B08_Att_4_Price_Schedule__B47_58_Replace_HVAC_Systems_GATE.pdf
PDF 91 KB Posted
- Attached to
- GATE-REPLACE HVAC SYS AT BLDG 47&58-SAHO Federal contract opportunity
- Solicitation number
- 140P4526R0030
About this file
This is a Contract Bid Schedule template for HVAC system replacement at two buildings (Building 47 and Building 58) located at Gateway National Recreation Area's Sandy Hook Unit.
Bidders must submit pricing for all line items to avoid rendering their bid non-responsive. The bid structure is organized into three cost categories: Direct Labor Hours (including Supervisor, HVAC Technician(s), and Electrician(s) with hourly rate calculations), Equipment/Services (equipment for HVAC replacement and startup/testing services), and Material/Supplies (material for cooling replacement and material for heating replacement). Bidders may add additional itemized line items in appropriate sections if needed. The template requires calculation of subtotals for each category, with a final Total Base Bid amount to be entered. The document permits flexibility for bidders to customize labor categories and add items not pre-listed on the schedule.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4526R0030_Amd_0002.pdf | ||
| Sol_140P4526R0030_Amd_0001.pdf | ||
| Sol_140P4526R0030.pdf | ||
| B08_Att_2_Drawings_B47_58_Replace_HVAC_Systems_GATE.pdf | ||
| B08_Att_3_WD_B47_58_Replace_HVAC_Systems_GATE.pdf | ||
| B08_Att_1_SOW_B47_58_Replace_HVAC_Systems_GATE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT BID SCHEDULE
Replace HVAC Systems at Building 47 & Building 58 Gateway National Recreation Area - Sandy Hook Unit
Submit bid for all items: Failure to do so may render the bid non-responsive. If there is an item that is not below that you would like to itemize out, please insert it in the appropriate area and calculate it in the totals.
Direct Labor Hours:
Supervisor _______Total Hours x $_______/hr = $____________
HVAC Tech(s) _______Total Hours x $_______/hr = $____________
Electrician(s) _______Total Hours x $_______/hr = $____________
Direct Labor Hours: $ ________________TOTAL Equipment / Services:
Equipment for HVAC Replacement = $____________
Services for startup/testing = $____________
Equipment / Services: $ _______________ TOTAL
MATERIAL/SUPPLIES:
Material for Cooling Replacement = $____________
Material for Heating Replacement = $____________
Material/Supplies: $ _______________ TOTAL
TOTAL BASE BID = $______________________________
File details come from the government source that posted it. Updated .