B08_A004_Original_As-Builts_from_1994.pdf

PDF 2 MB Posted

Attached to
LOWE - Repair Northern Canal Pedestrian Bridge
Solicitation number
140P4321R0018
Issued by

About this file

This document package includes design plans and calculations for the rehabilitation of the Northern Canal Pedestrian Bridge in Lowell, Massachusetts. The National Park Service is soliciting bids under solicitation number 140P4321R0018 to replace all structural elements of the bridge with the same size and material as the original construction. Key elements to be replaced include railings totaling 170 feet, 12 bearing devices totaling 61.6 inches, three girders totaling 977 inches, timber decking totaling 81.4 feet by 7 feet, and cleaning and repainting of approximately 600 square feet of structural steel. The calculations provided support that no new design or structural capacity analysis is required given the like-for-like replacement scope of work. The involved federal agency is the Department of the Interior National Park Service Northeast Region.

View the file

Other files

File Type Posted
Sol_140P4321R0018_Amd_0001.pdf PDF
B08_A003_Bridge_Inspection_Report.pdf PDF
B08_A001_Specifications.pdf PDF
Sol_140P4321R0018.pdf PDF
B08_A002_Project_Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOWE – 238156

Rehabilitate Northern Canal Pedestrian Bridge

National Park Service

U.S. Department of the Interior

DENVER SERVICE CENTER

in collaboration with

LOWELL NATIONAL HISTORICAL

PARK

LOWELL, MA

DESIGN SERVICES FOR DESIGN

DEVELOPMENT AND CONSTRUCTION

DOCUMENTS

Rehabilitate Northern Canal Pedestrian Bridge

Calculation Note

National Park Service Lowell, MA

100% PS&E Documents

November, 2019

Prepared by:

Jacobs

Contract No. P15PC00018

LOWE 238156

Rehabilitate Northern Canal Pedestrian Bridge

Quantities Calculation Notes

Document Version

November 2019

National Park Service Lowell, MA

Document Ti tle

Quantities Calculation Notes

Document No. (JETT)

Calculation statement:

As instructed in plans, contractor will replace all elements with same size and material used to build this bridge so there is no new design or capacity calculation. Following is the list of quantities used in this project coming with their calculations.

New railing length 82x2=170ft Number of Bearing device 12

7+2x24+(7‐.395)=61.6in Girder length = (71'‐9")+(9'‐7 13/16")=977in Painting area: 61.6"x3x977"=180550in2=1253ft2

3 Girder 20%↑ 1.2*1253=1500ft2

Timber decking L= (71"‐9")+(9'‐713/16")=81.4ft W=7'

Clean and repaint of structural steel ( W24x55‐main girder)‐from as built plans

570ft2, Assumed 600ft2

Prepared by:
Jacobs Report.pdf
Contents
Acronyms and Abbreviations
1. Introduction
1.1 Heading 2
1.1.1 Heading 3
1.1.1.1 Heading 4
Heading 5
Heading 6
1.1.1.2 Heading 4
Heading 5
Heading 6
1.2 Heading 2
1.2.1 Heading 3
1.2.2 Heading 3

1.3 Numbered List Example

2. Heading 1
2.1 Heading 2
2.2 Heading 2
3. Heading 1
3.1 Heading 2

File details come from the government source that posted it. Updated .