B08_Att_2_Drawings_B47_58_Replace_HVAC_Systems_GATE.pdf

PDF 2 MB Posted

Attached to
GATE-REPLACE HVAC SYS AT BLDG 47&58-SAHO
Solicitation number
140P4526R0030
Issued by

About this file

This document is a photographic reference file for a federal construction project at Gateway National Recreation Area's Sandy Hook Unit operated by the National Park Service Northeast Region. The project involves replacing HVAC systems at Building 47 and Building 58, dated March 2026.

The photographs provide visual documentation of existing HVAC equipment to be replaced. Building 47 contains two Goodman condenser units positioned on the north side of the structure, aged air handlers located in the attic, and hot water boilers in the basement showing deteriorated conditions. Building 58 has York condenser units installed under the building's porch and additional aged air handlers in the attic space. The images indicate that the existing equipment is outdated and requires replacement to restore functional climate control systems. This photographic documentation serves as site condition reference material for contractors preparing bids or developing replacement specifications for the HVAC modernization project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gateway National Recreation Area Sandy Hook Unit

PHOTOS

Replace HVAC Systems at Building 47 & Building 58

DATED:

March 2026

NATIONAL PARK SERVICE

NORTHEAST REGION

Goodman Condenser Units on North side of Building 47

Air handlers in attic of Building 47

Hot water Boiler in Basement of Building 47

York Condenser Units under porch of Building 58

Air handlers in attic of Building 58

File details come from the government source that posted it. Updated .