This pre-solicitation notice describes a federal contract opportunity for the National Park Service to replace failing solar array panels at Natural Bridges National Monument in Lake Powell, Utah. The project, valued between $500,000 and $1,000,000, involves comprehensive solar system renovation including demolition and disposal of existing photovoltaic components, installation of upgraded PV panels and inverters, replacement of the hydrogen gas detection system, integration with existing electrical infrastructure, and creating a new digital energy display at the Visitor Center. The contract will be a firm-fixed price, set aside 100% for total small businesses, with performance expected between July 1, 2025 and June 30, 2026.

Key administrative details include a solicitation number of 140P1225R0008, NAICS code 237310, and a requirement for offerors to have a UEI number and be registered in the System for Award Management (SAM). The official solicitation will be issued in early June 2025, with evaluation factors including technical merit, past performance, and price. Potential contractors are strongly encouraged to attend a forthcoming site visit to fully understand project requirements. The point of contact is Billie Thomas, Contracting Officer, who can be reached at Billie_thomas@nps.gov or (406) 599-4402.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-SOLICITATION NOTICE: 44010798

The National Park Service, CONOPS Central Buying Office, intends to issue a Request for Proposal (RFP) for Replace Failing Solar Array Panels at Natural Bridges National Monument, Lake Powell, UT 84533-0001.

The project covers work at the solar array field, the Battery Building, and minor work at the main Visitor Center. The Work consists of:

1. Demolition and proper disposal of existing photovoltaic (PV) system components including aging PV panels, PV inverters, battery inverters, above ground PV wiring, and the PV system control panel. The PV array racking is intended to be reused and reconfigured as needed for the new system components unless the optional work is selected. Demolition work will also include the existing hydrogen gas monitoring system from the battery and inverter building.

2. Providing replacement of demolished PV system components including PV panels, PV inverters, battery inverters, above ground PV wiring, and the PV system multi-cluster control panel. PV panels are to be upgraded based on latest available technologies. The inverters and associated equipment are anticipated to be replaced in-kind with the same manufacturer, SMA. Replace all the above ground, direct current (DC) wiring from the PV modules and strings. Replace the interior DC combiner fuse box at the inverter room with new overcurrent protection board. Provide new permanent labeling to all components to comply with latest NEC requirements.

Update the lightning protection system as required for the new PV array layout.

3. Replacement of the existing hydrogen gas detection and alarm system. Reuse the existing power and control wiring where available and integrate with other systems per the existing system configuration.

4. Proper disposal of the previously demolished PV panels that are currently located in the PV array field. The quantity of these panels is estimated at five hundred (500) and may vary in age and manufacturer.

5. Integration of the PV components with the site electrical generation and distribution including the existing diesel fired generator system.

6. Providing a new digital display at the Visitor Center front desk to show energy data collection from the site micro-grid system. The display will be connected to the nongovernment internet network that is existing at the Battery Building. The data collection will be SMA WebBox, Flashview, and Sunny Portal, or functionally similar. The data display will be government furnished equipment.

7. Start-up and testing of the newly installed components and the integration with the existing site utility system. Testing will demonstrate system performance across the entire range of conditions. Proper system training will be provided to NPS staff. The contractor will be responsible for preparing a complete system manual covering all electrical generation and energy storage components. The system manual will include but may not be limited to asbuilt documents, operating and maintenance (O&M) documents, standard operating procedures, and hazard analysis.

8. Testing of all existing to remain system components. This will include diagnostics of the existing underground PV electrical wiring, existing to remain PV array panels, and other miscellaneous PV system components. The contractor must submit the proposed testing plan for approval by NPS prior to mobilization and system test results. The results must include test data, contractor recommendations, and known future system needs.

9. Optional work that may be selected by the Government:

a. Complete removal of all unused panel racking and replacement of all racking for the newly installed and existing to remain array panels. New array racking will be compatible with the new PV panels, rated for the installation site, and optimized for installation angle, shading, etc. based on the installation location. This work will include any foundation and structural work required and additional site grading to return the array field to an acceptable condition.

SOLICITATION NUMBER: 140P1225R0008

INSTRUCTIONS: Submit your contact information and UEI with SAM.gov to Billie_thomas@nps.gov and IDENTIFY any established contracts with the National Park Service.

PROJECT MAGNITUDE: (e) Between $500,000 and $1,000,000

TYPE OF CONTRACT: This will be a firm-fixed price contract or task or under an established contract expected to be awarded to a prime contractor by mid/late June 2025 with performance between July 1, 2025 and June 30, 2026. Construction Wage Rate Requirements for Garfield County, Utah will apply.

EVALUATION FACTORS: Technical, Past Performance, and Price

North American Industry Classification System (NAICS) CODE CLASSIFICATION and SET ASIDE: The NAICS Code is 237310, and the size standard is $45.0 million.

This project is set aside 100% for Total Small Businesses.

SITE VISIT: A site visit date, time, and meeting location will be announced in the solicitation. Offerors are highly encouraged to attend the scheduled site visit to inspect the site and to ensure they fully understand the requirement and conditions that may affect the cost of the project, specifications, and performance.

PUBLICIZING: The official solicitation and its attachments will be issued and available early June 2025 and may be issued directly to contractors under an established contract or posted to the Contract Opportunities/SAM.gov website at https://sam.gov/content/opportunities.

The contracting office will not provide hardcopies or email copies of the solicitation.

REGISTRATIONS: In order to be awarded a contract, an offeror must have an UEI number. Also, the offeror must be registered and active in the System for Award Management (SAM), website at http://www.sam.gov, and have completed their Online Representations and Certifications at the time of the solicitation close date once the solicitation is posted.

POINT OF CONTACT: Billie Thomas, Contracting Officer, Billie_thomas@nps.gov (406) 599-4402.