This Performance Work Statement (PWS) details preventative maintenance, calibration, and emergency repair services for Crane Army Ammunition Activity's (CAAA) thermal analysis and microcalorimetry equipment. The specific equipment includes a Discovery DSC250 differential scanning calorimeter, Discovery SDT650 simultaneous thermal analyzer, and TAM IV microcalorimeter located in Buildings 3295 and 2167. The contract is for one year with a possible one-year option, seeking a factory-trained technician from TA Instruments to perform annual preventative maintenance, calibration, software updates, and emergency repairs.
The solicitation (W519TC-25-Q-TAME) is a sole-source procurement targeting TA Instruments-Waters LLC under FAR 13.106-1(b)(1), with proposal submissions due by 1:00 PM CST on 04 June 2025. Key service requirements include one annual PM/calibration visit per system, unlimited emergency repair visits, remote technical support, NIST-certified calibration standards, and comprehensive reporting. The contractor must provide verification stickers, calibration certificates, and respond to emergency requests within 48 hours. The total contract value is not specified, but the government will conduct a price analysis to determine reasonableness.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Attachment 0002 - Price Matrix.xlsx | XLSX spreadsheet | |
| B08_Attachment 0003 - FAR 52.204-24 - Copy.docx | DOCX document | |
| B08_Attachment 0005 - Solicitation Provisions and Clauses.docx | DOCX document | |
| B08_Attachment 0004 - FAR 52.212-3 Alt 1 - Copy.docx | DOCX document | |
| B08_Attachment 0006 - Wage Determination.pdf | ||
| B08_Attachment 0007_Justification for Sole Source (KO Signed).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Crane Army Ammunition Activity 2025 CAAA NEW TA INSTRUMENTS PREVENTATIVE MAINTENANCE, CALIBRATION AND EMERGENCY SERVICE CONTRACT Feb 05, 2025 DESCRIPTION OF REQUIREMENT. Crane Army Ammunition Activity (CAAA), Crane, IN, has a requirement to obtain annual preventative maintenance (PM), calibration and emergency repair services for its TA Instruments Inc. thermal analysis and microcalorimetry instrumentation. Specifically, this includes our DSC250 differential scanning calorimeter, SDT650 simultaneous thermal analyzer, and TAM IV microcalorimeter. These PM calibration and repair services will be in direct support of production and manufacturing of ammunition products.
1.0 OBJECTIVE: A key mission of the Chem Lab to provide advanced instrumental testing for materials for all CAAA commodities and divisions. CAAA does not have the technical expertise to perform detailed PM and repair of its advanced thermal analysis laboratory equipment. This service must be performed by a factory trained, certified technician. The objective of this PWS is to obtain a contract to provide PM, calibration and emergency service for CAAA Chem Lab’s thermal analysis and microcalorimetry equipment.
2.0 SCOPE. The scope of this effort includes services necessary to provide a full range of PM/OQ and support on the TA Instruments Inc systems identified below. Primarily, services provided will focus on the hardware components but also include software applications/updates as well.
2.1 BLDG 3295 System/Equipment: Discovery DSC250 with RCS 90
2.1.1 DSC250 Serial Number: DSC2-02755 (part no. 973001.901)
2.1.2 RCS90 Serial Number: RCS91-7248 (part no. 972631.901)
2.1.3 Preventive Maintenance and Software update service.
2.1.4 Emergency Repair services.
2.2 BLDG 3295 System/Equipment: Discovery SDT650 with autosampler
2.2.1 SDT650 Serial Number: 0650-0933 (Part no. 963001.903)
2.2.2 Preventive Maintenance and Software update service.
2.2.3 Emergency Repair services.
2.3 BLDG 2167 System/Equipment: TAM IV w/ 1-nanocalorimter
2.3.1 TAM IV Serial Number: X10068 (Part no. 604000.901)
2.3.2 Nano calorimeter (1)
2.3.3 Preventive Maintenance and Software update service.
2.3.4 Emergency Repair services.
2.4 Any contract resulting from this Performance Work Statement (PWS) may be modified at any time to accommodate hardware and software system changes that affect thermal analysis/microcalorimetry application/technique/systems and/or calibration data requirements.
3.0 PLACE OF PERFORMANCE.
W53W9L Crane Army Ammunition Activity 300 Highway 361 Crane IN 47522-5001 B2167/3295
4.0 FACILITY ACCESS. The contractor will be granted access to the physical location identified in section 3.0. The Contractor shall access the installation through the Visitors Center and the Crane Gate. The CAAA COR or other AQA personnel will escort contractor to the building(s) where the instruments are located. Contractor will provide transportation for the technician(s) and equipment required to perform service.
5.0 PERIOD OF PERFORMANCE. This contract shall cover one (1) year of service and a possible one (1) option year. Within fourteen (14) days from notice of award, the contractor will contact the Contracting Officer Representative (COR) to establish the schedule of service.
6.0 SERVICE REQUIREMENTS. These instrumental systems contains unique, proprietary hardware/software that cannot be serviced by outside individuals or companies. All service and repairs to the instrument will be performed by factory trained technicians and authorized TA Instruments thermal analysis/microcalorimetry specialists.
6.1 The contractor shall provide one (1) PM/calibration service visit per annual period of performance for each of the systems identified in section 2.
6.1.1 The contractor shall provide this technical service within the scope of the PWS.
6.1.2 PM/calibration service will be scheduled within 6 weeks of contract award.
6.1.3 PM/calibration of all systems may be performed by a single technician if the technician is factory trained and certified for service of both thermal analysis and microcalorimetry instrumentation.
6.1.4 All consumable preventive maintenance supplies (solvents, wipes, calibration standards, etc) and tools shall be furnished by the contractor and included in the contract.
6.1.5 Should the equipment fail calibration/verification tests, or routine inspection indicates a need for a preventative replacement, the contractor shall forward a cost estimate for the repair service to CAAA’s QC Chemist and the Contracting Officer. The cost estimate shall include a list of parts, labor and details outlining what is and is not covered in the contracted emergency services package.
6.2 All standards or reference materials must be certified NIST materials or traceable equivalent.
6.3 Accredited, endorsed calibration certificate and preventative maintenance reports shall be provided for all components of the systems (section 2) upon completion of service or repair.
6.4 Contractor shall provide verification sticker/label for each component of the systems (section 2) upon completion of service or repair.
6.5 Contractor shall respond to emergency requests in a timely manner (email or phone response within 48 hours or 2 business days).
6.6 The Contractor shall notify the Contracting Officer of any return visits needed to repair the instruments to a fully operational condition. The Contractor shall get approval from the Contracting Officer PRIOR to return to CAAA and installation of the parts.
6.7 The contractor shall provide unlimited emergency repair visits and remote/phone support during the contract period.
6.7.1 The contractor shall provide this technical service within the scope of the PWS.
6.8 The contract shall cover all non-consumable instrument parts, labor, travel, and for all required site visits. Any consumable parts (not covered in contract) identified as failing/in need of repair during inspection will be quoted and submitted to the Contracting Officer for purchase approval PRIOR to order, installation, or continuation of repair. Contractor will provide a list of parts considered “consumable” upon request.
6.9 The contractor shall provide software updates, repair, and support. Updates are to be installed when Contractor is on site, or provided as they are released on CD, DVD, or Thumb drive and mailed to the following address:
Crane Army Ammunition Activity B148 ATTN Elaina Hughbanks B2167 300 Hwy 361 Crane, IN 47522-5001
7.0 SPECIFIC TASKS. Tasks to be performed by Contractor shall include:
7.1 Preventive Maintenance will include at a minimum:
7.1.1 Discovery DSC250 with RCS 90
7.1.1.1 Visual inspection of instrument and run test standard using traceable temperature standard to establish "as found" instrument condition.
7.1.1.2 Check software version and update if necessary.
7.1.1.3 General checks for correct appearance (clean) and operation - inlet and relief valves, filters, cooling head, lid and gaskets, cooling flange, condenser coil fins, transfer tube, and cooling can heaters. Clean, adjust and/or replace as necessary.
7.1.1.4 Check resistance for in range tolerance. Remove any foreign material or pans from cell.
7.1.1.5 Check lid for seat and adjust as needed.
7.1.1.6 Run diagnostic tests for correct operation of components-base purge orifice rate, calibration of fiber optic amplifier.
7.1.1.7 Check T zero with sapphire disks.
7.1.1.8 Perform T zero, cell constant, and temperature calibration and verify calibrations.
7.1.2 Discovery SDT650 with autosampler
7.1.2.1 Visual inspection of instrument and run test standard using traceable temperature standard to establish "as found" instrument condition.
7.1.2.2 Check software version and update if necessary.
7.1.2.3 General checks for correct appearance (clean) and operation - inlet and relief valves, filters, furnace sealing and drive mechanisms, thermocouple beams, autosampler arm drive and rods.
7.1.2.4 Standard maintenance - clean, lubricate and adjust the components above.
7.1.2.5 Perform DTA baseline, TGA weight, and temperature calibration using traceable temperature standard and verify temperature calibration.
7.1.3 TAM IV w/ 1-nanocalorimter
7.1.3.1 Review of customer submitted initial GPT results.
7.1.3.2 Visually inspect overall condition of instrument and cables.
7.1.3.3 Check fans, bearings, oil, overflow pump, heat sink, and measuring cups. Clean, adjust, or replace if necessary.
7.1.3.4 Check for leaks and instrument level, adjust if necessary.
7.1.3.5 Check and adjust ampoule lifters.
7.1.3.6 Perform Biphenyl standard run on all channels.
7.1.3.7 Check temperature accuracy with calibrated external thermometer.
7.1.3.8 Check software version. Update to current version if needed.
7.1.3.9 Set-up a final GPT review files once submitted.
7.1.3.10 Provide customer with written report of results and findings.
7.2 Emergency repair will include at a minimum:
7.2.1 Assessment of the current state of the instrument and determination of repairs needed.
7.2.2 Repair and return of instrument to fully operational condition.
7.2.3 Performance verification tests (see 7.1 above) needed to verify the instrument is fully operational.
7.3 Doucumentation. The following are required:
7.3.1 Upon completion of the Preventive Maintenance or emergency repair assessment, the assigned technician/service engineer will provide documentation of findings and recommendations.
7.3.2 The Contractor shall provide PM/repair Service Report within five (5) working days to the CAAA Chemist and COR after each onsite visit.
7.3.3 The Contractor shall notify the COR, listed in the contract, and the AQA Chemist seven (7) calendar days prior to routine onsite PM/OQ visits and/or twenty-four (24) hours prior to an emergency/return repair visit. The Contractor shall provide the arrival date and time so that appropriate work permits can be issued to the Contractor.
7.3.4 The Contractor shall provide visitor pass forms to the COR, listed in the contract, seven (7) calendar days prior to routine onsite PM/OQ visits and/or twenty-four (24) hours prior to an emergency repair visit.
8.0 DELIVERY SCHEDULE.
| Deliverable |
| Deliverable Due Date |
| PM/Repair Service and Calibration Reports (contractor) |
| Within 5 working days after onsite visit |
| Email notification to COR and Chemist before each onsite visit (contractor) |
| 7 calendar days prior to routine onsite PM visit; 24 hours prior to emergency repair visit |
| Visitor pass forms to COR (contractor) |
| 7 calendar days prior to routine onsite PM visit; 24 hours prior to emergency repair visit |
| Reply to Emergency Repair Request |
| Within 2 working days (48 hours) of request |
| Preventative Maintenance and Calibration Service |
| Annually within 1 month of the previous calibration service visit |
| Telephone Technical Support Service |
| M-F 8AM-4PM EST |
8.1 The contractor shall notify CAAA’s Chemist, or the Laboratory QAS, as soon as it becomes apparent, if a scheduled visit must be moved. The contractor must include in the notification the rationale for late delivery of service and the expected date for the new delivery of service.
8.2 The Contracting Officer (with the input of the Chemist) will review the notice and provide guidance to the contractor. Such notification in no way limits the Government’s right to any and all rights and remedies up to and including termination.
9.0 PERSONNEL
9.1 The Contractor shall provide personnel with the necessary level of expertise to support the task activities and requirements in this PSW. See section 7.0.
9.2 The contractor shall provide a single point of contact that shall serve as the Service Manager for the life of the contract.
10.0 QUALITY ASSURANCE AND MONITORING OF DELIVERABLES
10.1 All work under this contract shall be monitored by the Contracting Officer and COR(s).
10.2 The Chem Lab representative (AQA Chemist) will act as the primary technical representative of the Government.
10.3 The CORs will formally assess the level of contractor performance and ascribing the extent to which acceptable performance levels have been met.
11.0 SECURITY CONSIDERATIONS
11.1 AT Level I training. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil.
11.2 Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements (CFR clause 52.204-9, Personal Identity Verification of Contract Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
11.3 Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (Army Directive 2014-05/AR 190-13); applicable installation, facility and area commander installation and facility access and local security policies and procedures (provided by Government representative); or, at OCONUS locations, in accordance with status-of-forces agreements and other theater regulations.
11.4 iWATCH Training. The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 5 calendar days of new employees commencing performance, with the results reported to the COR NLT 45 calendar days after contract award.
11.5 For contracts that require OPSEC Training. Per AR 530-1, Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
12.0 ADDITIONAL SAFETY INFORMATION
12.1 The Contractor is advised that they will at times be working inside of buildings that contain explosives. CAAA will mitigate the risk to the Contractor by ensuring explosives remain outside of the immediate area where the contractor is working. Explosive items will be kept as far as reasonably possible away from the Contractor while maintenance/repair work is being performed.
12.2 The Contractor is required to receive a safety briefing outlining all of the possible hazards prior to beginning any work in the building. Contractor shall not start any work prior to receiving this safety briefing. Safety briefings will be given by the Building Supervisor of each explosive-operating building visited.
12.3 Contractors shall wear all PPE required for an explosive area (i.e safety glasses, steel toed shoes). If the contractor does not bring the proper PPE, CAAA shall provide the PPE (i.e. shoe protectors, conductive booties, safety eyewear, etc).
12.4 Contractor shall not bring any electronic smart device into buildings containing explosives (i.e. cell phones, smart watches, fitness trackers, Bluetooth devices, headphones, laptops, printers). These items must be left in vehicle or in the building office.
12.5 Contractor shall not bring any flame producing devices, cigarettes, chewing tobacco, or vape pens into any CAAA building. No food or drinks will be allowed in the buildings.
12.6 The Contractor shall notify the building Supervisor that they have entered the building and sign the visitors log.
13.0 CONTRACT POINT OF CONTACT
Contracting Officer: Bryce T. Willett, bryce.t.willett.civ@army.mil, (309) 782-5820
Contracting Officer Representative (COR) Technical POC: Elaina Hughbanks, elaina.d.hughbanks.civ@army.mil, (812) 854-4572
14.0 PERFORMANCE REQUIREMENT SUMMARY
This PRS identifies the services required by the PWS over which the Government will exercise surveillance.
Performance Evaluation. Performance of a service will be evaluated to determine whether or not it meets the performance threshold. The contractor shall provide the Government a written response as to why the performance threshold was not met, how performance will be returned to acceptable levels, and how recurrence of the cause will be prevented in the future. When documentation does not meet performance thresholds, revising and resubmitting the documentation at no cost to the Government is the preferred method for correcting unacceptable performance.
Performance Objectives, Indicators, Thresholds, and Surveillance Methods. The services required by the contractor are summarized into performance objectives and indicators, along with the minimum standards that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Note 1: Positive incentives for meeting or exceeding the expected standards or performance may result in an above average rating in the Contractor’s past performance evaluation at the end of the contract performance period. Negative performance will be reflected on the Contractor’s past performance evaluation.
Attachment 1
PERFORMANCE REQUIREMENTS SUMMARY (PRS)
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
| The Contractor shall provide contract deliverables in accordance with the instructions in the PWS |
| Accurate, timely, and complete IAW PWS |
| One time deliverable: 100% |
| Inspections, observations and employee/customer feedback |
| IAW PWS 6.1 |
| The contractor shall provide one (1) PM/calibration service visit per annual period of performance for each of the systems identified in section 2 of the PWS. |
| One time deliverable: 100% |
| observation and employee/customer feedback |
IAW PWS 6.1.4
| All consumable preventive maintenance supplies (solvents, wipes, calibration standards, etc) and tools shall be furnished by the contractor and included in the contract. |
| Satisfactory or higher |
Random checks, observations, inspections, complaints and review of those records and files
| IAW PWS 6.1.5 |
| Should the equipment fail calibration/verification tests, or routine inspection indicates a need for a preventative replacement, the contractor shall forward a cost estimate for the repair service to CAAA’s QC Chemist and the Contracting Officer. The cost estimate shall include a list of parts, labor and details outlining what is and is not covered in the contracted emergency services package. |
| 100% of the time |
| Random checks, observations, inspections |
| IAW PWS 6.2 |
| All standards or reference materials must be certified NIST materials or traceable equivalent. |
| 100% of the time |
| Random checks, observations, inspections |
| IAW PWS 6.3 |
| Accredited, endorsed calibration certificate and preventative maintenance reports shall be provided for all components of the systems (section 2) upon completion of service or repair. |
| 100% of the time |
| Observations, inspections |
| IAW PWS 6.4 |
| Contractor shall provide verification sticker/label for each component of the systems (section 2) upon completion of service or repair. |
| 100% of the time |
| Observations |
| IAW PWS 6.5 |
| Contractor shall respond to emergency requests in a timely manner (email or phone response within 48 hours or 2 business days). |
| 100% of the time |
| Observations |
| IAW PWS 6.6 |
| The Contractor shall notify the Contracting Officer of any return visits needed to repair the instruments to a fully operational condition. The Contractor shall get approval from the Contracting Officer PRIOR to return to CAAA and installation of the parts. |
| 100% of the time |
| Random checks, observations, inspections |
| IAW PWS 6.8 |
| The contract shall cover all non-consumable instrument parts, labor, travel, and for all required site visits. Any consumable parts (not covered in contract) identified as failing/in need of repair during inspection will be quoted and submitted to the Contracting Officer for purchase approval PRIOR to order, installation, or continuation of repair. Contractor will provide a list of parts considered “consumable” upon request. |
| 100% of the time |
| Random checks, observations, inspections |
| IAW PWS 6.9 |
| The contractor shall provide software updates, repair, and support. Updates are to be installed when Contractor is on site, or provided as they are released on CD, DVD, or Thumb drive and mailed in accordance with the PWS |
| 100% of the time |
| Random checks, observations, inspections |
The evaluation ratings are as follows:
Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal - Performance does not meet some contractual requirements. The contractual performance of the task and sub-task being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.