B08_Attach_2_Drawings.pdf

PDF 20 MB Posted

Attached to
YELL 338221 - Bridge Preservation - 5 Bridges
Solicitation number
140P2025R0051
Issued by

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

631 63

19499

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

J

04/23/2025

19499

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

OHWM

SF

19499

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

O H W M

O H W M

O H W M

O

HW

M

O

HW

M

OHW

M

O

HW

M

O H W M

O H W M

O H W M

O H W M

O H W M

OHW

M

OHWM

OHWM

O H W M

O H W M

O H W M

O H W M

O H W M

OHWM

OHWM

19499

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

OHWM OHW

M

OHW

M

OHW

M

OHWMOHWMOHWMOHWM

OHWM

OHW

M

OHW

M

OHW

M

OHW

M

SF

S F

SF

SF

SF

SF

OHWM

SF

19499

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

O H W M

O H W M

O H W M

O

HW

M

O

HW

M

O H W M

O H W M

O H W M

O

HW

M

O

HW

M

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

OHWM

SF

19499

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

45 63

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

NOT TO SCALE 6348

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

NOT TO SCALE 6349

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

NOT TO SCALE 6351

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

NOT TO SCALE 6354

NOT TO SCALE 6355

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

Date:

GNIMOY

W

)l i vi C( r ee nignE lanoi s s ef o r

P

R

EDYNS EIL

O

DETOUR

AHEAD

M PH. . .

M PH. . .

ROAD

CLOSED

M PH. . .

CLOSED

AHEAD

LANE

RIGHT

5' -0

(M in

D

ROADWAY

6'-0" (Min.)

6' to 12'

4' -0

(M in

4' -0

(M in

D

1' -0

(M in

7' -0

(M in

D

NOTE: FOR SIGNS REQUIRING 6" X 6" POSTS AND

GREATER, SIGNS ARE CONSIDERED TO BE

NON-BREAKAWAY IF MULTIPLE POSTS ARE

REQUIRED AND THE POSTS CANNOT BE SPACED

A MINIMUM OF 7 FEET APART.

HOLES(SEE TABLE)

WOOD POST, (FIXED)

TRAFFIC

SIGN PANEL

1' -0

(M in

7' -0

(M in

ROADWAY

6"

2'-0" (Min.)

D

6"

2'-0" (Min.)

ROADWAY

1. MOUNT SIGNS THAT ARE WIDER THAN 3 FEET OR

LARGER THAN 10 SQUARE FEET ON DOUBLE POSTS.

2. ALL LUMBER DIMENSIONS ARE NOMINAL.

3. THE CONTRACTOR MAY SUBMIT ALTERNATE

DETAILS FOR PORTABLE SIGNS. ENSURE SIGN

MOUNTS HOLD THE SIGN FACE IN A VERTICAL

PLANE. PORTABLE SIGNS MAY BE MOUNTED LOWER

THAN FIXED SIGNS WHEN APPROVED BY THE CO.

ENSURE ALL PORTABLE SIGN SUPPORTS MEET THE

REQUIREMENTS OF MASH FOR

CRASHWORTHINESS.

4. WHEN PARKING IS PERMITTED WITHIN 200 FEET

OF THE SIGN, MOUNT THE SIGN A MINIMUM OF 7

FEET ABOVE THE PAVEMENT SURFACE.

5. WHEN APPROVED BY THE CO AND THE UTILITY

COMPANY, UTILITY POLES MAY BE USED FOR SIGN

MOUNTING.

6. FOR POSTS 4-INCH X 6-INCH AND GREATER, SEE

THE BREAKAWAY SUPPORT DETAIL. IF BREAKAWAY

DESIGN CANNOT BE USED DUE TO POST SPACING,

PLACE THE SIGN OUTSIDE THE CLEAR ZONE OR

SHIELD WITH BARRIER. DO NOT PLACE HOLES IN

POSTS OF NON-BREAKAWAY SIGNS.

7. THIS STANDARD WAS DERIVED FROM THE U.S.

DEPARTMENT OF TRANSPORTATION FLH STANDARD

E635-01.

8. CONTRACTOR TO USE PORTABLE MOUNTING FOR

SIGNS UNLESS WOOD POSTS ARE NEEDED.

CONTRACTOR SHALL GET CO APPROVAL FOR ANY

LOCATION THAT REQUIRES WOOD POST

INSTALLATION.

POST SIZE TABLE

POST SIZE D HOLE

DIAMETER

MAXIMUM SIGN AREA

(Sq. Ft.)

4" x 4" 4" x 6" 6" x 6" 6" x 8"

4' 4' 5' 5'

1 Post 2 Post 3 Post 4 Post

None Required 1.5" 2" 3"

10 20 35 50 70

165125

BREAKAWAY SUPPORT DETAIL

(FIXED SIGNS 4" X 6" AND GREATER POSTS)

RURAL AREA

URBAN AREA

FIXED ROADWAY SIGNS

PORTABLE SIGNS

(SEE NOTES 3 AND 4)

D

NOTES:

DETOUR

NOT TO SCALE 6358

NOTE:

M inor Road

M ajor Road

A

73.

[14

0'- 6.9 45"

15.

[30

15.

[30

15.

[30

ADVANCE WARNING AREA

ADVANCE WARNING AREA

C

B

A

A

A

A

A

Pro jec t Li mits

ROAD WORK

END

WORK

ROAD

AHEAD

ROAD NAME

WORK

ROAD

AHEAD

ROAD WORK

END

WORK

ROAD

xxxxx

WORK

ROAD

xxxxxxx

ROAD WORK

NEXT xx MILES

WORK

ROAD

AHEAD

xx

MPH

ROAD NAME

ROAD WORK

END

WORK

ROAD

xxxxxxx

ROAD WORK

END

xx

MPH

WORK

ROAD

xxxxxxx

ROAD WORK

NEXT xx MILES

W20-1 over W16-8P See Note 8

W20-1

G20-2

W20-1 See Note 9

W20-1 See Note 9

W13-1P (optional)

G20-1 See Note 10

G20-2

W20-1 over W16-8P See Note 8

G20-2

G20-2

W20-1 See Note 9

W20-1 See Note 9

W13-1P (optional)

G20-1 See Note 10

Erect all project advance warning signs before starting construction work.

Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.

Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs to fit field conditions as approved. Vary messages as required.

Install advisory speed plaques under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.

Ensure all sign supports exposed to traffic are crashworthy.

Maintain two-way traffic during all non-work hours except as approved.

Do not store traffic control devices along the roadway when not in use.

Cover post-mounted signs when not applicable.

If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).

The message on the W20-1 signs may be ROAD WORK AHEAD or may specify the distance to the work area in feet or in miles. Install an additional W20-1 sign when approach speeds exceed 50 mph. When used, place the two W20-1 signs "B" feet apart according to the sign spacing table.

For work zones that are 2 miles or more in length, install G20-1 signs at each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.

If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.

State standards may be used as an alternative if approved.

Detail derives from Federal Highway Administration (FHWA) Standard 635-1.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

Road Nam e

SIGN SPACING TABLE

ROAD TYPE

DISTANCE BETWEEN

A B C

Expressway / Freeway Rural greater than 50 mph Urban and Rural 35 mph and 50 mph Urban and Rural 30 mph or less 100 100 100

350 350 500 500 1000 2640

NOT TO SCALE 6359

NOTE:LENGTH AND SPACING TABLE

APPROACH

SPEED* TAPER

AREA

BUFFER

SPACE

WORK

SPACE

CHANNELIZING DEVICE

* Approach speed based on the regulatory posted speed, not the advisory speed.

BUFFER

SPACE

LENGTH

Traffic flow

Traffic flow

1.

2.

3.

4.

5.

6.

7.

8.

9.

Signs are shown for one direction of travel only. Place signs similar to those depicted for the opposite direction of travel.

A single signal installation is acceptable, on the right-hand side of the road, if it has two signal faces that are at least 8 feet apart and meets the other requirements of the MUTCD.

Install and operate temporary traffic control signals in accordance with the requirements of the MUTCD. Establish signal timing using a qualified engineer. When the signal is changed to the flashing mode either manually or automatically, ensure red signal indications are flashed to both approaches.

Final location and spacing of devices may be changed to fit field conditions as approved. If signals are moved, determine revised signal timing using a qualified engineer.

For paved roadway surfaces, install stop lines complying with the MUTCD.

Remove existing conflicting pavement markings and raised markers between the work space and the stop line. Add no-passing lines in advance of the stop line that comply with the MUTCD. Removable pavement markings may be used for stop lines and no-passing pavement markings.

If closure is completely within the project limits, eliminate the ROAD WORK AHEAD (W20-1) and END ROAD WORK (G20-2) signs.

For project specific minimum width, refer to Special Contract Requirements.

Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.

Detail derives from Federal Highway Administration (FHWA) Standard 635-9.

G20-2 See Note 6

ROAD WORK

END

W3-3

R10-6

W20-1 See Note 6

W20-4

W13-1P (optional)

STOP

HERE ON

RED

xx

MPH

ONE LANE

ROAD

AHEAD

WORK

ROAD

AHEAD

W1-4R (optional)

R10-6

STOP

HERE ON

RED

G20-2 See Note 6

ROAD WORK

END

TERMINATION AREAVARIABLE

(See Length and Spacing Table)

ATAPER AREABUFFER SPACE

(optional)

WORK SPACE

(optional)

TAPER AREA BUFFER SPACEC B A

ADVANCE WARNING AREA (See Sign Spacing Table)

See Note 5 Device spacing (See Length and Spacing Table)

Type B warning light (optional)

STOP LINE

See Note 5

STOP LINE

See Note 5

Temporary traffic signal See Note 2

Temporary traffic signal See Note 2

Channelizing devices

SIGN SPACING TABLE

ROAD TYPE

DISTANCE BETWEEN

A B C

Expressway / Freeway Rural greater than 50 mph Urban and Rural 35 mph and 50 mph Urban and Rural 30 mph or less 100 100 100

350 350 500 500 1000 2640

20 40 20 50 20 60 20 70

NOT TO SCALE 6360

NOTE:LENGTH AND SPACING TABLE

APPROACH

SPEED* TAPER

AREA

BUFFER

SPACE

WORK

SPACE

CHANNELIZING DEVICEBUFFER

SPACE

LENGTH

WORK ZONE

CLEAR ZONE

WIDTH

CONCRETE

BARRIER

FLARE

RATE

1:8 1:8 1:8 1:9 1:10 1:12 1:14 1:16 1:16 1:16 1:16

1.

2.

3.

4.

5.

Install signs and other devices for single lane closure according to FHWA Standard 635-9. Final location and spacing of devices may be changed to fit field conditions as approved.

Place barrier according to the AASHTO Roadside Design Guide. Terminate barrier ends outside the work zone clear zone or protect the barrier ends with a crash cushion.

Include reflectors on barrier at 25 ft intervals.

For project specific minimum width, refer to Special Contract Requirements.

Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.

Detail derives from Federal Highway Administration (FHWA) Standard 635-13.

Device Spacing

TAPER AREA

(50' - 100')

BUFFER SPACE

(optional)

(See Length and Spacing Table) VARIABLE WORK SPACE

BUFFER SPACE

(optional) TAPER AREA (50' - 100')

Remove conflicting pavement markings

Channelizing devices

See Note 2 See Note 2

* Approach speed based on the regulatory posted speed, not the advisory speed.

Portable traffic barrier See Note 2

20 40 20 50 20 60 20 70

NOT TO SCALE 6361

Local tangent

STOP LINE

See Note 5

Bottom of edge panel < 10

Attach sign panels with a minimum of two 1/4" diameter bolts per post.

H1 and H2 = Overall post length.

Select post lengths to fit field conditions.

D = Post embedment depth for average soil conditions.

In areas where lateral distance is limited, a minimum lateral offset of 2 ft may be used. In areas with curbs, a minimum lateral distance of 1 ft behind the face of the curb may be used.

In pedestrian locations, or in areas with obstructed views, use 7 ft minimum mounting height for main sign and 6 ft minimum mounting height for secondary sign.

Use 7 ft minimum spacing between posts for sign posts 6" x 6" or larger.

State standards may be used as an alternative if approved.

Detail derives from Federal Highway Administration (FHWA) Standard 635-14.

NOTE:

90°

93°

WOOD POST SELECTION TABLE

X X

0.75X

H

H

X 0.2X 0.6X 0.2X

Y

D

H

D

H

D

H

Long side of post

D

SINGLE POST SIGN TWO POST SIGN

SIGN INSTALLATION ANGLE

POST DETAIL

Ed ge o f sh ou ld er

Ed ge o f tr av el ed w ay

4" 1'

-2

5' m in

1.

2"

.5 m in

1.8" [87.782] - 12'

5'-1" [97535.990]

WIDTH

"X"

AREA

NUMBER

OF POSTS

POST SIZE D HOLE SIZE

(SQFT)

Diamond ≤ 36" Other Shapes ≤ 48"

Diamond ≤ 48" Other Shapes ≤ 12'

(INCH) (INCH) (INCH)

Diamond ≤ 48" 10 - 20 10 - 20 20 - 50 50 - 65 50 - 65 65 - 95 65 - 95

> 13' 12' - 16'

> 17' > 30'

4 x 4 4 x 6 6 x 6 4 x 4 4 x 6 6 x 6 4 x 6 4 x 6 6 x 6

1.5

1.5

1.5 1.5

Bottom of edge panel

1.

2.

3.

4.

5.

6.

7.

8.

NOT TO SCALE 6362

* Approach speed based on the regulatory posted speed, not the advisory speed.

Device spacing (See Length and Spacing Table)

(optional)

BUFFER SPACE

W20-1 See Note 4

W20-4

W13-1P (optional)

W20-7

W16-2P

WORK SPACE

G20-2 See Note 4

Signs are shown for one direction of travel only. Place signs similar to those depicted for the opposite direction of travel.

Final location and spacing of devices may be changed to fit field conditions as approved.

For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at a conspicuous location on the rear of vehicle.

Prominently display the name of the Contractor on the pilot car.

If closure is completely within the project limits, eliminate the ROAD WORK AHEAD (W20-1) and END ROAD WORK (G20-2) signs.

For project specific minimum width, refer to the Special Contract Requirements, Section 34 20 00.

Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.

Detail derives from Federal Highway Administration (FHWA) Standard 635-6.

1.

2.

3.

4.

5.

6.

(optional)(optional)

Traffic flow

Traffic flow

Channelizing devices Flagger location

ADVANCE WARNING AREA (See Sign Spacing Table) (See Length and Spacing Table)

C B A TAPER AREA BUFFER SPACE VARIABLE BUFFER SPACE TAPER AREA A

WORK

ROAD

AHEAD

ONE LANE

ROAD

AHEAD

xx

MPH

xxx

FEET

Flagger location

TERMINATION AREA

ROAD WORK

END

NOTES:

SIGN SPACING TABLE

LENGTH AND SPACING TABLE

ROAD TYPE

DISTANCE BETWEEN

A B C

Expressway / Freeway

APPROACH

SPEED* TAPER

AREA

BUFFER

SPACE

WORK

SPACE

CHANNELIZING DEVICEBUFFER

SPACE

LENGTH

1000 1500 2640

Rural greater than 50 mph Urban and Rural 35 mph to 50 mph Urban and Rural 30 mph and less 100

NOT TO SCALE 6363

Sheets and Views
Cover Sheet-Layout1
G01 - Index of Sheets-Layout1
G02 - General Notes-Layout1
G03 - Bridge Preservation Area Overview-Layout1
G04 - 1570-009P Gibbon River Bridge #5 Area Map-Layout1
G05 - 1570-012P Old Faithful Interchange Area Map-Layout1
G06 - 1570-015P Firehole River Bridge #3 Area Map-Layout1
G07 - 1570-017P Bridge Bay Bridge Area Map-Layout1
G08 - 1570-060S Firehole River Bridge Midway Area Map-Layout1
E01 - 1570-015P Firehole River Bridge #3 Temp Erosion and Sediment Control Plan-Layout1
E02 - 1570-017P Bridge Bay Bridge Temp Erosion and Sediment Control Plan-Layout1
E03 - 1570-060S Firehole River Bridge Midway Geyser Basin Temp Erosion and Sediment Control Plan-Layout1
S01 - 1570-009P Gibbon River Bridge #5 Plan and Elevation-Layout1
S02 - 1570-009P Gibbon River Bridge #5 Section-Layout1
S03 - 1570-009P Gibbon River Bridge #5 Photo Sheet-Photo Sheet 1
S04 - 1570-012P Old Faithful Interchange Plan and Elevation-Layout1
S05 - 1570-012P Old Faithful Interchange Section-Layout1
S06 - 1570-012P Old Faithful Interchange Photo Sheet-Photo Sheet 1
S07 - 1570-015P Firehole River Bridge #3 Plan and Elevation-Layout1
S08 - 1570-015P Firehole River Bridge #3 Section-Layout1
S09 - 1570-015P Firehole River Bridge #3 Photo Sheet-Photo Sheet 1
S09 - 1570-015P Firehole River Bridge #3 Photo Sheet-Photo Sheet 2
S11 - 1570-017P Bridge Bay Bridge Plan and Elevation-Layout1
S12 - 1570-017P Bridge Bay Section-Layout1
S13 - 1570-017P Bridge Bay Bridge Photo Sheet-Photo Sheet 1
S13 - 1570-017P Bridge Bay Bridge Photo Sheet-Photo Sheet 2
S15 - 1570-060S Firehole River Bridge Midway Geyser Basin Plan and Elevation-Layout1
S16 - 1570-060S Firehole River Bridge Midway Geyser Basin Section-Layout1
S17 - 1570-060S Firehole River Bridge Midway Geyser Basin Photo Sheet-Photo Sheet 1
S17 - 1570-060S Firehole River Bridge Midway Geyser Basin Photo Sheet-Photo Sheet 2
T03.30A - Concrete Spall Repair Detail-Curb Repair
T03.30B - Seal Cracks Detail-Layout1
T03.30M - Install Concrete Curb Detail-Layout1
T03.30Q - Joint Clean and Reseal Detail-Layout1
T03.30S - Seal Steel Expansion Joint Detail-Layout1
T03.30U - Repair Deck Joints Detail-Layout1
T03.30V - Repair Bridge Deck Detail-Layout 1
T03.30W - Repair Bridge Deck Overhang Detail-Layout 1
T04.01F - Cleaning and Sealing Vertical Joints Detail-Layout1
REPAIR CONCRETE CURB AND GUTTER DETAIL
T04.01P - Repair Masonry Wall Detail-Layout1
T05.12S - Install Bearing Support Detail-Layout1
T05.52D - Reset Railing Sleeve Joint Detail-Layout1
T05.52G - Drill and Epoxy Bridge Rail Base Plate Anchors Detail-Layout1
T05.52K - Repair Conduit with Splice Detail-Layout1
T07.18H - Hydro-Demo and Overlay Detail-Layout1
T09.90A - Clean and Paint Railings and Steel Girders Detail-Layout1
T31.25B - Silt Fence Detail-Layout1
T31.25F - Sediment Control Log Details-Layout1
T31.25H - Erosion and Undermining Repair Detail-Curb Repair
T31.25V - Vehicle Tracking Control Details-Layout1
T31.32S - Scour Protection Detail-Layout 1
T32.12D - Asphalt Patching Pavement At Approach Detail-P14 - Patching Detail
PLOT
T32.31B - Roadway Adjustable Gate Detail-Layout1
T33.42H - Buried Pipe Rundown Detail-Layout1
T33.42J - Drop Inlet Detail-DROP INLET RUNDOWN DETAIL
T33.42K - Drop Inlet Grate Detail-DROP INLET GRATE DETAIL
T34.10B - Construction Traffic Control Sign Mounting Detail-Layout1
T34.20E - Temporary Traffic Control Advanced Signing Detail-Layout1
T34.20F - Temporary Traffic Control Single Lane Closure with Signals Detail-Layout1
T34.20G - Temporary Traffic Control Temporary Barrier Detail-Layout1
T34.20H - Temporary Traffic Control Sign Post Installation Detail-Layout1
T34.20S - Temprorary Traffic Control Single Lane Closure Layout (With Flaggers)-Layout1

File details come from the government source that posted it. Updated .