B09_Atch_5_Responses_to_Questions_(Amd_0001)_5.pdf

PDF 149 KB Posted

Attached to
Wyoming Statewide Riparian and Wetland Data AIM Collection/Surveys - Combined S
Solicitation number
140L6224Q0013
Issued by

About this file

This document is a set of responses to questions received regarding Amendment 0001 to a Request for Quotation (RFQ) for Wyoming Statewide Riparian and Wetland Data AIM Collection/Surveys. The key details are:

The RFQ is for riparian and wetland monitoring surveys using the Bureau of Land Management's (BLM) Assessment, Inventory and Monitoring (AIM) protocols. It allows subcontractor past performance to be used in proposals, with a maximum of two out of the three permitted references. The RFQ provides clarification on water quality monitoring equipment, the frequency of hummock and water quality monitoring, the estimated acreage of each plot, and the qualifications required for field botanist and soil scientist roles. The attachments to the solicitation appear to be duplicate files with no differences between them. Overall, the document provides responses to technical and administrative questions related to the requirements of the RFQ.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0001 WY Statewide Riparian Wetland

Data Collection Services

Responses to Questions Received Number RFQ

Section Pg./Para. Questions/Comments

1)

3 – Provision s and Clauses

Pg. 2, Para. 1- Past Performance

Q: Can subcontractor experience be used in the proposal?

Response: Yes. The following has been added to Attachment 3 – Provisions and Clauses, FAR 52.212-1 Addendum ‘A maximum of two

(2) (of the three references permitted) may be submitted with subcontractor past performance‘, as part of this amendment.

2) 1 –

PWS

Pg. 6, Para.

3.2.4

Q: Will utilizing a thermistor be sufficient for water quality monitoring?

Response: Reference updated hyperlink provided in PWS 2.2 for the Field Protocol for Lentic Riparian and Wetland Systems. Equipment needs to sample parameters listed in the protocol.

3) 1 –

PWS

Pg. 6, Para.

3.2.4

Q: How often will monitoring of Hummocks and water quality be required per year?

Response: Information may be obtained in the Field Protocol for Lentic Riparian and Wetland Systems. Reference updated hyperlink provided in

PWS 2.2

4) 1 –

PWS

Pg. 3, Table 2 Q: What is the estimated acreage range of each plot?

Response: See Response to Question 3.

5) 1 –

PWS

Pg. 10, Para.

5.2

Q: What are the qualifications needed for the Field Botanist and Field Soil Scientist?

Response: See revised Attachment 1 – PWS, Section 5.2. In addition, Field Crews will need to complete Field Methods Training as specified in 5.3 of the PWS.

6) 0 – SAM.go v Notice Attachm ents

All Attachments

Q: The documents on SAM.gov appear to be uploaded in duplicate.

Please confirm the files are duplicate attachments and there are no differences between the files.

Response: Attachments were inadvertently uploaded in duplicate. There are no differences between the duplicate copies. The RFQ contains a total of six (6) files:

1) Cover Letter: ‘B08 Combined Synopsis Solicitation 24Q0013’

2) Performance Work Statement (PWS) - (Atch 1)

3) Price Worksheet – (Atch 2)

4) Provisions and Clauses (including Addenda) – (Atch 3)

5) Department of Labor, Wage Determination – (Atch 4)

6) Question Submission Template– (Atch 5).

https://www.blm.gov/sites/default/files/docs/2024-04/FieldProtocolForLenticRiparianandWetlandSystems.pdf

File details come from the government source that posted it. Updated .