B08_Att_4_Price_Schedule__B47_58_Replace_HVAC_Systems_GATE.pdf

PDF 91 KB Posted

Attached to
GATE-REPLACE HVAC SYS AT BLDG 47&58-SAHO Federal contract opportunity
Solicitation number
140P4526R0030
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This is a Contract Bid Schedule template for HVAC system replacement at two buildings (Building 47 and Building 58) located at Gateway National Recreation Area's Sandy Hook Unit.

Bidders must submit pricing for all line items to avoid rendering their bid non-responsive. The bid structure is organized into three cost categories: Direct Labor Hours (including Supervisor, HVAC Technician(s), and Electrician(s) with hourly rate calculations), Equipment/Services (equipment for HVAC replacement and startup/testing services), and Material/Supplies (material for cooling replacement and material for heating replacement). Bidders may add additional itemized line items in appropriate sections if needed. The template requires calculation of subtotals for each category, with a final Total Base Bid amount to be entered. The document permits flexibility for bidders to customize labor categories and add items not pre-listed on the schedule.

View the file

Other files for this federal contract opportunity

Other files attached to GATE-REPLACE HVAC SYS AT BLDG 47&58-SAHO, newest first.
File Type Posted
Sol_140P4526R0030_Amd_0002.pdf PDF
Sol_140P4526R0030_Amd_0001.pdf PDF
Sol_140P4526R0030.pdf PDF
B08_Att_2_Drawings_B47_58_Replace_HVAC_Systems_GATE.pdf PDF
B08_Att_3_WD_B47_58_Replace_HVAC_Systems_GATE.pdf PDF
B08_Att_1_SOW_B47_58_Replace_HVAC_Systems_GATE.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT BID SCHEDULE

Replace HVAC Systems at Building 47 & Building 58 Gateway National Recreation Area - Sandy Hook Unit

Submit bid for all items: Failure to do so may render the bid non-responsive. If there is an item that is not below that you would like to itemize out, please insert it in the appropriate area and calculate it in the totals.

Direct Labor Hours:

Supervisor _______Total Hours x $_______/hr = $____________

HVAC Tech(s) _______Total Hours x $_______/hr = $____________

Electrician(s) _______Total Hours x $_______/hr = $____________

Direct Labor Hours: $ ________________TOTAL Equipment / Services:

Equipment for HVAC Replacement = $____________

Services for startup/testing = $____________

Equipment / Services: $ _______________ TOTAL

MATERIAL/SUPPLIES:

Material for Cooling Replacement = $____________

Material for Heating Replacement = $____________

Material/Supplies: $ _______________ TOTAL

TOTAL BASE BID = $______________________________