This document is a Contract Price Schedule for the Renovation of Kirby Cove Vault Toilets project at Golden Gate National Recreation Area. The solicitation number is PARK - PMIS: GOGA 310443.
The price schedule includes a single base line item for the Kirby Cove Campground Vault Toilet renovation with a lump sum price of $21,703. No option line items are included. The document specifies that all measurement and quantity information is contained in Division 01 Specifications Section 01 11 00 Summary of Work. The document also includes sample price schedules for Design-Bid-Build and Design-Build contract types, but these are for illustrative purposes and do not contain any details specific to the Kirby Cove project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Att_5_140P8624Q0056_GenRefs.docx | DOCX document | |
| B08_Att_2_IMG_0805.jpg | JPG image | |
| B08_Att_2_Map_of_Location.JPG | JPG image | |
| Sol_140P8624Q0056.pdf | ||
| B08_Att_6_DI_137_Release_of_Claims_.pdf | ||
| B08_Att_2_IMG_0804.jpg | JPG image | |
| B08_Att_1_Construction_Specifications_-_Kirby_Cove_Vaults_8_12_24.docx | DOCX document | |
| B03_Att_4_WD_CA20240018_7_4_24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule | |
| National Park Service | |
| Solicitation Number: | |
| PARK - PMIS: | GOGA 310443 |
| Developed Area: | Golden Gate National Recreation Area | ||||
| Project Title: | Rennovation of Kirby Cove Vault Toilets | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Unit of Measure | Unit Price | Total Price | |
| 1 | Kirby Cove Campground Vault Toilets | lump sum | N/A | ||
| TOTAL BASE PRICE (Contract Line Item Number 1) ------------------------------------------------------------------------ | |||||
| All measurement and quantity information is included in Division 01 Specifications Section 01 11 00 Summary of Work. |
Filled In
| Contract Price Schedule | |
| National Park Service | |
| Solicitation Number: | |
| PARK - PMIS: | GOGA 310443 |
| Developed Area: | Golden Gate National Recreation Area | ||||
| Project Title: | Rennovation of Kirby Cove Vault Toilets | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Unit of Measure | Unit Price | Total Price | |
| 1 | Kirby Cove Campground Vault Toilet | lump sum | $21,703 | $21,703 | |
| TOTAL BASE PRICE (Contract Line Item Number 1) ------------------------------------------------------------------------ | $21,703 | ||||
| All measurement and quantity information is included in Division 01 Specifications Section 01 11 00 Summary of Work. |
Design-Bid-Build (DBB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Old Faithful | ||||
| Project Title: | Johnstonian Visitors Center | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Visitors Center | 1 | Lump Sum | $0.00 | |
| 2 | Water Line | 400 | Lineal Feet | - 0 | |
| 3 | Sanitary Sewer Line | 200 | Lineal Feet | - 0 | |
| 4 | Rock Excavation | 150 | Cubic Yards | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | $0.00 | ||||
| 5 | OPTION A, Geothermal Wells | 1 | Lump Sum | - 0 | |
| 6 | OPTION B, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) ------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Build (DB) Sample
| Contract Price Schedule - Design-Build (DB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Yosemite Valley | ||||
| Project Title: | Design and Build a New Structure | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Design | 1 | Lump Sum | $0.00 | |
| 2 | Construction | 1 | Lump Sum | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 and 2) --------------------------------------------------------------------------------------- | $0.00 | ||||
| 3 | OPTION A, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ---------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |