B08_Att_15_Limitations_on_Subcontracting_Report.xlsx

XLSX spreadsheet 93 KB Posted

Attached to
COLO 200920, Jones Mill Pond Dam and Colonial Park
Solicitation number
140P2024R0072
Issued by

About this file

This document is a template for a Limitations on Subcontracting Report required for small business, 8(a) or other socio-economic set-aside service contracts (including construction) priced at or above $150,000. The report provides details on the prime contractor, contract number, set-aside type, period of performance, and the allowable percentage of subcontracting to non-similarly situated subcontractors (NSS) for different types of service contracts. It requires the prime contractor to report the amount invoiced by the prime and the portion invoiced by similarly situated subcontractors (SSS) and NSS, as well as the overall participation percentages. If the NSS percentage exceeds the allowable limit, the prime contractor must provide a written corrective action plan.

This report is related to the federal contract opportunity for COLO 200920, Jones Mill Pond Dam and Colonial Parkway Repairs and Improvements, solicited by the Department of the Interior National Park Service National Office. The solicitation number is 140P2024R0072.

View the file

Other files

File Type Posted
B09_Att_26_Specifications_(rev)_9-5-24_0003.pdf PDF
B09_Att_27_RFIs_9-6-24_0003.pdf PDF
Sol_140P2024R0072_Amd_0003.pdf PDF
B09_Att_24_Site_Visit_Sign-in_List_0002.JPG JPG image
B09_Att_25_COLO_200920_Solicitation_(rev)_0002.pdf PDF
B09_Att_22_Exhibit_C_Misc_Reports_and_Figures_0002.pdf PDF
B09_Att_18_York_County_Exemption_Letter_CB_24-009_0002.pdf PDF
Sol_140P2024R0072_Amd_0002.pdf PDF
B09_Att_20_Wage_Determination_VA20240204_6-21-24_0002.pdf PDF
B09_Att_23_Exhibit_D_NPS_Clean_Fill_Protocol_0002.pdf PDF
B09_Att_16_RFIs_8-30-24_0002.pdf PDF
B09_Att_21_Exhibit_B_Previous_Reports_0002.pdf PDF
B09_Att_17_Title_I_Dam_Assessment_Report_0002.pdf PDF
B09_Att_19_Tree_Removal_Map_0002.pdf PDF
Sol_140P2024R0072_Amd_0001.pdf PDF
B08_Att_5_Dept_Army_Exemption_Ltr.pdf PDF
B08_Att_3_Exemption_Letter_VDEQ_1-19-24.pdf PDF
B08_Att_13_Past_Performance_Questionnaire.docx DOCX document
B08_Att_7_Application_Water_Quality_Impact_Assmt_Appr.pdf PDF
B08_Att_9_Supplemental_Design_Reports.pdf PDF
B08_Att_1_Specifications_Div_1-35.pdf PDF
B08_Att_11_Contract_Price_Schedule.xlsx XLSX spreadsheet
Sol_140P2024R0072.pdf PDF
B08_Att_10_Wage_Determination_VA20240001.pdf PDF
B08_Att_8_Final_Design_Calculations.pdf PDF
B08_Att_4_York_County_Wetlands_Application.pdf PDF
B08_Att_6_Preliminary_Jones_Mill_Pond_Dam_Exhibit.pdf PDF
B08_Att_12_Project_Experience_Questionnaire.docx DOCX document
B08_Att_2_Drawings.pdf PDF
B08_Att_14_Banking_Information_Questionnaire.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template for Contracts and Indi Limitations on Subcontracting Report

This report is required for small business, 8(a) or other socio-economic set-aside service contracts (including construction) priced at or above $150,000.

Contract Number:[Insert contract #]
Prime Contractor:[Insert prime contractor's company name]
Current Total Contract Price:[Insert the amount of the original contract + all excuted contract modifications]
Type of Set Aside:[Insert type of set-aside: Small Business, HUBZone, SDVOSB, WOSB, 8(a), etc.]
Period of PerformanceMM/DD/YYYY - MM/DD/YY
Type of Service (Required Participation):[Put an X in the applicable box below per clause 52.219-3, 14, 27,29,30]
1) Services (except construction). 50% maximum may be subcontracted to non-similary situated Subcontractors
2) General construction. 85% maximum may be subcontracted to non-similary situated Subcontractors
3) Construction by special trade contractors. 75% maximum may be subcontracted to non-similary situated Subcontractors
Participartion Calculation as of the Current Invoice
Amounts shown below shall include amounts from all previous invoices and the current invoice. Exclude the cost of materials.
1) Amount Invoiced by the Prime Contractor:$0
2) Portion of Amount Invoiced for All Similarly Situated Subcontractors (SSS)*$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0Add additional rows if more than 5 SSS
3) Portion of Amount Invoiced for Non-Similarly Situated Subcontractors (NSS)$0
Total Amount Paid To:[Insert NSS company name]$0
Total Amount Paid To:[Insert NSS company name]$0
Total Amount Paid To:[Insert NSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0
Total Amount Paid To:[Insert SSS company name]$0Add additional rows if more than 5 NSS
4) Prime & SSS Participation %ERROR:#DIV/0!Modify formula if additional rows added above
5) % subcontracted to NSSERROR:#DIV/0!Modify formula if additional rows added above
* Similarly Situated Subcontractor (SSS): is a small business subcontractor that is a participant of the same Small Business Administration (SBA) program that qualified the prime contractor as an eligible offeror and awardee of the contract as defined in 13 CFR 125.6 (i.e. Small Business, HUBZone Business, Service Disabled Veteran Owned Small Business (SDOVB), etc.)
** Limitation on Subcontracting Percentage = (Total amount invoiced by the Prime Contractor - Portion of total amount invoiced for Non-Similarly Situated Subcontractors (NSS)/ Total amount invoiced by the Prime Contractor)
Corrective Action Plan
If the NSS % noted in line 5 above is not in compliance with the % required by contract clause 52.219-3, 14, 27,29,30 then the prime contractor shall provide a written corrective action plan below:

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .