SD-03 Product Data

2.1 GSealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR