CARLSBAD CAVERNS NATIONAL PARK

STATEMENT OF WORK

CAVE 317787 - GEOPHYSICAL SURVEY

28 MARCH 2022

1. SCOPE OF WORK: Provide all labor, supplies, equipment, materials, tools, and skilled supervision to provide geophysical survey work at Carlsbad Caverns National Park, Carlsbad, New Mexico. The base effort of the geophysical survey will identify voids beneath the ground surface throughout the Park in the areas indicated in Exhibit A

(approximately 35 acres; does not include Area 5). The optional effort of the geophysical survey will identify voids beneath the ground surface within the approximate 23 acres of

Area 5.

The primary goal is to determine if/where voids exist so the NPS can plan for future below-grade utility work. Of most importance are voids that are 6' diameter or larger down to a depth of at least 20', as well as any void larger than 50’ in diameter down to a depth of 50’. A final deliverable will be required as a report and map showing void locations/depths that is tied into an existing topographical survey that already exists at the

Park (Available upon request prior to award; the survey will be provided to the awardee in AutoCAD format).

The NPS anticipates the work will include the use of a walk-behind ground-penetrating radar (GPR) Instrument for paved areas and alternative methods, such as electro-resistivity, where GPR is not feasible. A significant portion of the geophysical survey is anticipated to be outside paved areas.

2. LOCATION: The project work is located at Carlsbad Caverns National Park in the areas identified on Exhibit A. Complete a walk-through with Park staff to ensure that the boundaries of the survey are accurately staked out prior to beginning field work.

3. PERIOD OF PERFORMANCE: Ninety (90) days from date of award. Final schedule shall be provided within 10 days of award.

4. WORKING HOURS: Normal working hours are 08:00 to 17:00 Hours. Other times may be available after coordination with the Contracting Officer Representative and Park

Representative, such as beginning daily work 30 minutes after sunrise and completing daily work 30 minutes before sunset. Weekend days may also be coordinated. The contractor shall coordinate for all parking lots with the NPS for shutdown timelines. Specifically of note, the east parking lot will be impacted by the bat flight program during April through

November.

5. DELIVERABLE: A final deliverable will be required as a report and map showing void locations/depths that is tied into an existing topo survey. Mapping shall be color coded to indicate void shape and depth. Report and mapping shall meet typical industry standards for geophysical survey work.

a. Initial/Draft Report and Map for NPS review.

i. Provide in native file format & PDF format within two weeks of finalizing field work.

b. Final Report to incorporate comments from the NPS.

i. Provide in native file format & PDF format within two weeks of receiving

NPS review comments of initial/draft report.

c. Note: Final mapping deliverable shall be incorporated into existing Park AutoCAD survey file.

6. JOB CONDITIONS:

a. Public Use Areas: The site is open to the public, and extreme care shall be used when entering, leaving, and operating on park grounds. Work areas shall be roped or barricaded by the Contractor to prevent public ingress and egress to work areas.

b. Site Features: The area is hilly with rough terrain. Note no ATVs are allowed per the applicable contract clause. Disturbance of artifacts or historic material is prohibited. The Contractor shall use extreme care to protect site features from damage. All contract clauses will be in full effect for any damages caused by the contractor.

c. Contractor’s Equipment: Contractor shall coordinate a staging area with the NPS after award. All contractor equipment shall be removed from the site daily or stored in accordance with arrangements made with the Contracting Officer and

Park Representative for on-site/park storage area.

7. EXECUTION

a. Examination of Site: Contractor shall visit and carefully examine the site and shall familiarize himself/herself with the conditions under which the work must be carried out.

b. Site Security: Work zones shall be roped or barricaded to prevent public ingress/egress. Cones, ropes, flagging, contractor monitoring, etc. can all be used to accomplish this task.

c. Standards: All work performed by the Contractor under this contract shall conform to established trade standards, and with the requirements of the National

Park Service.

d. Daily Cleanup: All debris shall be cleaned up and removed from the park daily.

e. Final Cleanup: All tools, equipment, surplus materials, and contractor generated rubbish shall be removed from the site upon completion of contract.

8. RESPONSIBILITY OF THE CONTRACTOR: The contractor is responsible for the safety of their employees and shall adhere to all applicable OSHA safety requirements. Any damage to property of the United States shall be corrected as governed by the "Protection of

Government Buildings, Equipment, and Vegetation" clause of the contract.

9. DISCOVERY OF RESOURCES

a. Archeological Findings: Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed only by the Government. Should Contractor's operations uncover or his employees find any archeological remains, Contractor shall suspend operations at the site of discovery; halt work within 600 feet of the discovery; and notify

Contracting Officer or their representative immediately of the findings. Included with the notification shall be a brief statement of the location and details of the findings. Work may resume when directed by the Contracting Officer or their representative. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for Contractor, the Contractor will be compensated by an equitable adjustment under the General Provisions of the Contract.

b. In the event that human remains are discovered, all work must stop. The NPS

Cultural Resource Specialist will follow procedures outlined in the Native American

Graves Protection and Repatriation Act (NAGPRA) to protect the site.

c. All archeological discoveries are confidential and information about those discoveries shall not be shared with anyone outside the Government.

10. SITE VISIT: Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

11. PRE-PERFORMANCE CONFERENCE: A meeting will be scheduled with the awardee to cover all on-site details and coordination, such as where vehicles can be driven and to coordinate the work schedule. No work on site shall begin until the Contracting Officer and

Park Representative provide written confirmation to the contractor.

mhirschbeck Text Box mhirschbeck Text Box mhirschbeck Text Box mhirschbeck Text Box mhirschbeck Text Box mhirschbeck Rectangle mhirschbeck Text Box mhirschbeck Text Box

CARLSBAD CAVERNS NATIONAL PARK

STATEMENT OF WORK

CAVE 317787 - GEOPHYSICAL SURVEY

4 MARCH 2022

EXHIBIT A - GEOPHYSICAL SURVEY BOUNDARIES

mhirschbeck Text Box Note: Area 5 included in Optional Effort Only.