B08_ATT_4_Price_Breakout.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
GAOA SFK DRY BLOOD DAM RECONSTRUCTION
Solicitation number
140L0622R0038
Issued by

About this file

This document contains a price schedule and description for a federal construction contract opportunity for South Fork Dry Blood Dam Reconstruction being solicited by the Bureau of Land Management. The contract requires dewatering the reservoir and construction area, excavating portions of the existing dam embankment and foundation to remove the primary spillway, reconstructing the dam embankment which includes placement of compacted fill and erosion protection, construction of a new precast concrete spillway riser and outlet conduit, construction of precast concrete inlet and stilling basin structures, road gravel surfacing, a temporary construction access road, auxiliary spillway improvements, fencing and cattle guard installation, and reclamation of disturbed areas. The price schedule includes estimated quantities and unit pricing for various tasks such as mobilization, excavation, embankment work, concrete structures, road surfacing and fencing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dry Blood Price Sched

SOUTH FORK DRY BLOOD DAM RECONSTRUCTION
Price Schedule
140L0622R0038
Item No.DescriptionQuantity*0Unit PriceTotal Cost
1Mobilization and Preparatory Work1LS
2Clearing, Topsoil Stripping & Replacement1LS
3Principal Spillway Demolition1LS
4Common Excavation38,270CY
5Muck Excavation4,130CY
6Compacted Embankment28,960CY
7Filter Sand472CY
8Drain Gravel67CY
9Road Gravel440Ton
10Temporary Construction Access1LS
11Remove and Replace Fencing1LS
12Spillway Tower and Inlet Structure1LS
13Outlet Conduit1LS
14Stabilization Fabric1,000SY
15Impact Stilling Basin1LS
16Slope Protection1LS
17Water Control/Dewatering1LS
18Lime Amended Backfill2,070CY
TOTAL PRICE
*Quantities are estimates. Measurement and payment for each item is defined in Section 01150, Measurement and Payment.

SUGGESTED LANGUAGE: *Quantities are not guaranteed. Measurement and payment for each Price Item is defined in Section 01150, Measurement and Payment. All measured items are estimated and subject to contract clauses 52.211-18, Variation in Estimated Quantity and 52.236-16, Alt. 1 Quantity Suveys.

Pricing offered must include all materials, equipment, supplies, appurtenances; all construction plant, equipment, and tools; all labor and supervision, profit and overhead necessary to fully complete the work. Bonds and insurance costs shall be included in the mobilization line item.

&"Arial,Regular"&8&Z&F &"Arial,Regular"&9BID SCHEDULE&"MS Sans Serif,Regular"&8