B08_-_ATT_3_-_MAP_SMR_Rd_122_C_D_E_F_Road_Base_Project.pdf

PDF 18 MB Posted

Attached to
FL-ST. MARKS NWR-ROAD MATERIAL
Solicitation number
140F0S26Q0058
Issued by

About this file

This document is a project location map for the SMR Road 122 C, D, E, F Road Base Project. The map illustrates two phases of road construction work spanning a designated geographic area. Phase One, designated as Road 122 C/D (shown in red), is scheduled to begin on September 1, 2025. Phase Two, designated as Road 122 E/F (shown in cyan), is scheduled to commence on October 6, 2025. The map provides a geographic overview of the project scope, showing the road corridors in relation to nearby highways including US Highway 98 and State Road 30, along with surrounding land parcels outlined in green. The project area covers approximately 2 miles and is presented with satellite imagery from Google Earth and Airbus for geographic reference and context.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SMR Rd 122 C,D,E,F Red is Rd 122 C/D Road Base Project Phase one 9/1/25

Cyan is Rd 122 E/F Road Base Project Phase two 10/6/2025

Legend

RD 122 C/D

SMR Rd 122 E/F

2 mi

N

N © 2025 Google

© 2025 Google

© 2025 Google

Image © 2025 Airbus

Image © 2025 Airbus

Image © 2025 Airbus