B08_140P1226Q0015__Attachment_1_SOW_Palisades_2.pdf
PDF 2 MB Posted
- Solicitation number
- 140P1226Q0015
About this file
Statement of Work Summary: Solid Waste Collection, Palisades Area, Rock Creek National Park
This Statement of Work describes solid waste collection and litter removal services for the Palisades area of Rock Creek National Park in Washington, DC (3545 Williamsburg Lane NW, Washington, DC 20008). The contractor must provide all personnel, equipment, vehicles, and materials necessary to collect refuse from designated trash cans and remove litter from park areas according to a specified schedule. The contract period is one year from award with four optional 12-month renewal periods. Work shall be performed Monday through Friday from 6:30 AM to 3:00 PM, with additional Saturday and Sunday service from 12:00 PM until completion during May through September (including federal holidays). More frequent services may be required from May through September due to higher visitor volume. The contractor must comply with all local, state, and federal regulations, including OSHA and District of Columbia environmental regulations related to solid waste handling, recycling, and disposal.
Key service requirements include: complete emptying of trash containers within scheduled timeframes and replacement with clear PVC liners; removal of litter (defined broadly to include paper, plastic, metal, glass, household trash, yard waste, and other man-made materials) from all open NPS-owned areas and adjoining wooded areas within 20 feet; disposal of collected waste at Rock Creek Maintenance Facility; and general housekeeping around trash cans. The contractor must maintain a minimum two-person crew per trash truck, submit a company safety plan addressing OSHA compliance, employee training, hazard recognition, and injury procedures, and develop a quality control program with customer complaint resolution procedures. All employees must wear matching uniforms with company identification and OSHA-approved fluorescent safety vests. Vehicles must display company permits, be equipped with back-up alarms, amber revolving lights, and slow-moving vehicle symbols, and comply with federal, state, and local safety requirements. The contractor is responsible for all damage to park property and must report accidents, incidents, and visitor complaints immediately to the Contracting Officer's Representative. The Government will conduct 100% and periodic on-site inspections, and deficient work must be corrected the same day or by noon the next work day without cost to the Government or face contract termination or re-performance by other sources at contractor expense. Payment is based on accepted work documented by a daily work log and signed acceptance report; invoices must be submitted through the Internet Payment Platform with unit descriptions and prices matching the original proposal.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLID WASTE COLLECTION PALISADES AREA
ROCK CREEK NATIONAL PARK
STATEMENT OF WORK
PART 1: SCOPE
A. The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision and other items and services necessary to perform refuse collection and emptying of trash cans from the areas on the attached list of sites and park locations per designated schedule and the specifications stated herein. The contractor shall meet the standards of the contract and comply with all local, state, and federal regulations. More frequent services may be required from May through September due to higher visitation volume.
B. The general location is 3545 Williamsburg Lane NW, Washington, DC 20008. The total number of sites requiring service under this contract will remain constant. However, the number and precise location of trash containers may vary slightly with visitor use patterns (+-5%). Such minor changes will not impact this contract agreement.
C. Equipment/Vehicles. All vehicles used in performance of the contract shall meet state regulations for safety and licensing. All equipment and vehicles used in performance of this contract shall be in good operable condition and meet local state and federal safety requirements.
D. Personnel. The contractor personal shall present a neat appearance and be easily recognized as contractor employees. The contractor shall ensure that all employees and/or subcontractors have current licenses for the appropriate vehicle. The contractor’s vehicles shall be maintained with current and proper state inspection and registration.
E. Traffic laws. The contractor and their employees shall comply with traffic regulations which comply with federal law.
F. The contract period shall be from the date of award for one year, with an option for 4 (12month) additional years.
G. Inclement Weather Schedule. The contractor shall perform refuse collection and emptying of trash cans during periods of inclement weather.
In cases of severe weather the contracting office may authorize exceptions.
When exceptions are granted the contractor shall make all missed collections within 24 hours after the severe weather has terminated, unless the contracting officer authorizes additional time.
H. Refuse Collection During High Winds. During times when wind speeds exceed 75 mph, the contractor shall delay refuse collection until the high winds subside or decrease to below 30 mph. The contractor shall make every effort to collect refuse the same day or before 10:00 am the next duty day.
I. The contractor shall not subcontract any work required by this contract without the express written approval of the Contracting Officer (CO). If the Contracting Officer approves the Contractor to subcontract any part of the work required under this contract, a copy of any such contract shall be provided to the Contracting Officer.
PART 2: GENERAL PROVISIONS
A. Each trash container will be completely emptied within the scheduled timeframe, no matter how full it is. The container will receive a new “trash bag” PVC liner each time it is emptied. These bags will be clear in color.
The contractor shall be required to perform general housekeeping duties around the trash cans to ensure the area is maintained in a clean and neat manner at all times.
B Litter will be defined as any manmade material, not purposely placed in the park by the park service, which detracts from the visual quality of the park. Litter may include, but is not limited to, paper, plastic, metal, tires, household trash, glass, cans, food, pet waste, personal effects, yard waste from the community, batteries, pipe, lumber, etc. Litter will be removed from all open areas owned by the National Park Service (NPS), and into any adjoining wooded areas owned by the NPS, for a distance of 20 feet.
*Removal of fallen branches from Park trees is not part of this scope of work.
C. Disposal of household “non-park” trash which has been left at or near a designated trash collection site will be the responsibility of the contractor. "Hazardous type" waste will be brought to the Rock Creek Maintenance Yard by the Contractor and placed in the holding area, designated by the COR, for disposal by Rock Creek Park.
D. Contractor will dispose of all trash and debris collected under this contract at the Rock Creek Maintenance Facility in a Rock Creek Trash container
E. Contractor vehicles shall not be allowed inside Montrose Park, Rose Park or Meridian Hill Park. Trash and litter must be collected and brought to the edge of these parks for pick-up.
F. Contractor will report any damaged or vandalized trash cans needing repair or replacement to the COR.
G. The Contractor shall keep all equipment and vehicles in good repair including frequent cleaning of trash hauling vehicles. Such cleaning shall not take place on Park property.
H. The Contractor must insure that trash truck cargo is properly secured to prevent debris from blowing or falling on city streets or park property, this includes liquids.
I. The Contractor shall install a “Sharps” container on each trash truck for the proper disposal of any drug paraphernalia encountered.
J. Each trash truck will have a minimum crew of two.
K. Trash hauling vehicles shall not be left in the park when not in use.
L. All contractor employees shall wear matching uniform clothing with the Contractor’s name or logo prominently displayed. All vehicles shall also be identified with the company logo or name.
M. All vehicles used by the contractor will be provided a vehicle permit. This permit must be displayed on the dash of the vehicle while in the Park.
Contractor shall comply with all applicable District of Columbia and Federal environmental regulations related to solid waste handling, recycling, and disposal, including spill prevention and reporting requirements.
PART 3: REPORTS
A. The contractor shall maintain a daily work log using a form furnished by the COR. At a minimum, this form will require the date, location, task performed, dump time, and tonnage (or approximate volume) dumped. It will have signature blocks for the Contractor (or his representative) and the COR. This along with a COR approved invoice will become a record of work acceptance. The Contractor should maintain a copy signed by the COR for his records.
B. The Contractor shall note, and report to the COR immediately, any abnormality which might reflect upon his work, accident or incidents, or anything which might prevent him from performing any part of the agreed upon work.
C. The Contractor must report any accident or incident on Park property to the United States Park Police and the COR.
D. Any negative contacts with Park visitors, without regard to culpability, must be reported to the COR immediately.
PART 4: SCHEDULING AND COORDINATION
A. Work shall be performed between the hours of 6:30 AM and 3:00 PM Monday through Friday and from 12:00 Noon until completion on Saturday and Sunday. The Saturday and Sunday schedule shall start on the first weekend in May and run through the last weekend in September.
Federal Holidays shall be included as work days during May through September. Work outside these scheduled hours must be approved in writing by the COR.
B. The Contractor, in accomplishing his task, must make allowances for work being performed by Park Employees, other Contractors, or events being held in the park by the Public.
C. At all times, Park Visitors must be treated with the utmost courtesy and consideration, especially regarding the matter of safety.
D. Allowances must be made for rush hour traffic patterns, one way streets, narrow streets, low overhangs, and parking problems in some areas.
PART 5: SAFETY
A. Safety Plan. The Contractor shall submit and have approved before starting work a company safety plan that ensures that employees trained to meet all Federal, State, and local regulation, i.e. OSHA regulations related which exhibits on-going safety education, hazard recognition, personal protective equipment to be used by employees, vehicle maintenance and inspections, and a plan of action for any injuries suffered by employees in the performance of their duties.
B. Quality Control. The Contractor shall develop and maintain a quality control program that ensures refuse collection will be performed in accordance with these specifications. The Contractor shall develop and implement procedures to track, identify, prevent, remedy and ensure non-recurrence of defective services. The contractor shall provide a method to accept and resolve customer complaints and notify the customer of the resolution. The contractor shall immediately notify the COR upon receipt of a customer complaint so joint validation may be accomplished. The contractor is responsible for quality control and specification compliance.
The QCP shall be submitted no later than (NLT) the pre-performance conference.
C. Quality Assurance. The Government QA will evaluate the contractor's performance using a combination of 100% inspections and periodic on-site inspections.
D. Re-performance of Service. When service performed does not conform to contract requirements, or when service was not performed in a specific area, the contractor shall perform or re-perform the service in conformity with contract specifications at no additional cost to the government.
Performance or re-performance of these services shall commence immediately upon notification by the contracting officer’s representative and the contractor shall have a sufficient workforce dedicated to insure corrections are accomplished that day or by noon the next work day without degradation to normal services.
E. No vehicle used for trash removal may back up without an employee at the rear of the vehicle for guidance.
F. Each of the Contractor’s employees shall wear an OSHA approved fluorescent safety vest at all times.
G. Each trash hauling vehicle shall be equipped with a back-up alarm, an amber lens revolving light visible from all directions, and a fluorescent orange center-triangle slow moving vehicle symbol mounted on the rear.
All vehicles must meet federal OSHA, state and local safety and permit requirements.
PART 6: RESPONSIBILITY REGARDING EXISTING STRUCTURES,
UTILITIES, PLANT MATERIAL, AND LANDSCAPE FEATURES.
A. The Contractor will be held responsible for damage incurred by him, or his employees, to any Park property or feature whatsoever. This will include turf, trees, shrubs, utilities, buildings, etc. Any damage suffered as a result of the Contractor’s operations shall be restored, replaced, repaired, or paid for as determined by the COR and the best interest of the Park.
PART 7: ADJUSTMENT FOR INADEQUATE PERFORMANCE
A. Clean and well maintained areas for the enjoyment of our visitors is a central goal of the National Park Service. In response to substandard performance, invoking the deduction provision for work omitted, or improperly done, is designed to protect NPS interest, it is not a desirable substitute for accomplishing the job through the normal process. It is designed only to assure that the Park Service pays only for services provided and is fairly compensated for damages which result from lack of performance, or inadequate performance. It should be noted that time is of the essence in the performance of this contract. The attached QASP QUALITY ASSURANCE SURVEILLANCE PLAN provides more detail in qualifying performance.
B. Failure to perform the required services, as indicated in the specifications, herein, constitutes a deficiency. All work will be regularly inspected by the COR and any deficiencies will be reported, in writing, to the Contractor. The COR will make the sole determination as to the existence of a deficiency in performance. Corrective action, by the Contractor, shall be taken promptly and the work satisfactorily accomplished. Deficiencies shall be addressed in the day they are noted, when practical. Under all other circumstances, deficiencies shall be corrected within 24 hours of notification. If the deficiencies are of a nature which preclude a satisfactory correction within the specified time frame, no further opportunity will be provided to the contractor to cure the deficiencies and the provision for monetary adjustment will apply.
C. In the event The Contractor fails to correct a deficiency within the specified time frame, The National Park Service has the right to obtain performance of the deficient task from some other source or the in-house work force. The cost of such performance, and any other additional cost incurred to The Park Service as a result of such actions, shall be charged to the Contractor. In the alternative, at the discretion of the COR, the contract may be terminated upon ten(10) days notice in writing to the Contractor, if the deficiency is determined to warrant such action.
PART 8: ACCEPTANCE, MEASUREMENT AND PAYMENT
A. The Contractor shall include with all invoices for payment, an acceptance report signed by the COR. Failure to obtain a signed acceptance report will release the Government from any obligation to pay for services claimed, but not documented by a signed acceptance report. The Contractor shall include copies of his work log (see 3A above), signed by the COR, for that month, with said invoice. Failure to include signed copies of said work log, which constitute an acceptance report, will release the Government from any obligation to pay for services claimed, but not documented by a signed acceptance report. A copy of the invoice shall also be given or sent to the COR.
B. Invoices accompanied by acceptance reports that have been signed by the COR shall be submitted by the Contractor through the Internet Payment Platform (IPP) System at HTTP://WWW/IPP.GOV.
C. The amount to be paid will be based on the actual items completed and accepted. Quantities so measured will be paid for at the specified price. Invoices must reflect the same unit description, and unit price as the original Quote proposal.
http://www/IPP.GOV
TRASH AND LITTER REMOVAL PALISADES AREA ROCK CREEK PARK
NUMBER
LOCATION Res. # #CANS MON TUE WED THRS FRI SAT SUN Little Forest 668 2 T/L L T/L L T/L
Chevy Chase Circle
335A L L
Ft. Bayard 359 4 T/L L T/L L T/L
Ft. Reno 470 &
10 T/L L T/L L T/L T/L* T/L*
Reno Rd. & Davenport
515 1 T/L T/L T/L T/L T/L T/L* T/L*
Tenley Circle 399 4 T/L T/L T/L T/L T/L T/L* T/L*
36th & Conn. Ave @ Ellicott
397 2 T/L T/L T/L
40th Between Tenley & Wilson
398 L L
Van Ness Triangles
398 4 T/L T/L T/L
Channel 9/ Glover Archbold
351J 2 T/L T/L T/L
Bryce Park 700 4 T/L T/L T/L
Mass. Ave. & McComb
351K 3 T/L T/L T/L
Ward Circle 572 L L
New Mexico & Garfield
351C 2 T/L L T/L L T/L
42nd & Cathedral 351B 2 T/L T/L T/L
Nebraska House
4 T/L L T/L L T/L
Battery Kimble 530 &
9 T/L L T/L L T/L
Conduit School 404 4 T/L L T/L L T/L
Center for Urban Ecology (CUE)
404 9 T/L T/L T/L
Canal Road 404 L L
37th & Whitehaven
357 2 T/L L T/L L T/L
35th & Whitehaven
357 2 T/L L T/L L T/L
Montrose Park 324 22 T/L T/L T/L T/L T/L T/L* T/L* W St. Alley 357 5 T/L T/L T/L
Dunbarton Oaks 637 1 T/L T/L T/L T/L T/L T/L* T/L*
Old Stone House 693 3 T/L T/L T/L T/L T/L T/L* T/L*
Francis Scott Key Park I&II
404 6 T/L T/L T/L T/L T/L T/L* T/L*
23rd & Q Streets 57, 57D, 3 T/L L T/L L T/L
L = Litter Removal Service Only T/L = Both Trash Service and Litter Removal Service T/L* = Both Trash Service and Litter Removal Service weekends May 1 Through September 30
24th & Mass Ave Emmet Statue
302 1 T/L L T/L L T/L
P Street 360 3 T/L T/L T/L T/L T/L T/L* T/L* P Street Beach 360 9 T/L T/L T/L T/L T/L T/L* T/L* Rose Park 360 11 T/L T/L T/L T/L T/L T/L* T/L* 26 & M 360 5 T/L T/L T/L
28th & M 360 3 T/L L T/L L T/L
Penn Ave. Ramp 360 2 T/L L T/L L T/L
23rd & O Sts. 360 0 L L
Glover Archbold n/o Reservoir
404, 450A
2 T/L L T/L L T/L
3411 Water Street 404 1 T/L L T/L L T/L
Thompson Boat Center Parking Lot
360 7 T/L T/L T/L T/L T/L T/L* T/L*
Kalorama Circle 303 1 T/L L T/L L T/L
Melvin Hazen (3701 Conn)
630 3 T/L L T/L L T/L
Melvin Hazen Sedgwick Gardens
630 1 T/L L T/L L T/L
Woodly Park Playground
635 3 T/L L T/L L T/L
44th & Reservoir Road
450A 3 L L
Allen Playground 360 6 T/L T/L T/L T/L T/L T/L* T/L*
Meridian Hill Park
327 47 T/L* T/L*
Westmoreland Circle
L
Normanstone Parkway/Kahlil Gibran
351A
351K
450A
529529
351J
450B
351I
351F
351E
351C
351H
450A
351B
351G
351H
351J
351K
351D
351K
351K
330C
351K 351K
351K
FOXHALL RD
WISCONSIN AVE
MACARTHUR BLVD
RESERVOIR RD
ARIZO
NA AV
E
LOUGHBORO RD
NEBRASKA AVE
MASSACHUSETTS AVE
RESERVOIR RD
MASSACHUSETTS AVE
Rock Creek Park Washington DC
Palisades South
Produced by Rock Creek Park July 2012
National Park Service U.S. Department of the Interior
0 0.25 0.5 0.75 10.125
Miles
Legend Roads Water Rock Creek Park
351K
351J
351I
515 515
351F351E
356351H
356 356
330B
351G
335A
351H
351J
351K
330C
351K
326C
351K
351D
351K
351K
WISCONSIN AVE
CONNECTICUT AVE
MILITARY RD
RIVER RD
MASSACHUSETTS AVE
NEBRASKA AVE
ARIZO
NA AV
E FOXHALL RD
MASSACHUSETTS AVE
NE
BR
AS
KA
AV
E
Rock Creek Park Washington DC
Palisades North
Produced by Rock Creek Park July 2012
Legend DC/Maryland Line Roads Water Rock Creek Park
309C
309B
309A
303A
303D
303B
K ST
TH
ST
CONNECTICUT AVE
WISCONSIN AVE
MASSACHUSETTS AVE
WHITEHURST FWY
NEW
HAM
PS
HIRE A
VE
RESERVOIR RD
MASSACHUSETTS AVECONNECTICUT AVE
MASSACHUSETTS AVE
NEW
HAM
PS
HIRE A
VE
NEW
HAM
PS
HIRE A
VE
Rock Creek Park Washington DC
Palisades East
Produced by Rock Creek Park July 2012
Legend Roads Water Rock Creek Park
| SANITATION PALASIDES AREA ROCK CREEK PARK |
| PWS |
| PART 2: GENERAL PROVISIONS |
| PART 3: REPORTS |
| PART 4: SCHEDULING AND COORDINATION |
| PART 5: SAFETY |
| PART 6: RESPONSIBILITY REGARDING EXISTING STRUCTURES, UTILITIES, PLANT MATERIAL, AND LANDSCAPE FEATURES. |
| PART 7: ADJUSTMENT FOR INADEQUATE PERFORMANCE |
| PART 8: ACCEPTANCE, MEASUREMENT AND PAYMENT |
| Palisades South |
| National Park Service |
| Palisades North |
| National Park Service |
| Legend |
| Palisades East |
| National Park Service |
File details come from the government source that posted it. Updated .