B08_24Q0013_Atch_2_Pricing_Schedule_R_W_3.xlsx
XLSX spreadsheet 58 KB Posted
- Solicitation number
- 140L6224Q0013
About this file
This document is a pricing schedule template for a federal contract opportunity titled "Wyoming Statewide Riparian and Wetland Data AIM Collection/Surveys - Combined." The opportunity is being solicited by the Department of the Interior Bureau of Land Management National Office for riparian and wetland monitoring surveys using the Bureau of Land Management's Assessment, Inventory and Monitoring (AIM) protocols.
The pricing schedule includes a base period and four option periods from 2025 to 2029, with both required tasks (Tasks 1-4) and an optional Task 5. The required tasks cover labor, travel, and other materials/training costs. Offerors must provide pricing for the base period and each option period, including the optional task. The total evaluated price for the 5-year period including all tasks is to be provided. No pricing information is included in the document, only the format and structure of the required pricing schedule.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Period
| Company Name: | |||||||||
| UEI #: | |||||||||
| **Rows may be inserted, as needed. Complete cells highlighted in yellow ONLY. | |||||||||
| Wyoming Riparian/Wetland AIM - Field Season 2025 | |||||||||
| BASE PERIOD: TASKS 1 - 4 | |||||||||
| Staff Hours | |||||||||
| Labor | Staff Hours | Burdened Hourly Rate | Sub Total | Total | Program Manager | Crew Manager | Crew Lead | Crew Member | |
| $0.00 | $0.00 | hrs/week | 40 | 40 | 40 | 40 | |||
| $0.00 | $0.00 | weeks/month | 2 | 4 | 4 | 4 | |||
| $0.00 | $0.00 | # months | 1.5 | 8 | 5.5 | 5 | |||
| $0.00 | $0.00 | # people | 1 | 1 | 3 | 3 | |||
| TASKS 1 - 4: Labor Price | $0.00 | ||||||||
| days/month | 21 | ||||||||
| TRAVEL: IAW FAR 31.205-46 | No. of Units | Unit Cost | Sub Total | Total | # months | 5 | |||
| total days | ERROR:#REF! | ||||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | # crews | 3 | ||||||
| $0.00 | $0.00 | # months | 5 | ||||||
| TASKS 1 - 4: Travel Price | $0.00 |
| Other: Equipment, Materials, & Training Supplies | No. of Units | Unit Cost | Sub Total | Total | ||
| $0.00 | $0.00 | AIM Training No. of Units | ||||
| $0.00 | $0.00 | # people | 6 | |||
| $0.00 | $0.00 | # days | 6 | |||
| $0.00 | $0.00 | total days | 36 | |||
| TASKS 1 - 4: Other Materials & Training Price | $0.00 |
CLIN 0010: FFP TOTAL: Tasks 1 - 4 $0.00
Option Period (1)
| Company Name: | |||||||||
| UEI #: | |||||||||
| **Rows may be inserted, as needed. Complete cells highlighted in yellow ONLY. | |||||||||
| Wyoming Riparian/Wetland AIM - Field Season 2026 | |||||||||
| OPTION PERIOD (OP) 1: TASKS 1 - 4 | |||||||||
| Staff Hours | |||||||||
| Labor | Staff Hours | Burdened Hourly Rate | Sub Total | Total | Program Manager | Crew Manager | Crew Lead | Crew Member | |
| 0 | $0.00 | $0.00 | hrs/week | 40 | 40 | 40 | 40 | ||
| 0 | $0.00 | $0.00 | weeks/month | 2 | 4 | 4 | 4 | ||
| 0 | $0.00 | $0.00 | # months | 1.5 | 8 | 5.5 | 5 | ||
| 0 | $0.00 | $0.00 | # people | 1 | 1 | 3 | 3 | ||
| TASKS 1 - 4: Labor Price | $0.00 | ||||||||
| days/month | 21 | ||||||||
| TRAVEL: IAW FAR 31.205-46 | No. of Units | Unit Cost | Sub Total | Total | # months | 5 | |||
| total days | ERROR:#REF! | ||||||||
| 0 | $0.00 | $0.00 | |||||||
| 0 | $0.00 | $0.00 | |||||||
| 0 | $0.00 | $0.00 | # crews | 3 | |||||
| 0 | $0.00 | $0.00 | # months | 5 | |||||
| TASKS 1 - 4: Travel Price | $0.00 |
| Other: Equipment, Materials, & Training Supplies | No. of Units | Unit Cost | Sub Total | Total | ||
| 0 | $0.00 | $0.00 | AIM Training No. of Units | |||
| 0 | $0.00 | $0.00 | # people | 6 | ||
| 0 | $0.00 | $0.00 | # days | 6 | ||
| 0 | $0.00 | $0.00 | total days | 36 | ||
| TASKS 1 - 4: Other Materials & Training Price | $0.00 |
CLIN 0110 FFP TOTAL - TASKS 1-4 $0.00
| OPTION PERIOD 1: OPTIONAL TASK 5 | |||||||||
| Staff Hours | |||||||||
| Labor | Staff Hours | Burdened Hourly Rate | Sub Total | Total | Program Manager | Crew Manager | Crew Lead | Crew Member | |
| 0 | $0.00 | $0.00 | hrs/week | 40 | 40 | 40 | 40 | ||
| 0 | $0.00 | $0.00 | weeks/month | 2 | 4 | 4 | 4 | ||
| 0 | $0.00 | $0.00 | # months | 1 | 6.5 | 5.5 | 5 | ||
| 0 | $0.00 | $0.00 | # people | 1 | 1 | 2 | 2 | ||
| Task 5: Labor Price | $0.00 | ||||||||
| days/month | 21 | ||||||||
| Travel: IAW FAR 31.205-46 | Estimated travel IAW FAR 31.205-46 | # months | 5 | ||||||
| No. of Units | Unit Cost | Sub Total | Total | total days | ERROR:#REF! | ||||
| 0 | $0.00 | $0.00 | |||||||
| 0 | $0.00 | $0.00 | # crews | 2 | |||||
| 0 | $0.00 | $0.00 | |||||||
| 0 | $0.00 | $0.00 | # months | 5 | |||||
| Task 5: Travel Price | $0.00 | total weeks | ERROR:#REF! |
| Other: Equipment, Materials, & Training: Equipment / Material list | ||||||
| No. of Units | Unit Cost | Sub Total | Total | |||
| 0 | $0.00 | $0.00 | AIM Training No. of Units | |||
| 0 | $0.00 | $0.00 | # people | 4 | ||
| 0 | $0.00 | $0.00 | # days | 6 | ||
| 0 | $0.00 | $0.00 | total days | 24 | ||
| Task 5: Other Materials & Training Price | $0.00 |
CLIN 0115 TOTAL FFP - OPTIONAL TASK 5 $0.00
OP1: TOTAL QUOTED PRICE INCLUDING (ALL TASKS) $0.00
Option Period (2)
| Company Name: | |||||||||
| UEI #: | |||||||||
| **Rows may be inserted, as needed. Complete cells highlighted in yellow ONLY. | |||||||||
| Wyoming Riparian/Wetland AIM - Field Season 2027 | |||||||||
| OPTION PERIOD (OP) 2: TASKS 1 - 4 | |||||||||
| Staff Hours | |||||||||
| Labor | Staff Hours | Burdened Hourly Rate | Sub Total | Total | Program Manager | Crew Manager | Crew Lead | Crew Member | |
| $0.00 | $0.00 | hrs/week | 40 | 40 | 40 | 40 | |||
| $0.00 | $0.00 | weeks/month | 2 | 4 | 4 | 4 | |||
| $0.00 | $0.00 | # months | 1.5 | 8 | 5.5 | 5 | |||
| $0.00 | $0.00 | # people | 1 | 1 | 3 | 3 | |||
| TASKS 1 - 4: Labor Price | $0.00 | ||||||||
| days/month | 21 | ||||||||
| TRAVEL: IAW FAR 31.205-46 | No. of Units | Unit Cost | Sub Total | Total | # months | 5 | |||
| total days | ERROR:#REF! | ||||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | # crews | 3 | ||||||
| $0.00 | $0.00 | # months | 5 | ||||||
| TASKS 1 - 4: Travel Price | $0.00 |
| Other: Equipment, Materials, & Training Supplies | No. of Units | Unit Cost | Sub Total | Total | ||
| $0.00 | $0.00 | AIM Training No. of Units | ||||
| $0.00 | $0.00 | # people | 6 | |||
| $0.00 | $0.00 | # days | 6 | |||
| $0.00 | $0.00 | total days | 36 | |||
| TASKS 1 - 4: Other Materials & Training Price | $0.00 |
CLIN 0210 FFP TOTAL - TASKS 1-4 $0.00
| OPTION PERIOD 2: OPTIONAL TASK 5 | |||||||||
| Staff Hours | |||||||||
| Labor | Staff Hours | Burdened Hourly Rate | Sub Total | Total | Program Manager | Crew Manager | Crew Lead | Crew Member | |
| $0.00 | $0.00 | hrs/week | 40 | 40 | 40 | 40 | |||
| $0.00 | $0.00 | weeks/month | 2 | 4 | 4 | 4 | |||
| $0.00 | $0.00 | # months | 1 | 6.5 | 5.5 | 5 | |||
| $0.00 | $0.00 | # people | 1 | 1 | 2 | 2 | |||
| Task 5: Labor Price | $0.00 | ||||||||
| days/month | 21 | ||||||||
| Travel | Estimated travel IAW FAR 31.205-46 | # months | 5 | ||||||
| No. of Units | Unit Cost | Sub Total | Total | total days | ERROR:#REF! | ||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | # crews | 2 | ||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | # months | 5 | ||||||
| Task 5: Travel Price | $0.00 | total weeks | ERROR:#REF! |
| Other: Equipment, Materials, & Training: Equipment / Material list | ||||||
| No. of Units | Unit Cost | Sub Total | Total | |||
| $0.00 | $0.00 | AIM Training No. of Units | ||||
| $0.00 | $0.00 | # people | 4 | |||
| $0.00 | $0.00 | # days | 6 | |||
| $0.00 | $0.00 | total days | 24 | |||
| Task 5: Other Materials & Training Price | $0.00 |
CLIN 0215 TOTAL FFP - OPTIONAL TASK 5 $0.00
OP2: TOTAL QUOTED PRICE INCLUDING (ALL TASKS) $0.00
Option Period (3)
| Company Name: | |||||||||
| UEI #: | |||||||||
| **Rows may be inserted, as needed. Complete cells highlighted in yellow ONLY. | |||||||||
| Wyoming Riparian/Wetland AIM - Field Season 2028 | |||||||||
| OPTION PERIOD (OP) 3: TASKS 1 - 4 | |||||||||
| Staff Hours | |||||||||
| Labor | Staff Hours | Burdened Hourly Rate | Sub Total | Total | Program Manager | Crew Manager | Crew Lead | Crew Member | |
| $0.00 | $0.00 | hrs/week | 40 | 40 | 40 | 40 | |||
| $0.00 | $0.00 | weeks/month | 2 | 4 | 4 | 4 | |||
| $0.00 | $0.00 | # months | 1.5 | 8 | 5.5 | 5 | |||
| $0.00 | $0.00 | # people | 1 | 1 | 3 | 3 | |||
| TASKS 1 - 4: Labor Price | $0.00 | ||||||||
| days/month | 21 | ||||||||
| TRAVEL: IAW FAR 31.205-46 | No. of Units | Unit Cost | Sub Total | Total | # months | 5 | |||
| total days | ERROR:#REF! | ||||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | # crews | 3 | ||||||
| $0.00 | $0.00 | # months | 5 | ||||||
| TASKS 1 - 4: Travel Price | $0.00 |
| Other: Equipment, Materials, & Training Supplies | No. of Units | Unit Cost | Sub Total | Total | ||
| $0.00 | $0.00 | AIM Training No. of Units | ||||
| $0.00 | $0.00 | # people | 6 | |||
| $0.00 | $0.00 | # days | 6 | |||
| $0.00 | $0.00 | total days | 36 | |||
| TASKS 1 - 4: Other Materials & Training Price | $0.00 |
CLIN 0310 FFP TOTAL - TASKS 1-4 $0.00
| OPTION PERIOD 3: OPTIONAL TASK 5 | |||||||||
| Staff Hours | |||||||||
| Labor | Staff Hours | Burdened Hourly Rate | Sub Total | Total | Program Manager | Crew Manager | Crew Lead | Crew Member | |
| $0.00 | $0.00 | hrs/week | 40 | 40 | 40 | 40 | |||
| $0.00 | $0.00 | weeks/month | 2 | 4 | 4 | 4 | |||
| $0.00 | $0.00 | # months | 1 | 6.5 | 5.5 | 5 | |||
| $0.00 | $0.00 | # people | 1 | 1 | 2 | 2 | |||
| Task 5: Labor Price | $0.00 | ||||||||
| days/month | 21 | ||||||||
| Travel | Estimated travel IAW FAR 31.205-46 | # months | 5 | ||||||
| No. of Units | Unit Cost | Sub Total | Total | total days | ERROR:#REF! | ||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | # crews | 2 | ||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | # months | 5 | ||||||
| Task 5: Travel Price | $0.00 | total weeks | ERROR:#REF! |
| Other: Equipment, Materials, & Training: Equipment / Material list | ||||||
| No. of Units | Unit Cost | Sub Total | Total | |||
| $0.00 | $0.00 | AIM Training No. of Units | ||||
| $0.00 | $0.00 | # people | 4 | |||
| $0.00 | $0.00 | # days | 6 | |||
| $0.00 | $0.00 | total days | 24 | |||
| Task 5: Other Materials & Training Price | $0.00 |
CLIN 0315 TOTAL FFP - OPTIONAL TASK 5 $0.00
OP3: TOTAL QUOTED PRICE INCLUDING (ALL TASKS) $0.00
Option Period (4)
| Company Name: | |||||||||
| UEI #: | |||||||||
| **Rows may be inserted, as needed. Complete cells highlighted in yellow ONLY. | |||||||||
| Wyoming Riparian/Wetland AIM - Field Season 2029 | |||||||||
| OPTION PERIOD (OP) 4: TASKS 1 - 4 | |||||||||
| Staff Hours | |||||||||
| Labor | Staff Hours | Burdened Hourly Rate | Sub Total | Total | Program Manager | Crew Manager | Crew Lead | Crew Member | |
| $0.00 | $0.00 | hrs/week | 40 | 40 | 40 | 40 | |||
| $0.00 | $0.00 | weeks/month | 2 | 4 | 4 | 4 | |||
| $0.00 | $0.00 | # months | 1.5 | 8 | 5.5 | 5 | |||
| $0.00 | $0.00 | # people | 1 | 1 | 3 | 3 | |||
| TASKS 1 - 4: Labor Price | $0.00 | ||||||||
| days/month | 21 | ||||||||
| TRAVEL: IAW FAR 31.205-46 | No. of Units | Unit Cost | Sub Total | Total | # months | 5 | |||
| total days | ERROR:#REF! | ||||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | # crews | 3 | ||||||
| $0.00 | $0.00 | # months | 5 | ||||||
| TASKS 1 - 4: Travel Price | $0.00 |
| Other: Equipment, Materials, & Training Supplies | No. of Units | Unit Cost | Sub Total | Total | ||
| $0.00 | $0.00 | AIM Training No. of Units | ||||
| $0.00 | $0.00 | # people | 6 | |||
| $0.00 | $0.00 | # days | 6 | |||
| $0.00 | $0.00 | total days | 36 | |||
| TASKS 1 - 4: Other Materials & Training Price | $0.00 |
CLIN 0410 FFP TOTAL - TASKS 1-4 $0.00
| OPTION PERIOD 4: OPTIONAL TASK 5 | |||||||||
| Staff Hours | |||||||||
| Labor | Staff Hours | Burdened Hourly Rate | Sub Total | Total | Program Manager | Crew Manager | Crew Lead | Crew Member | |
| $0.00 | $0.00 | hrs/week | 40 | 40 | 40 | 40 | |||
| $0.00 | $0.00 | weeks/month | 2 | 4 | 4 | 4 | |||
| $0.00 | $0.00 | # months | 1 | 6.5 | 5.5 | 5 | |||
| $0.00 | $0.00 | # people | 1 | 1 | 2 | 2 | |||
| Task 5: Labor Price | $0.00 | ||||||||
| days/month | 21 | ||||||||
| Travel | Estimated travel IAW FAR 31.205-46 | # months | 5 | ||||||
| No. of Units | Unit Cost | Sub Total | Total | total days | ERROR:#REF! | ||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | # crews | 2 | ||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | # months | 5 | ||||||
| Task 5: Travel Price | $0.00 | total weeks | ERROR:#REF! |
| Other: Equipment, Materials, & Training: Equipment / Material list | ||||||
| No. of Units | Unit Cost | Sub Total | Total | |||
| $0.00 | $0.00 | AIM Training No. of Units | ||||
| $0.00 | $0.00 | # people | 4 | |||
| $0.00 | $0.00 | # days | 6 | |||
| $0.00 | $0.00 | total days | 24 | |||
| Task 5: Other Materials & Training Price | $0.00 |
CLIN 0415 TOTAL FFP - OPTIONAL TASK 5 $0.00
OP4: TOTAL QUOTED PRICE INCLUDING (ALL TASKS) $0.00
Total Evaluated Price
| Company Name: | ||||||
| UEI #: | ||||||
| Wyoming Riparian Wetland AIM: Field Seasons 2025 - 2029 | ||||||
| TOTAL QUOTED PRICE - REQUISITE TASKS (Not including optional task 5) | ||||||
| Labor Category | BASE | OP1 | OP2 | OP3 | OP4 | TOTAL |
| Total | Total | Total | Total | Total | 5 YEAR TOTAL | |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Labor Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAVEL: IAW FAR 31.205-46 | BASE | OP1 | OP2 | OP3 | OP4 | TOTAL |
| Total | Total | Total | Total | Total | 5 YEAR TOTAL | |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Travel Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Other Materials & Training | BASE | OP1 | OP2 | OP3 | OP4 | TOTAL |
| Total | Total | Total | Total | Total | 5 YEAR TOTAL | |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Other Direct Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL FOR REQUISITE TASKS 1 - 4 | ||||||
| (Not including optional task 5) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
TOTAL QUOTED PRICE OPTIONAL TASK 5 (ONLY)
| Labor | BASE | OP1 | OP2 | OP3 | OP4 | TOTAL |
| Total | Total | Total | Total | Total | 5 YEAR TOTAL | |
| 0 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPTIONAL TASK 5 Total Labor Price | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAVEL: IAW FAR 31.205-46 | BASE | OP1 | OP2 | OP3 | OP4 | TOTAL |
| Total | Total | Total | Total | Total | 5 YEAR TOTAL | |
| 0 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPTIONAL TASK 5 Total Travel Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Other: Equipment, Materials, & Training: Equipment / Material list | BASE | OP1 | OP2 | OP3 | OP4 | TOTAL |
| Total | Total | Total | Total | Total | 5 YEAR TOTAL | |
| 0 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPTIONAL TASK 5 Total Other Direct Price | N/A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
TOTAL OPTIONAL TASK 5, ALL PERIODS $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL QUOTED & EVALUATED PRICE INCLUDING ALL OPTION PERIODS & OPTIONAL TASKS $0.00
File details come from the government source that posted it. Updated .