B08_ATT_8_Lim_on_SubK_Breakout_23Jul2024.xlsx

XLSX spreadsheet 94 KB Posted

Attached to
SPRNCA FENCE STAGE 2 Federal contract opportunity
Solicitation number
140L0625B0011
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This is a Limitations on Subcontracting Breakout Excel template for Solicitation Number 140L0625B0011, issued by the Department of the Interior Bureau of Land Management National Office for the SPRNCA FENCE STAGE 2 project. The document is a small business set-aside contract requiring 25% self-performance, with a structured template to track labor and material costs from small business and large business subcontractors. The template provides columns for total amount proposed, material costs, self-performed labor, small business subcontractor labor, large business subcontractor labor, and a calculation for compliance with subcontracting limitations. The spreadsheet includes notes specifying that subcontractors must be first-tier and qualify under the solicitation's NAICS code, with second-tier subcontractors counted as large business labor.

View the file

Other files for this federal contract opportunity

Other files attached to SPRNCA FENCE STAGE 2, newest first.
File Type Posted
Att_9_Questions_and_Answers_0001.pdf PDF
Att_10_Site_Visit_0001.pdf PDF
Sol_140L0625B0011_Amd_0001.pdf PDF
Att_11_Continuation_Pages_Rev__8-1-2025_0001.pdf PDF
B08_SPRNCA_Boundary_Fence_Round_2_SOW_and_Spec_6_6_2025.pdf PDF
B08_ATT_7_Wage_Determination_06_20_2025.pdf PDF
B08_ATT_5_Phase_2B_Detail.zip ZIP file
B08_ATT_2_Phase_1B_Alt_Route.zip ZIP file
B08_ATT_4_Phase_1D_Detail.zip ZIP file
B08_ATT_6_Phase_3A_Detail.zip ZIP file
B08_ATT_3_Phase_1C_Detail.zip ZIP file
Sol_140L0625B0011.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)

Solicitation Number140L0625B0011
Type of Set-AsideSmall Business
Performance Period
Required Self-Performance25%

(A) Total Amount Proposed¹

(B) Total Material Cost2

(C) Self Performed Labor

(D) Small Business Subcontractor (SSS) Labor3
Total Amount Paid to [Insert First SSS Name]
Total Amount Paid to [Insert Second SSS Name]
Total Amount Paid to [Insert Third SSS Name]
Total Amount Paid to [Insert Fourth SSS Name]
Total Amount Paid to [Insert Fifth SSS Name]
Total Amount Paid to [Insert Sixth SSS Name]
Total Amount Paid to SSS Companies$0.00
(E) Large Business Subcontractor (LBS) Labor
Total Amount Paid to [Insert First LBS Name]
Total Amount Paid to [Insert Second LBS Name]
Total Amount Paid to [Insert Third LBS Name]
Total Amount Paid to [Insert Fourth LBS Name]
Total Amount Paid to [Insert Fifth LBS Name]
Total Amount Paid to [Insert Sixth LBS Name]
Total Amount Paid to LBS Companies$0.00

(F) Total Labor Cost4 $0.00

(G) Limitation on Subcontracting Percentage5
(Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor CostERROR:#DIV/0!
*Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost
*Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1.
*Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor.
*Note 4: Total labor costs consist of all contractual costs other than material.
*Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage.

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .