B08_24R0036_Attachment_6_-_Lim_on_SubK_Breakout.xlsx
XLSX spreadsheet 91 KB Posted
- Attached to
- FAIRBANKS DISTRICT OFFICE ROOF REPLACEMENT
- Solicitation number
- 140L0624R0036
About this file
This document is an Excel attachment titled "Lim on Sub Breakout" that provides a template for contractors to detail their proposed labor and material costs, including amounts to be paid to small business subcontractors (SSS) and large business subcontractors (LBS), for a construction solicitation.
The related federal contract opportunity is for the roof replacement of the Bureau of Land Management (BLM) Fairbanks District Office in Fairbanks, Alaska. The solicitation number is 140L0624R0036 and the contract is set aside for small businesses with a 25% self-performance requirement. The performance period is 400 days after notice to proceed. The template requires the contractor to input the total proposed amount, total material cost, self-performed labor, SSS labor, and LBS labor, with the goal of demonstrating compliance with the limitation on subcontracting requirement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | 140L0624R0036 |
| Type of Set-Aside | Small Business |
| Performance Period | 400 Days after NTP |
| Required Self-Performance | 25% |
(A) Total Amount Proposed¹
(B) Total Material Cost
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor² | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost³ $0.00
| (G) Limitation on Subcontracting Percentage⁴ | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) = (B) + (F) |
| *Note 2: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor. |
| *Note 3: Total labor costs consist of all contractual costs other than material. |
| *Note 4: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .