This document is a Performance Work Statement (PWS) for a non-personal services contract to provide refuse and recycle removal and disposal services at the Rock Island Arsenal in Rock Island, Illinois. The key objectives are to remove and dispose of solid waste in a timely, efficient, and environmentally conscious manner, and to compile historical data and submit required reports. The PWS details the performance requirements, standards, and acceptable quality levels for specific tasks such as regularly scheduled refuse and recycle collections, disposal methods, and handling of special wastes. It also covers contractor requirements for security, safety, training, and environmental compliance. The related federal contract opportunity is a solicitation by the Army Contracting Command - Rock Island for these refuse and recycle removal and disposal services at the Rock Island Arsenal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work
Statement (PWS)
Refuse and Recycle
Removal and Disposal
US Army Garrison
Rock Island Arsenal (USAG RIA)
24 April 2024
Table of Contents
INTRODUCTION
Background
Objectives
Climatic Conditions
2.0 REQUIREMENTS
2.1 Description of Services
2.1.1 Non-Personal Services
2.1.2 General Information
2.1.3 Place of Performance and Hours of Operation
2.1.4 Federal Holidays
2.1.5 Contract Administration and management
2.1.6 COR Functions
2.1.7 Quality Control (QC)
2.1.8 Contractor Employees
2.1.9 Business Relations
2.2 Work Management
2.2.1 Coordination
2.3 Historic Property or Archaeological Site
2.4 Special Requirements
2.4.1 Security
2.4.2 Security Training
2.4.3 Safety
2.4.4 Training, Physical Requirements, or other Expertise Required
2.4.5 Environmental Requirements
3.0 PERFORMANCE REQUIREMENTS AND STANDARDS
3.1 High Level Objectives (HLO)
3.1.1 Performance Task Requirements, Standards and Acceptable Quality Levels
(AQLs)
3.1.2 Specific Tasks………………………………………………………………………..….. 9
3.2 Transition
3.3 Contractor Manpower Reporting (CMR)
3.3.1 Reporting Labor Hours
4.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS) MATRIX
4.1 Quality Assurance
4.2 Quality Control Plan (QCP)
5.0 DELIVERABLES
6.0 RELATED DOCUMENTS
6.1 Definitions and Acronyms
6.1.1 Definitions
6.1.2 Acronyms
6.2 Applicable Directives, Publications
6.3 Technical Exhibits (TE)
6.4 Government-Furnished Material (GFM)………………………………………
6.4.1 Utilities
6.5 Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE)
6.5.1 Contractor-Furnished Material and Responsibilities
6.5.2 Contractor-Furnished Items
6.5.3. Contractor Facilities
1. Introduction.
This is a non-personal services contract to provide refuse and recycle removal and disposal on the Rock Island Arsenal, Rock Island IL. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS).
Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS.
1.1 Background. Rock Island Arsenal was established by an Act of Congress in 1862 at Rock Island, Illinois on an island in the Mississippi River. Rock Island Arsenal is in
Illinois, Rock Island County, Rock Island and consists of approximately 946.3 acres and
317 buildings. The population base consists of approximately 6,500 military, Government civilian, and Contactor personnel, as well as 80 resident family members.
1.2 Objectives. The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and local laws, regulations, and directives to include, but not limited to, the publications in Section 7, Related Documents. Remove and dispose of solid waste from Rock Island Arsenal in a timely, efficient, and environmentally conscious manner.
The Contractor shall compile historical data, prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.
The intent is to establish work requirements that are performance-based and results oriented. The Contractor shall determine the best and most cost-effective ways to fulfill the removal and disposal of solid waste from Rock Island Arsenal and their component needs, emphasizing innovation and commercial best practices.
1.3 Climatic Conditions. The average annual rainfall is 36 inches; with the wettest months being March - July. The average annual snowfall is 30 inches, with snowfall expected during the period of November - March. The average frost-free period
(growing season) during the year is about 150 days. The first killing frost may be expected about October, and the last killing frost generally occurs in March. The average annual maximum and minimum temperatures are approximately 90 degrees and zero degrees Fahrenheit, respectively. Monthly normal temperatures ranged from a low of zero degrees in the month of January to a high of 90 degrees in the month of
August. Summer temperatures often reach 80 degrees Fahrenheit, while sub-freezing weather is common during the winter months.
2.0 Requirements.
2.1 Description of Services. See Section 5.0 and Attachment 1 for the specific
Common Levels of Service (CLS) or Functional Area (FA) for this requirement.
2.1.1 Non-Personal Services. The personnel rendering the services are not subject;
either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.
2.1.2 General Information.
2.1.3 Place of Performance and Hours of Operation.
2.1.3.1 Place of Performance. The work to be performed under this contract will be performed at the locations listed in Technical Exhibit (TE) 2, Dumpster Inventory at the Rock Island Arsenal.
2.1.3.2 Hours of Operation. The Government's regular (normal) hours are from
0700 – 1600 hours, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall conduct business during regular hours.
2.1.4 Federal Holidays. The Contractor’s performance shall not be required on the
Federal public holidays listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C. 6103).
Birthday of Martin Luther King Jr
Memorial Day
Independence Day
Columbus Day
Thanksgiving Day
New Year’s Day
Washington’s Birthday (President’s Day).
Juneteenth National Independence Day
Labor Day
Veterans Day
Christmas Day
The Contractor shall provide personnel support within 8 hours of notification outside the normal hours of operation as required, including holidays, to support the Directorate of
Public Works (DPW) mission. Prior to performance of services outside the locally established hours of operation, the Contractor shall request and obtain, in writing, approval from the KO. The Program Manager shall be available after normal hours to serve as the central point of contact for Contractor operations. Contractor personnel shall not be scheduled for overtime work.
2.1.4.1 Installation Closures. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:
Reschedule the work to be performed the following day unless the following day is a
Saturday, Sunday, a legal public holiday, and when routine work is not scheduled for that day; or reschedule the work on any day mutually satisfactory.
2.1.4.2 Inclement Weather Delay. If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall notify the KO if inclement weather suspends operations within 8 hours. The Contractor shall resume operations with KO approval.
The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO and COR not later than (NLT) two (2) hours of the incident.
The Contractor shall be responsible for the emergency medical treatment services for
Contractor personnel.
2.1.5 Contract Administration and management.
2.1.5.1 Post Award Conference/Performance Evaluation Meetings. The
Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5.
2.1.5.2 Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
2.1.5.3 The following provides the roles and their respective authority during the performance of the contract:
2.1.5.3.1 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the
KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be affected by the
KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this
PWS.
2.1.5.3.2 Contracting Officer’s Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of
Service Acquisitions. Other surveillance personnel may be designated as COR or
Alternate Contracting Officer’s Representative (ACOR), and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s Representative
(COR) Certification and DFARS 201.602-2. The ACOR will serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR.
The COR will aid in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR will perform IAW the responsibilities and duties identified in the appointment letter.
2.1.5.3.2.1 COR Authority. A letter of designation will be issued to the COR by the KO.
A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR, especially regarding changes in cost, price estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions regarding cost, quantity, or schedule of the resulting order.
2.1.5.3.3. The Contractor shall not in any way represent the United States (U.S.)
Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.1.6 COR Functions. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract;
perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Material, and coordinate site entry of Contractor personnel.
2.1.7 Quality Control (QC). Quality Control is the responsibility of the Contractor. The
Contractor shall provide a Quality Control Plan (QCP) five (5) business days before contract start. The Contractor shall provide and maintain a QCP that is acceptable to the KO. Changes to the Contractor’s QCP shall be submitted to the KO for review and approval within five (5) business days prior to implementation.
Contractor Employees.
2.1.8.1 The Contractor shall provide a Program Manager who is responsible for the performance of the work. The Program Manager shall have full authority to act for the
Contractor on all contract matters relating to daily operation of the contract. The name of the Program Manager shall be provided by the Contractor to the KO. The Program
Manager shall be available between 0700 - 1600 hours, Monday through Friday except
Federal holidays or when the Government facility is closed for administrative reasons.
Contractor personnel performing work under this contract shall have and maintain a certain security measure at time of the contract start date and for the life of the contract.
Security measures will change as FPCON requirements are increased. This will cause minor mission specific delays due to measures being enforced at Access Control Points and work site areas. FPCON measures:
• NORMAL: Expect routine security posture.
• ALPHA: Expect random vehicle checks and increased crime prevention efforts.
• BRAVO: Minor delays due to increased ID, vehicle inspections and organization specific measures at building entry areas. Expect closer inspections of contractor and delivery vehicles.
• CHARLIE: Minor delays due to rigorous vehicle inspections and organization specific measures at building entry areas. Expect closer inspections of contractor and delivery vehicles.
• DELTA: Expect delays and interruption in normal routines. You will not be allowed access to the installation unless you have been previously deemed mission essential by the KO and/or COR.
The Program Manager and any individuals designated as key personnel shall be able to understand, speak, read, and write the English language.
2.1.8.2 All Contractor employees accessing RIA shall be legal U.S. residents. The
Contractor shall immediately remove any employee that is not a legal U.S. resident.
The Contractor personnel shall be able to communicate clearly in the English language.
2.1.8.3 Qualification Standards. The Contractor shall inspect, repair, and maintain systems and components associated with facilities listed in real property records as required throughout this contract utilizing properly trained, skilled, and qualified employees or subcontractor personnel. The Contractor shall provide objective evidence of key personnel qualifications and years of experience to the KO for review and acceptance.
2.1.8.4 Contractor Identification. The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.
2.1.8.5 Standards of Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The
Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all
Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The
Contractor shall ensure employee conduct complies with 41 USC 423, Procurement
Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.
2.1.8.6 Contractor Hiring Restrictions. The Contractor shall not hire or subcontract with off duty or former Government employees whose employment would result in a conflict of interest.
2.1.8.7 Organizational Conflict of Interest (OCI). N/A
2.1.9 Business Relations. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the COR corrective action plans and timely identification of issues. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.
2.2 Work Management
2.2.1 Coordination. The Contractor shall schedule and coordinate with the COR to minimize disruptions to the facility mission.
2.3 Historic Property or Archaeological Site. Historic properties and archaeological sites are subject to the provisions of the National Historic Preservation Act (NHPA). The
Contractor shall maintain the historic properties on the installation IAW the NHPA, 54
United States Code (U.S.C) § 300101, National Preservation; 36 Code of Federal
Regulations (CFR) Part 800, Advisory Council on Historic Preservation; and United
Facilities Guide Specifications (UFGS). The Contractor shall comply with all applicable
Federal historical structure and archeological laws.
2.4 Special Requirements.
2.4.1 Security.
2.4.1.1 Access and General Protection/Security Policy and Procedures. The
Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by Department of Defense (DOD), Headquarters Department of the Army
(HQDA), and local policy. The COR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.
2.4.1.2 Motor Vehicle Operators. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated.
2.4.1.3 Contractor Vehicle Registration. The Contractor shall register all Contractor owned or operated vehicles and trailers operating on the installation within 30 working days of contract start date. The Contractor shall complete all applications with the
Provost Marshal Vehicle Registration section located in Building 23. Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.
2.4.1.4 The Contractor shall provide all information required for background checks to meet installation access requirements, to be accomplished by the installation Provost
Marshall Office, Director of Emergency Services, or Security Office.
2.4.1.5 Physical Security. The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. The Contractor shall secure
Government facilities, equipment, and materials at the close of each work period. If any damage occurs to any Government furnished refuse cans, containers, or facilities through neglect or abuse by contractor personnel, necessary repairs or replacement of equipment shall be made by the contractor at the contractor's expense. Repairs or replacement as required will be made at the earliest practical date (within 10 working days) after notification is made to the contractor by the COR.
2.4.2 Security Training.
2.4.2.1 iWATCH Training. The Contractor shall brief the local iWATCH program
(training standards provided by the RIA’s Anti-Terrorism Officer (ATO)) to all the
Contractor’s employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. The Contractor shall complete the training within thirty
(30) calendar days of contract award and within five (5) calendar days of new employees commencing performance with the results reported to the COR NLT thirty
(30) calendar days after contract award.
2.4.3 Safety. The Contractor shall safeguard and maintain all Government and
Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army
Safety Program.
2.4.3.1 Safety Plan. The Contractor shall develop and implement a safety program for its employees. The Contractor shall submit the Safety Plan to the KO for review and acceptance within ten (10) days of commencement of work. Revisions shall be submitted five (5) calendar days prior to the effective date of change.
2.4.3.2 Occupational Safety and Health. The Contractor shall comply with the
Occupational Safety and Health Administration (OSHA) standards. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.
2.4.4 Training, Physical Requirements, or other Expertise Required.
2.4.4.1 The Contractor shall ensure all Contractor’s employees and associated subcontractors are certified or licensed in the specific areas required by the State of
Illinois. The Contractor shall ensure employees are certified or licensed in the appropriate Environmental Protection Agency (EPA) areas required. The Contractor shall ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR within twenty-four (24) hours prior to employees commencing performance.
2.4.5 Environmental Requirements.
2.4.5.1 The Contractor shall follow all environmental requirements in accordance with this PWS.
a. Compliance with Environmental Laws and Regulations. Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement.
Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200- 1, and any specifications within this contract to the KO/COR. The Environmental Coordinator's Office will review questions on environmental compliance, and provide guidance as needed. In case of an environmental event or disaster, the Contractor shall comply with the Government's emergency services plan. All environmental protection matters shall be coordinated with the KO/COR.
b. Reporting Noncompliance and Citations. Citations/Fines for non-compliance with environmental standards on Government facilities operated by the Contractor are a matter for resolution through the Environmental Coordinator's Office and between the RIA Garrison Commander and the issuing office of Environmental Protection Agency
(EPA) or State of Illinois Regulatory Authorities. If the citations/fines are issued due to faulty operation or maintenance practices, the KO/COR shall deduct the fine from any monies due the Contractor.
c. Prevention of Storm Water Pollution. The Contractor shall comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated in accordance with all regulations and policies as applicable to the National Pollutant Discharge Elimination System (NPDES) and practice spill prevention and good housekeeping.
d. Prevention of Spills: Contractor shall adopt the installation's Spill Prevention Control and Countermeasures Plan (SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department).
f. Corrective Action for Noncompliance. Contractor shall when given a verbal and/or written notice of environmental noncompliance or nonconformance by the KO/COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.
3.0 Performance Requirements and Standards.
3.1 High Level Objectives (HLO).
3.1.1 Performance Task Requirements, Standards and Acceptable Quality Levels
(AQLs). Damages caused by Contractor employees shall be repaired at no cost to the
Government. The Contractor shall notify the COR and return the damaged area to its previous condition. The Contractor shall furnish all labor, materials, and equipment to perform the repair work including cultivating and applying seed, sprigging, or placing sod. The Contractor shall maintain all turf repair work to ensure successful growth.
3.1.2 Specific Tasks and Operating Standards
3.1.2.1 REGULARLY SCHEDULED COLLECTIONS: The contractor, shall always, maintain a system of regularly scheduled collections, see TE 2, Dumpster Inventory. Properly trained personnel and standard, commercial type, approved collection vehicles shall be always maintained in the work area to provide an efficient operation. Adequate operating procedures shall be established by the contractor to prevent injury of personnel from slips, falls, strains, cuts, and motor vehicle accidents. All personnel shall be equipped with adequate protective clothing and equipment necessary for this type of work. The collection of refuse shall always be performed in a manner satisfactory to the KO and COR.
Necessary security passes and gate passes will be arranged by the COR with the least amount of delay possible.
3.1.2.2 DISPOSAL OF REFUSE: The contractor shall strictly comply with all federal, state, and local laws and regulations dealing with the transportation and disposal of refuse waste, including, but not limited to, all environmental, safety laws and regulations. This compliance is required regardless of whether the laws and regulations are actively enforced by the federal, state, or local authorities. Should any federal, state, or local laws and/or regulations conflict, the contractor shall adhere to the most stringent law or regulation. If, during the term of this contract, either the federal, state, or local laws or regulations are amended to become more stringent, and the contractor is placed under a greater burden to comply with them, the contractor shall comply with the amended law or regulation. The contractor shall dispose of all refuse only at a state-approved disposal site. If the contractor elects to dispose of refuse at an alternate site, a copy of the new disposal site operation permits shall be submitted to COR at least 10 days prior to taking such action. The collection and disposal of wastes shall always be performed in a manner satisfactory to the KO.
3.1.2.3 DISPOSAL OF RECYCLEABLE SINGLE STREAM: The contractor shall strictly comply with all federal, state, and local laws and regulations dealing with the transportation and disposal of recycle waste, including, but not limited to, all environmental, safety laws and regulations.
3.1.2.4 METHOD OF COLLECTION: All refuse and recycle shall be collected from each established pickup station, parks, or building(s). Refuse and recycle containers shall be emptied into collection equipment at the pickup station and after being emptied, shall be returned to the pickup station, and placed in an orderly manner. Any refuse or recycle spilled on the ground during the loading operation shall be picked up by the contractor prior to the collection vehicle leaving the pickup station. After pickup all lids shall be placed in the closed position.
3.1.2.5 REFUSE AND RECYCLE IN TRANSIT: Transportation of refuse and recycle shall be conducted by the contractor in compliance with all federal, state, and local refuse transportation laws and regulations. If the contractor intends to transport the refuse or recycle into, out of, or through, any state, which requires a permit for such transportation, the contractor shall provide the COR with a copy of the transportation permit(s). The contractor shall, at his own expense, and without reimbursement from the Government, immediately clean up any refuse and/or recycle spilled during loading or transportation to the disposal site. The contractor shall inspect each open-top, roll-off container before transportation to the disposal site. It shall be the responsibility of the contractor to ensure that refuse and recycle does not spill out of the open-top containers during loading or transporting, and a load cover is required.
VEHICLE OPERATIONS: All vehicles utilized by the contractor shall be properly enclosed to prevent spillage, leakage, excessive odors, and the scattering of refuse during transit. All contractor personnel who operate vehicles shall always maintain the required licenses to operate such vehicle and display valid state license plates. Vehicles shall be maintained in safe operating condition and good appearance. All contractor-owned motor vehicles used for transporting refuse shall be properly equipped and designed to ensure safety and security. All contractor-owned vehicles shall display the contractors name on both sides of the vehicle.
3.1.2.6 COLLECTION SCHEDULE: See Technical Exhibit (TE) 2
3.1.2.7 UNSCHEDULED REFUSE AND RECYCLE REQUIREMENTS: Requests are made by the COR to the contractor’s Dispatch when disposal service is required.
The contractor will be notified twenty-four (24) hours in advance for the pickup requirements. See TE 2, Dumpster Inventory, for dumpster requirements. See TE 1, Historical Data for Call-In Dumpsters.
3.1.2.8 COLLECTION FOR NON-HAZARDOUS SPECIAL WASTE, SPENT
FOUNDRY SAND HONING SLUDGE, FOUNDRY SLAG AND BAG AND SPENT
GARNET: The collection stations for the sands (2ea) and slag and bag (1ea) are in the west court of building 212, these three (3), 12 cubic yard containers shall be leak resistant steel containers. Containers will be capable of withstanding the heat of the foundry sand and slag coming direct from RIA foundry operations. The collection station for the garnet waste is in the west court of building 240 (1ea) and the west court of building 208 (1ea). These containers will be weighed by the contractor at the scale located at building 299 east prior to transporting to ensure proper weight limitations are met. The scale house gates are open until 1400, Monday through Friday.
The contractors shall be restricted to ONLY foundry special waste debris and slag, to reduce the potential of fire from dumping of paper, cardboard, and wood. Honing sludge or waste foundry sands shall not be mixed with paper or garbage or other wastes from the administrative areas.
The contractor shall dispose of the contents of each container and properly replace the container back to its original location.
The Contractor shall weigh each load at landfill and weight tickets returned to the
COR. Upon the request of the COR, the Contractor shall randomly weigh loads for comparison.
The COR will complete manifests for the slag and bag waste and the garnet waste that shall be signed by both the COR and driver prior to transporting the load and will accompany the load to the landfill. A signed copy of the manifest will be given to COR after the landfill personnel sign off as receiving the waste.
The quantity of nonhazardous special waste, foundry sand, garnet, slag and bag, debris that will be generated is dependent on the level of shop activities. The foam dumpster is a 30 cubic yard open top construction style dumpster that is included in section noncompacted waste.
3.1.2.9 TEMPORARY 30-YD OPEN TOP DUMPSTERS – The contractor shall provide, within four (4) working days of notification from the COR, up to five (5) temporary 30-yd open top dumpsters. Placement of the dumpsters will be determined by the COR and pick-up, when filled, will be within one week of dumpster placement upon notification by the COR.
3.1.2.10 OPERATING RECORDS:
Collection records shall be kept for each load of refuse and recyclables disposed.
Records shall indicate the total monthly collection in terms of cubic yards of refuse and recyclables removed from RIA. These records shall be given to the COR for each monthly invoice.
Refuse tickets shall be signed by the contractor and countersigned by the COR. One copy shall be retained by the contractor and one (1) copy shall be left for the COR for each load of refuse removed.
3.1.2.11 PICK-UP ROUTES:
The contractor shall follow the most expedient routes through the installation in making pickups, recognizing deviations shall be necessary due to variations in the quantities of generated refuse caused by installation operations. All routes shall be approved in advance by the COR or their authorized representative.
3.2 Transition (Phase In/Phase Out). The Contractor shall prepare and submit a
Phase In/Phase Out Plan to be implemented by the Contractor. The Contractor shall have key personnel on board, during the 30-day transition period. The plan shall specify a training program and a date for transferring responsibilities for the work and shall be subject to the KO's approval. The Contractor shall provide sufficient experienced personnel during the phase-in and phase-out period to ensure that the services are maintained at the required level of proficiency. All contractor furnished containers and equipment shall be in place and operational by the end of the 30-day transition period.
3.3 Contractor Manpower Reporting (CMR).
3.3.1 Reporting Labor Hours. Contractor Manpower Reporting (CMR): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall supply all the information in the format using the following web address https://sam.gov. The required information includes:
(1) Contracting Office, Contracting Officer, or also known as the Contracting Officer’s Representative (COR)
(2) Contract number, including task and delivery order number https://sam.gov/
(3) Beginning and ending dates covered by reporting period
(4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data
(5) Estimated direct labor hours (including sub-Contractors)
(6) Estimated direct labor dollars paid this reporting period (including sub-Contractors)
(7) Total payments (including sub-Contractors)
(8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different)
(9) Estimated data collection cost
(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information)
(11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website)
(12) Presence of deployment or contingency contract language
(13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country).
As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 March of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
Reporting period shall be the PoP not to exceed twelve (12) months ending thirty (30)
September of each Government FY and must be reported by 31 October of each calendar year. The Contractor shall use a direct data transfer to the database server or fill in the fields on the website. The direct transfer is a format for transferring files from a
Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The Contractor shall report the required information to the CMR system’s secure database.
The COR is responsible for verifying that the Contractor has reported the required data.
4.0 Performance Requirements Summary (PRS) Matrix.
Required Services
Performance
Standard
Acceptable Quality Level
(AQL) Method of Surveillance
Incentive (Positive and/or
Negative)
# 1.
Contractor shall ensure all work accomplished meets all maintenance and repair standards listed in TE 2 and all applicable Federal, State, and local laws, regulations and directives to include, but not limited to applicable publications in Section.
7, Related Documents.
The Contractor shall provide services IAW PWS, para. 3.0
2% Deviation from performance
Standard; % calculated by dividing the number of defects by the number of observations.
Random Sampling and Customer Complaints:
Inspections and complaint validations performed by the COR.
Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR System.
Contractor shall re-perform the service.
# 2.
The Program Manager shall be available from 0700-1600 to serve as the central point of contact for Contractor operations.
The Contractor shall provide a central point of contact IAW PWS, para.
2.1.8.1.
Zero Deviation from performance standard
100% daily and verification/confirmation by the COR.
Non-conforming services will result in Nonconforming Reports issued to
Contractor and potential negative
CPARS report.
#3.
The Contractor shall develop and maintain a
Quality Control Plan approved by the KO.
The Contractor shall provide a
QCP IAW PWS,
para, 4.2.
Zero Deviation standard.
Review and acceptance by the by the KO on submission of QCP and each revised QCP.
Non-conforming services will result in Nonconforming
Reports issued and a potential negative CPARS narrative.
# 4.
The Contractor shall remove, from the job site, any employee for reasons of misconduct or security.
Employee conduct complies with 41 U.S.C. 423, Procurement Integrity, IAW PWS para.
2.4.1
Zero Deviation standard.
The COR will review 100% of Contractor reported occurrences of Contractor employee misconduct, including but not limited to violations of any provision indicated at 41 U.S.C. 423, and/or security violation to ensure the offending employee is removed from the job site.
Non-conforming services will result in Nonconforming Reports issued to
Contractor and potential equitable adjustment by the
Contracting Officer.
#5.
Damages caused by Contractor employees shall be repaired at no cost to the Government.
The Contractor shall notify the COR and return the damaged area to its previous condition AW PWS, para.
3.1.1.1.
Zero Deviation standard
COR will review 100% of damage reports.
Non-conforming services will result in Nonconforming
Reports issued and a potential negative CPARS narrative.
#6.
The Contractor will ensure that the licenses or certificates and training of Contractor personnel are kept current. Copies of these licenses or certifications will be provided to the COR.
The Contractor shall perform
IAW PWS,
para. 2.3.4.1.
Zero Deviation standard (Risk assessed high risk)
100 Percent Inspection of copies of these licenses or certifications
Non-conforming services will result in Nonconforming Reports issued and a potential negative CPARS narrative
4.1 Quality Assurance. The Government will evaluate the Contractor’s performance under the contract IAW the Government’s Quality Assurance Surveillance Plan (QASP).
QASPs are "living documents," dynamic, adaptable, and subject to modification based on Contractor performance surveillance results. The QASP is not part of the PWS and will not be issued with the solicitation. The QASP focuses on the procedures and processes the Government will implement to assure the Contractor is performing IAW the performance standards within the PWS. The Government plan defines the criteria of how the Contractor’s performance will be evaluated, the frequency of surveillance, and the items to be inspected. Although the Government will develop a QASP, Government surveillance of Contractor performance is not limited to the QASP, or the performance objectives, outlined in the Performance Requirements Summary (PRS).
The Government retains the right to evaluate all services required by the contract. The
Government will perform inspections and tests in a manner that will not unduly delay the work. If any of the services performed do not conform to contract requirements, the
Contractor shall perform the services again at no additional cost to the Government.
4.2 Quality Control Plan (QCP). Quality control is the responsibility of the Contractor.
The Contractor shall develop, implement, and maintain an effective quality control program which shall be documented in a QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify and prevent the recurrence of defective services. The Contractor’s QCP is how they assure themselves that the work conforms to contract requirements. The basic principle of the plan is that the Contractor is responsible for quality control. The QCP shall be constructed in such a manner that each CLS service can be individually identified. The
Contractor's QCP shall include a separate section, which addresses the Contractor's method of managing quality of work. The QCP shall include a description of the inspection system to address services listed in this PWS, and a description of the methods to be used for identifying and preventing defects in the quality of services performed. The plan shall include a description of the Contractor’s inspection system to include specifics as to areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the Contractor’s inspectors. The Contractor shall develop, maintain, and submit a QCP to the KO for acceptance within thirty (30) calendar days after the contract is awarded. The
Contractor shall submit any proposed changes in the QCP to the KO for written approval five (5) working days prior to implementation.
5.0 Deliverables
Deliverable Frequency # of Copies Medium/Format Submit To
Monthly Pickups Invoice
Monthly before the 5 th day of the next month
One (1) copy emailed to the
COR for monthly pickups list.
Excel spreadsheet in medium format, sent as an attachment.
COR
Landfill weight tickets for manifested waste, i.e., the Slag/bag and the
Garnet
Each load One (1) copy attached and emailed to the COR
Medium Format COR
Weight tickets from the scale at building 299
Each Load White copy goes with driver and yellow tickets goes to the
COR
Standard ticket from scale at building 299
COR
Manifests
– original copy with required signatures.
Monthly before the th day of the next month
One (1) copy for each load in the month
Medium Format Mailed to:
COR
Name
1 Rock
Island
Arsenal
6.0 Related Documents.
6.1 Definitions and Acronyms
6.1.1 Definitions.
6.1.1.1 Acceptable Quality Level (AQL). The AQL is the maximum percent defective (or the number of defects per hundred units) for the purposes of sampling inspection can be considered satisfactory.
6.1.1.2 Alternate Contracting Officer’s Representative (ACOR). An employee of the
U.S. Government provided by the RA and appointed by the KO to provide support to
CORs in monitoring and documenting the Contractor’s performance. These alternate surveillance support personnel will serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR.
6.1.1.3 Ashes. The residue from burned wood, coal, coke, and other combustible material.
6.1.1.4 Bulk Waste. Large items of solid waste such as household appliances, furniture, auto parts, pallets, shelving, piping, stone, concrete rubble, brick, lumber, toys, and other wastes; the size or weight of which, precludes or complicates the handling by normal collection, processing, or disposal methods.
6.1.1.5 Collection. The pickup of accumulated recyclable material, solid waste, including bulky waste, from any collection point, regardless of quantity.
6.1.1.6 Collection Frequency. The number of times collection is performed during a specific time frame.
6.1.1.7 Collection Point. The location designated on the drawings or maps or described in this performance work statement where solid waste, including bulky materials, will be temporarily stored for collection by the Contractor.
6.1.1.8 Commercial Solid Waste. All types of solid waste generated by stores, offices, restaurants, warehouses, and other non-manufacturing activities, excluding residential and industrial waste.
6.1.1.9 Construction and Demolition (C&D) Waste. The waste building materials, packaging and rubble resulting from construction, remolding, repair, and demolition operation on pavement, housing, commercial buildings, and other structures.
6.1.1.10 Contract Administrator (CA). The official Government representative delegated authority by the KO to administer a contract. This individual, normally working in an appropriate contracting or procurement career field, advises on all technical contractual matters.
6.1.1.11 Contract Discrepancy. A failure of the Contractor to perform IAW contract requirements and specifications, e.g., a failure of the Contractor to provide, or provide on time, the required contract products, or services; or it may result because delivered products or services do not meet specific contract requirements.
6.1.1.12 Contract Discrepancy Report (CDR). A report used to document other than satisfactory Contractor performance. The CDR requires the Contractor to explain, in writing, why performance is other than satisfactory; how performance shall be returned to satisfactory levels; and how recurrence of the problem shall be prevented in the future.
6.1.1.13 Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
6.1.1.14 Contractor Acquired Property (CAP). Property acquired, fabricated, or otherwise provided by the Contractor for performing a contract. Contractor retains title.
6.1.1.15 Contracting Officer (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the
Government. Note: The only individual who can legally bind the Government.
6.1.1.16 Contracting Officer’s Representative (COR). An employee of the U.S.
Government appointed by the KO to help administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications.
This individual does NOT have authority to change the terms and conditions of the contract.
6.1.1.17 Curb Side Pick-Up. Collection of solid waste or recyclable materials (to include bulky waste) that is placed next to curb, doorway, or alley by the supported activity.
This refers to locations that are not serviced by bulk containers (dumpsters or compactors).
6.1.1.18 Debris. Includes, but is not limited to, paper, cans, bottles, cigarette butts, cardboard, plastic, limbs and branches, pine straw and pinecones, leaves, rocks, and other similar items.
6.1.1.19 Defective Service. A service output that does not meet the standard of performance associated with the PWS.
6.1.1.20 Deliverable. Anything that can be delivered; can include non-manufactured things, such as meeting minutes or reports.
6.1.1.21 Equipment. A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract.
Equipment is not intended for sale and does not ordinarily lose its identity or become a component part of another article, when put into use. Equipment does not include material, real property, special test equipment or special tooling.
6.1.1.22 Food Waste. Organic residue generated by the handling, storage, sale, preparation, cooking and serving of foods.
6.1.1.23 Garbage. Animal and vegetable waste resulting from the handling, preparation, cooking, and consumption of foods.
6.1.1.24 General Fund Enterprise Business System (GFEBS). GFEBS is the U.S.
Army's web-based enabled financial, asset, and accounting management system that standardizes, streamlines, and shares critical financial data across the Active Army, the
Army National Guard, and the Army Reserves. GFEBS is the work management system that the Directorate of Public Works uses for all order types and projects.
6.1.1.25 Generation. The act or process of producing refuse (solid waste) or recyclable materials.
6.1.1.26 Government-Furnished Material (GFM). Property in the possession of, or directly acquired by, the Government and included for performance of a contract.
Government-furnished material includes, but is not limited to, Government provided trash bins and refuse cans.
6.1.1.27 Government Property. All property owned or leased by the Government.
Government property includes both Government-furnished property and Government purchased Contractor-acquired property.