This document contains Requests for Information (RFIs) related to Solicitation 140P2024R0072 for the COLO 200920, Jones Mill Pond Dam and Colonial Parkway Repairs and Improvements project. The RFIs cover clarification on the use of Shoreblock and geotextile materials referenced in the written specifications and supporting documents. The original questions and corrected answers provided indicate that references to Shoreblock and needle punched geotextile should be deleted or revised in the specifications. The federal contract opportunity is being solicited by the Department of the Interior National Park Service National Office for repairs and improvements to the Jones Mill Pond Dam and Colonial Parkway.

View the file

Other files

File Type Posted
B09_Att_26_Specifications_(rev)_9-5-24_0003.pdf PDF
Sol_140P2024R0072_Amd_0003.pdf PDF
B09_Att_24_Site_Visit_Sign-in_List_0002.JPG JPG image
B09_Att_25_COLO_200920_Solicitation_(rev)_0002.pdf PDF
B09_Att_22_Exhibit_C_Misc_Reports_and_Figures_0002.pdf PDF
B09_Att_18_York_County_Exemption_Letter_CB_24-009_0002.pdf PDF
Sol_140P2024R0072_Amd_0002.pdf PDF
B09_Att_20_Wage_Determination_VA20240204_6-21-24_0002.pdf PDF
B09_Att_23_Exhibit_D_NPS_Clean_Fill_Protocol_0002.pdf PDF
B09_Att_16_RFIs_8-30-24_0002.pdf PDF
B09_Att_21_Exhibit_B_Previous_Reports_0002.pdf PDF
B09_Att_17_Title_I_Dam_Assessment_Report_0002.pdf PDF
B09_Att_19_Tree_Removal_Map_0002.pdf PDF
Sol_140P2024R0072_Amd_0001.pdf PDF
B08_Att_5_Dept_Army_Exemption_Ltr.pdf PDF
B08_Att_3_Exemption_Letter_VDEQ_1-19-24.pdf PDF
B08_Att_13_Past_Performance_Questionnaire.docx DOCX document
B08_Att_7_Application_Water_Quality_Impact_Assmt_Appr.pdf PDF
B08_Att_9_Supplemental_Design_Reports.pdf PDF
B08_Att_1_Specifications_Div_1-35.pdf PDF
B08_Att_15_Limitations_on_Subcontracting_Report.xlsx XLSX spreadsheet
B08_Att_11_Contract_Price_Schedule.xlsx XLSX spreadsheet
Sol_140P2024R0072.pdf PDF
B08_Att_10_Wage_Determination_VA20240001.pdf PDF
B08_Att_8_Final_Design_Calculations.pdf PDF
B08_Att_4_York_County_Wetlands_Application.pdf PDF
B08_Att_6_Preliminary_Jones_Mill_Pond_Dam_Exhibit.pdf PDF
B08_Att_12_Project_Experience_Questionnaire.docx DOCX document
B08_Att_2_Drawings.pdf PDF
B08_Att_14_Banking_Information_Questionnaire.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFIs

COLO 200920 Jones Mill Pond Dam

Solicitation 140P2024R0072

9-6-2024

1. Original Question Att 16 RFIs: Several places in the written specifications and supporting documents call out The Shoreblock SD 600 OCT for the main embankment and Shoreblock

SD 475 OCT for the outlet swale.

Corrected Answer: Shoreblock is not referenced, only salient characteristics.

2. Original Question Att 16 RFIs: In several places within the contract documents the geotextile is called out as a woven needle punched fabric. Do you mean non-woven needle punched fabric?

Corrected Answer: References to needle punched should be deleted from locations calling for woven geotextile. The relevant section is 31 35 23 and has been revised in the

Specifications.