This document appears to be a set of drawings related to a federal contract opportunity for the USGS Hydrologic Instrumentation Facility (HIF) in Tuscaloosa, AL. The drawings provide detailed layouts and specifications for a sensor innovation lab, dirty shop, paint booth, welding area, and related equipment and utilities.
The associated federal contract opportunity, Solicitation Number 140G0124Q0289, is for the delivery and installation of transformers and related services at the HIF facility, to be awarded as a small business set-aside contract. The RFQ will be issued on or about 8/30/2024, with quotes due by 09/05/2024. The anticipated award date is 09/15/2024. The NAICS code is 335311, with a size standard of 800 employees. Interested vendors must be registered in SAM.gov to be considered for the contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140G0124Q0289_Amd_0001.pdf | ||
| B08_ATCH_1_SOW.pdf | ||
| Sol_140G0124Q0289.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
13 14 15 16
B
D
E
LS
-1
S 34"
H/C
22 3
QC004
QC004
QC003
QC003
PT
D
-A
B.5
QL4531
QL453 3
FM
FM025
FM
FM
PR2
PT
D
-A
FM006
FM011
FM
FM
FM023
PT
D
-A PR2
SENSOR
INNOVATION
PAINT BOOTH
OFFICE
QA HOLDING
WELDING
AREA
QL503 5
QL503
4'
WE NEED TO DOCUMENT
THIS PAINT BOOTH - MFR
SHOULD PROVIDE EXH FAN,
CONTROLLER, AND THE
MAKE-UP AIR UNIT...
*** UPDATE IN SPECS ***
need a keyed note; need equipment spec for it
FM024
8'
2'
1"
12 22
FM018
FM019
FM022
HAAS
ST-25
CNCHAAS
VF3
CNC
LARGE
SURFACE
TABLE
FM002
FM010
FM004
FM005
FM
FM012
GORTON
HORZ
/VERT
MILL
VERT
BAND
SAW
MEDIUM
LATHE
LARGE
LATHE
HYD
PRESS
DRILL
PRESS
FM027
ARBOR
PRESS
SHAVINGS BINS
DUCTED EXHAUST
CONNECTIONS
PLAN DUCTED EXHAUST
LT
-0
LT
-0
LT
-0
LT
-0
LT
-0
LT-04
QL45311 QL453 11
QL453 11
QL453 11
QL453
CORD REEL 120VCORD REEL 120VCORD REEL 120V
CORD REEL 120V
CORD REEL120V
EQUIP POWER
FROM OVERHEAD
208V 3PH 20A
EQUIP POWER
FROM OVERHEAD
120V 3AMP
220V 3PH 2.5HP
208V 3PH 20A
440V 3PH
440V 3PH
NOT ALL KEYED NOTES ARE USED.
1. TEACHING WALL, SEE ARCH AND AV.
2. MARINE EDGE.
3. STAINLESS STEEL CASEWORK - 316L GRADE.
4. COUNTERTOP GROMMET.
5. EXHAUST CONNECTION AT CORROSIVES CABINET, SEE MECH.
6. MAINTENANCE/SERVICE ACCESS HATCH THROUGH CEILING
PANEL, BY CER MFR.
7. GLASS MARKER BOARDS ON STAND-OFF MOUNTS. SEE ARCH.
8. FLOOR DRAIN FOR CER CONDENSATE, SEE PLUMB.
9. WALL MOUNTED CONTROL PANEL FOR CER.
10. ELEC & DATA CONNECTIONS IN FLOOR, SEE ELEC.
11. SERVICE FITTINGS MUST BE WITHIN ACCESSIBLE REACH, 24" MAX.
12. EQUIPMENT FURNISHED AND INSTALLED BY CONTRACTOR (CFCI).
13. PROVIDE STAINLESS STEEL SIDE SPLASH / UMBILICAL CURB END CAP AT
UM-A LOCATIONS. FINISH TO MATCH COUNTERTOPS, SEE 1 / QL504
14. CHARGING STATION(S) FOR LIFTS, SEE ELEC.
15. SEAL JOINT BETWEEN DISSIMILAR COUNTERTOP MATERIALS
16. ALIGN, SEE DASHED LINES AND DIMENSION REFERENCES.
17. COUNTERTOP WITH "WATERFALL" EDGE, SEE DETAIL 10/QL501
18. CENTER
19. CASEWORK MFR / VENDOR TO REVIEW DESIGN FOR LOAD
CAPACITY. CONFIRM DESIGN WILL SUPPORT OFOI WATER TANK
WEIGHING UP TO 2,500 LBS PLACED ON COUNTERTOP. NOTIFY
ARCHITECT IF DESIGN CHANGE IS REQUIRED.
20. CARRIAGE / WORK PLATFORM WITH GUARD RAILS. TRACKS / RAILS
MOUNTED TO TANK SIDEWALLS. SHOWN FOR REFERENCE ONLY,
SELECTED VENDOR TO DETAIL SPECIFIC REQUIREMENTS.
21. STAINLESS STEEL SINK WITH PRE-RINSE FAUCET, SEE PLUMB.
22. PAINT BOOTH WITH APPROX. 6'W X 6'D X 8'H CHAMBER. SELECTED MODEL
MUST BE DESIGNED FOR INSTALL WITHOUT SIDE OR REAR CLEARANCES
AS SHOWN. SELECTION TO BE COORDINATED WITH MAKE UP AIR SYSTEM
AND CONTROLS, SEE MECH AND ELEC. SEE SPECIFIC NOTES ON M101B
AND M703.
SHOWN
LABORATORY FURNISHINGS AND EQUIP KEYED NOTES
NO. REVISIONS DSGN CHKD APVD DATE
DESIGNED
DRAWN
CHECKED
APPROVED
APPROVED
DATE
SCALE:
NO. REV.
A
B
C
D
E
F
G
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10 11
1 2 3 4 5 6 7 8 9 10 11
STANLEY CONSULTANTSC
C
AD
D D
3- R
225 Iowa Avenue, Muscatine, Iowa 52761-3764 www.stanleyconsultants.com
AT FULL SIZE
1 2 3 IN
1 2 3 4 5 6 7 8 cm
FINAL CONSTRUCTION DOCUMENTS
PROPERTY OF THE UNITED STATES GOVERNMENT
COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS,
PLANS, OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED.
Do not remove this notice. Properly destroy documents when no longer needed.
1/4" = 1'-0"
USGS
HYDROLOGIC INSTRUMENTATION FACILITY (HIF)
TUSCALOOSA, AL
Project Number
QL404
JHL
RBU
MPW
3/29/2023
USGS
HYDROLOGIC INSTRUMENTATION FACILITY (HIF)
TUSCALOOSA, AL
ENLARGED PLAN - SENSOR
INNOVATION LAB
1/4" = 1'-0"1 ENLARGED PLAN - DIRTY SHOP, PAINT BOOTH / HAZ MAT, & WELDING
0 ISSUED FOR CONSTRUCTION (IFC)
3 ITC 0020
FEB 07, 2022
MAR 29, 2023
fshenry Rectangle fshenry Rectangle fshenry Typewritten Text Vertical Mill fshenry Typewritten Text Lathe