This is a Pricing Schedule for the CRIP Check Structures project in La Paz County, Arizona. The document contains three bid packages with multiple Contract Line Items (CLINs) that bidders must price individually, with the combined total of all bids determining the low bidder.
Base Bid (CLIN 5) covers the CRIP Lateral 73-36 Check 1 Replacement, comprising 15 lump-sum line items including mobilization, water control, site grading, structure excavation, cast-in-place concrete, cast-iron and stainless steel slide gates, precast concrete, piping, riprap, roadway surface course, and safety features. Bid Additive 1 includes three CLINs: CLIN 2 for a Design Contractor-furnished MC420 Radial Gate (1 lump-sum item); CLIN 3 for CRIP MC420 Check Replacement (20 lump-sum items covering mobilization, water control, excavation, concrete work, gate installation, buildings, electrical systems, demolition, and related work); and CLIN 4 for MC420 Electrical Transmission and Distribution Modifications (18 lump-sum and unit-priced items for transmission and distribution structure work, plus a foundation unit adjustment price at $1 per cubic yard for foundation modifications). Bid Additive 2 contains CLIN 1 for CRIP MC185 and MC270 Check Rehabilitation (15 lump-sum items for mobilization, demolition, concrete repairs, radial and lateral gate installation, buildings, electrical systems, and road work). All CLINs include a 3.5% TERO (Tribal Employment Rights Ordinance) fee. Bidders are responsible for determining applicable TERO fees and complying with the CRIT TERO Ordinance, with the successful bidder responsible for prompt payment.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRIP Check Structures SECTION 00 41 10 La Paz County, Arizona PRICING SCHEDULE
\\dowl.com\j\Projects\26\12494-01\81Specs\Procurement\00 41 10 - Pricing Schedule_20241213.docx 00 41 10-1
Provide a price for all unit items in all pricing schedules for the Base Bid, Bid Additive 1, and Bid Additive 2. The combined total of the Base Bid, Bid Additive 1, and Bid Additive 2 will be the basis for comparing bids and determining the low bidder.
Bidders are responsible for determining applicable TERO fees and for complying with the CRIT TERO Ordinance. The successful Bidder is responsible for prompt payment of all applicable TERO fees.
BASE BID
CLIN 5 – CRIP Lateral 73-36 Check 1 Replacement
Item No.[5]
Description Est.
Quantity Unit Unit Price Bid Amount
501 Mobilization and Preparatory Work 1 LS
Water Control, Temporary Bypass, and Construction Dewatering
1 LS
503 Site Grading 1 LS
Structure Excavation, Foundation Improvements, Bedding, and Backfill
1 LS
505 Cast-in-place Concrete 1 LS
506 Cast-iron Slide Gates and Appurtenances 1 LS
507 Wooden Weir Crest 1 LS
508 Precast Structural Concrete 1 LS
Stainless Steel Slide Gate and Appurtenances
1 LS
Pipe Railing, Walkways, and Miscellaneous Metals
1 LS
511 Demolition 1 LS
Glass Reinforced Fiberglass Pipe and Fittings
1 LS
513 Riprap 1 LS
514 Roadway Surface Course 1 LS
515 Safety Features and Signage 1 LS
TERO fees associated with this pricing schedule 3.5%
TOTAL BASE BID (i.e., Total of all CLIN 5 items)
[5] Refer to specification Section 01 29 00 – Payment Procedures of the CRIP Lateral 73-36 Check 1 Replacement Project Manual for complete descriptions of each CLIN 5 bid item.
\\dowl.com\j\Projects\26\12494-01\81Specs\Procurement\00 41 10 - Pricing Schedule_20241213.docx 00 41 10-2
BID ADDITIVE 1
CLIN 2 – Design Contractor-furnished MC420 Radial Gate
Item No.[2]
Description Est.
Quantity Unit Unit Price Bid Amount
Design Contractor-furnished MC420 Radial Gate and Appurtenances
1 LS
TERO fees associated with this pricing schedule 3.5%
Total of all CLIN 2 items
[2] Refer to specification Section 01 29 00 – Payment Procedures of the CRIP MC420 Check Replacement Project Manual for complete descriptions of each CLIN 2 bid item.
CLIN 3 – CRIP MC420 Check Replacement
Item No.[6]
Description Est.
Quantity Unit Unit Price Bid Amount
301 Mobilization and Preparatory Work 1 LS
Water Control and Construction Dewatering
1 LS
303 Site Grading 1 LS
304 Drain Ditch Pipe Culverts 1 LS
Structure Excavation, Foundation Improvements, and Backfill
1 LS
Canal Subgrade Preparation and Foundation Improvements
1 LS
307 Stilling Wells 1 LS
308 Concrete Structures 1 LS
309 Concrete Canal Lining 1 LS
Provide and Install Contractor Furnished Radial Gate and Appurtenances
1 LS
311 Pipe Railings and Miscellaneous Metals 1 LS
312 Control Building 1 LS
313 Electrical Equipment and Control System 1 LS
314 Demolition 1 LS
315 Roadway Surface Course 1 LS
316 Reclamation and Seeding 1 LS
317 Fencing, Signage, and Gates 1 LS
318 Safety Features 1 LS
319 Stainless Steel Stop Log Guides 1 LS
320 Field Directed Earthwork 1 LS
TERO fees associated with this pricing schedule 3.5%
Total of all CLIN 3 items
[6] Refer to specification Section 01 29 00 – Payment Procedures of the CRIP MC420 Check Replacement Project Manual for complete descriptions of each CLIN 3 bid item.
\\dowl.com\j\Projects\26\12494-01\81Specs\Procurement\00 41 10 - Pricing Schedule_20241213.docx 00 41 10-3
CLIN 4 – CRIP MC420 Electrical Transmission and Distribution Modifications
Item No.
Description Est.
Quantity Unit Unit Price Bid Amount
401 Steel Vendor Selection 1 LS
402 Mobilization and Preparatory work 1 LS
403 Transmission Foundations[3] 4 EA
404 De-energizing 1 EA
405 Transmission Structures / Installation 1 LS
406 Transmission Switch / Installation 1 EA
407 Existing Transmission Structure Mod. 2 EA
408 Transmission Wire Installation 1 LS
409 Transmission Grounding Installation 1 LS
410 Transmission Switch Fencing Installation 1 LS
411 Distribution Structures/ Installation 2 EA
Existing Distribution Structure Modification
1 EA
413 Distribution Wire Installation 1 LS
414 Retired Wire Removal 1 LS
415 Retired Transmission Structure Removal 4 EA
416 Retired Distribution Structure Removal 3 EA
417 Re-energizing 1 LS
418 Demobilization 1 LS
TERO fees associated with this pricing schedule 3.5%
Total of all CLIN 4 items
[3] Bid Item 403 is based on the foundation dimensions shown in the drawings. BIA intends to update the foundation designs based on the final reactions from the Contractor-procured transmission poles. Refer to Bid Item 419.
CRIP MC420 Electrical Transmission and Distribution Unit Price Adjustments
Item No.
Description Est.
Quantity Unit Unit Price Bid Amount
Foundation Unit Adjustment Price[4] (Including TERO)
1 CY
[4] Bid Item 419 is the unit adjustment price BIA will use, only in the event of foundation size modifications, to either increase (larger foundation than planned) or decrease (smaller foundation than planned) the price of the work relative to the price established under Bid Item 403. Bid Item 419 is not included in the total price of Bid Additive 1.
TOTAL BID ADDITIVE 1 _________________________________________
The Total Bid Additive 1 price shall be the combined total of the CLIN 2, CLIN 3, and CLIN 4 Pricing Schedules and shall not include the unit price adjustment described as Item Number 419.
\\dowl.com\j\Projects\26\12494-01\81Specs\Procurement\00 41 10 - Pricing Schedule_20241213.docx 00 41 10-4
BID ADDITIVE 2
CLIN 1 – CRIP MC185 and MC270 Check Rehabilitation
Item No.[1]
Description Est.
Quantity Unit Unit Price Bid Amount
101 Mobilization and Preparatory Work 1 LS
102 Demolition 1 LS
103 Repair to Concrete Check Structures 1 LS
Install Contractor-furnished Radial Gates and Appurtenances at MC185
1 LS
Install Contractor-furnished Radial Gates and Appurtenances at MC270
1 LS
Install Owner Furnished Lateral Gates and Appurtenances at MC185
1 LS
Install Contractor Furnished Lateral Gates and Appurtenances at MC270
1 LS
108 Pipe Railings and Miscellaneous Metals 1 LS
109 Control Buildings 1 LS
110 Electrical Equipment and Control Systems 1 LS
111 Fencing, Signage, and Gates 1 LS
112 Safety Features 1 LS
113 Stainless Steel Stop Logs 1 LS
114 Stilling Wells 1 LS
115 Road Resurfacing and Widening 1 LS
TERO fees associated with this pricing schedule 3.5%
TOTAL BASE BID (i.e., Total of all CLIN 1 items)
[1] Refer to specification Section 01 29 00 – Payment Procedures of the CRIP MC185/MC270 Check Rehabilitation Project Manual for complete descriptions of each CLIN 1 bid item.
TOTAL OF ALL BID SCHEDULES
TOTAL BID_________ _______________________________
The Total Bid is the sum of the Base Bid, Bid Additive 1, and Bid Additive 2.
| Base Bid |
| CLIN 5 – CRIP Lateral 73-36 Check 1 Replacement |
| Bid Additive 1 |
| CLIN 2 – Design Contractor-furnished MC420 Radial Gate |
| CLIN 3 – CRIP MC420 Check Replacement |
| CLIN 4 – CRIP MC420 Electrical Transmission and Distribution Modifications |
| CRIP MC420 Electrical Transmission and Distribution Unit Price Adjustments |
| TOTAL BID ADDITIVE 1 _________________________________________ |
| The Total Bid Additive 1 price shall be the combined total of the CLIN 2, CLIN 3, and CLIN 4 Pricing Schedules and shall not include the unit price adjustment described as Item Number 419. |
| Bid Additive 2 |
| CLIN 1 – CRIP MC185 and MC270 Check Rehabilitation |
| TOTAL of All Bid Schedules |
| TOTAL BID_________ _______________________________ |