B08 Asphalt Requirement Specifications.docx

DOCX document 21 KB Posted

Attached to
GRTE ASPHALT SUPPLY FY21 Federal contract opportunity
Solicitation number
140P1421Q0021
Issued by
Department of the Interior National Park Service Intermountain Region

About this file

This document outlines requirements for a supply contract to provide 2900 tons of hot mix asphalt to Grand Teton National Park. The asphalt will be used for repaving projects within the park boundaries between June 6, 2020 and September 30, 2020. The contractor will produce and supply the asphalt within 25 miles of the park, load it onto trucks provided by the National Park Service or contract haulers for transportation to work sites, and provide weight tickets for invoicing. Offer submissions are due by February 26, 2020. The asphalt product specified is a 58-28 mix with 30% reclaimed asphalt pavement and 5.10% asphalt cement content. The contractor must submit test samples at least two weeks prior to delivery for evaluation and acceptance. Pricing will be based on actual quantities ordered and picked up according to FAR provisions for variation in quantity.

View the file

Other files for this federal contract opportunity

Other files attached to GRTE ASPHALT SUPPLY FY21, newest first.
File Type Posted
Sol_140P1421Q0021.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hot Asphalt Mix Grand Teton National Park

RFQ #140P1421Q0021

REQUIREMENT

Grand Teton National Park needs to purchase 2900 tons of Hot Mix Asphalt for the 2021 construction season.

The period of performance will start approximately June 6, 2020 and end September 30, 2020.

Offers are currently due on Friday, February 26, 2020 at 1PM MT. The government’s preference for offer submissions is via email with electronic documents. Submit electronic offers to luis_cibrian@nps.gov.

For question or information regarding the solicitation, please contact Luis A Cibrian at luis_cibrian@nps.gov or 406-581-0403.

Salient Characteristics:

Hot Mix Asphalt Supply (½” 58-28 30% RAP 5.10 AC or similar AIMMS-2)

Specifications:

This is a supply requirement for Hot Mix Asphalt Supply (½” 58-28 30% RAP 5.10 AC or similar AIMMS-2) to be used in Grand Teton National Park during the summer of 2021 for repaving within the park boundaries.

The Contractor shall provide all equipment, operating supplies, operators, supervision, and support functions necessary in order to furnish the Hot Mix Asphalt to the Government. NPS trucks and personnel and/or contract trucks will complete the pickup and transportation to the site. The Contractor will load trucks.

Vendor is to produce hot asphalt to Grand Teton National Park within 25 miles of the Park’s boundary. The distance limitation is necessary to assure that the asphalt reaches the job site while maintaining a minimum working temperature of 250 degrees. This is necessary so that the material stays pliable and can flow through the paving machine.

Period of Performance:

The period of performance is from June 7, 2020 through September 30, 2020.

Scheduling:

The Hot Mix Asphalt shall be readily available for pick-up during the period of performance, between 06/07/2020 through 09/30/2020, Monday through Friday, from 7:00am to 5:30 pm: approximate quantities will range between 6 yards and 300 yards per scheduled pick-up. Park point of contact identified at contract award will contact Contractor three weeks in advance to confirm schedule.

Note: The pick-up quantity variation is due in part to uncertainty in weather conditions and availability of equipment (e.g., a change in weather conditions may only allow work for ½ day and/or equipment failures/availability may result in fewer yards of asphalt being transported in a day).

The Government will provide a minimum of 24 hours’ notice prior to pick-up. Should the Government give less than 24 hours’ notice, the Contractor may elect either to load the trucks as requested or to schedule an alternate day. Pick-up days will be scheduled when conditions are favorable, and are weather dependent.

Inspection, Testing, &Acceptance:

The Contractor shall have test samples submitted to the Government for suitability evaluation at least two (2) weeks prior to the actual delivery or acceptance of the material. The Government may require additional material testing if specifications are suspect. Material that does not meet contract specifications and requirements following test sample evaluation and Government inspection shall be rejected. The Contractor shall be notified in writing to correct the deficiencies and must produce and acceptable product within five business days. Failure to furnish an acceptable product within five business days may result in the termination of the Contractor’s right to proceed.

Submittals: At the time of loading the trucks, and with each invoice, the Contractor shall provide truck scale weight tickets to the Government which shall serve as contractor certification as to the number of tons picked up.

Measurement and Payment/Method of Measurement:

The contractor shall furnish truck scale weight tickets from state certified scales for each pick up made to the Government. Payment will be made on actual quantities ordered and picked up in accordance with FAR 52.211-16 -- Variation in Quantity and 52.211-17 -- Delivery of Excess Quantities.