Pavement Marking Paint 02765 – Page 1 of 9

January 1, 2017

SECTION 02765

PAVEMENT MARKING PAINT

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Furnish acrylic water-based pavement marking paint. Refer to this Section, Article 2.2 for resin requirement.

B. Apply to hot mix asphalt or portland cement concrete pavement as longitudinal lines, transverse markings, contrast lines, and other related markings.

C. Remove pavement markings.

1.2 RELATED SECTIONS Not Used

1.3 REFERENCES

A. AASHTO M 247: Glass Beads Used in Traffic Paints

B. ASTM D 562: Consistency of Paints Measuring Krebs Unit (KU) Viscosity Using a Stormer-Type Viscometer

C. ASTM D 1155: Roundness of Glass Spheres

D. ASTM D 1475: Density of Liquid Coatings, Inks, and Related Products

E. ASTM D 1644: Nonvolatile Content of Varnishes

F. ASTM D 2205: Selection of Tests for Traffic Paints

G. ASTM D 2743: Traffic Paint Vehicle Solids by Spectroscopy and Gas Chromatography

H. ASTM D 2805: Hiding Power of Paints by Reflectometry

I. ASTM D 3723: Pigment Content of Water-Emulsion Paints by Low- Temperature Ashing

J. ASTM D 3960: Determining Volatile Organic Compound (VOC) Content of Paints and Related Coatings

Implementation 01-09-2017

02765 – Page 2 of 9

January 1, 2017

K. ASTM D 5381: X-Ray Fluorescence (XRF) Spectroscopy of Pigments and Extenders

L. ASTM E 1347: Color and Color-Difference Measurement by Tristimulus (Filter) Colorimetry

M. Environmental Protection Agency Testing Methods

N. Federal Specification

O. Federal Standards

P. Manual on Uniform Traffic Control Devices (MUTCD)

Q. UDOT Materials Manual of Instruction

R. UDOT Minimum Sampling and Testing Requirements

S. UDOT Quality Management Plans

1.4 DEFINITIONS

A. Longitudinal Markings – pavement markings that are generally placed parallel and adjacent to the flow of traffic such as lane lines, center lines, edge lines, channelizing lines, and others.

B. Transverse Markings – pavement markings that are generally placed perpendicular and across the flow of traffic such as shoulder markings;

word, symbol, and arrow markings; stop lines; crosswalk lines; speed measurement markings; parking space markings; and others.

C. Long-term stationary – work that occupies a location more than 3 days.

1.5 SUBMITTALS

A. Documentation of the manufacturer and production batch identification for the paint used.

1.6 ACCEPTANCE

A. Provide fixtures such as ball valves, gate valves, or others on paint truck for the purposes of obtaining field samples.

02765 – Page 3 of 9

January 1, 2017

B. The Department will:

1. Accept pavement marking paint from qualified manufacturer supplied samples.

2. Sample from the applicator’s yard, at the Department’s discretion for acceptance.

C. Stop all agitation before sample is drawn.

D. The Engineer will:

1. Visually inspect longitudinal lines and transverse markings to verify compliance with the required dimensions.

2. Inspect at the end of each production day or more frequently as required.

3. Verify quantities applied by either of the following methods:

a. Measuring both paint and bead tanks before and after application.

b. Witnessing the meter readings before and after application.

1) A printout of meter readings instead of witnessing may be accepted at the Engineer’s discretion.

4. Sample in the field according to the UDOT Quality Management

Plan 513, Pavement Marking Paint and the UDOT Minimum Sampling and Testing Requirements.

E. Repaint any line or legend failing to meet bead application rates and dimensional requirements.

1. Do not remove earlier application.

F. Price Reductions

1. Price reductions for pavement markings installed below the specified wet mil thickness are outlined in Table 1.

Table 1 Price Reduction for Wet Mil Thickness

Pay Factor Less than 2 percent below the specified mil thickness 1.00 Less than10 percent below the Specified wet mil thickness 0.75 Less than15 percent below the Specified wet mil thickness 0.50 15 percent or more below the Specified wet mil thickness 0.00 *

* Repaint pavement markings at no cost to the Department. Do not remove earlier application.

02765 – Page 4 of 9

January 1, 2017

2. The Department will apply price reductions for applied pavement markings that do not meet the requirements of Table 4 when the batch is sampled at the applicator’s yard for quality verification according to UDOT Quality Management Plan 513, Pavement Marking Paint.

a. Apply the lowest pay factor from Tables 2 and 3.

3. The Department will require repainting for pavement markings more than five percentage points below total solids, pigment, or non-volatile vehicle properties from Table 4 when the project is sampled for quality verification according to Minimum Sampling and Testing Requirements.

Table 2 Price Reduction for Total Solids, Pigment and Non-Volatile Vehicle

Pay Factor Less than 0.5 percent below or above the specified percentage 1.00 Less than 1.0 percent below the specified percentage 0.95 Less than 2.0 percent below the specified percentage 0.85

2.0 percent or more below the specified percentage 0.00 *

* Repaint pavement markings at no cost to the Department. Do not remove earlier application.

Table 3 Price Reductions for remaining requirements of Table 4

Pay Factor Less than 0.2 percent deficient 1.00 Less than1 percent deficient 0.90 Less than 2 percent deficient 0.80 Less than 3 percent deficient 0.70 Less than 4 percent deficient 0.60 Less than 5 percent deficient 0.50 5 percent or more below specified quantitative requirements 0.00 *

* Repaint pavement markings at no cost to the Department. Do not remove earlier application.

02765 – Page 5 of 9

January 1, 2017

PART 2 PRODUCTS

2.1 PAINT

A. Meet the requirements for Acrylic Water Based Paint specified in Table 4.

Table 4 Paint Requirements

Property White Yellow Black Test Pigment – Percent by weight, minimum

62.0 62.0 62.0 ASTM D 3723

Total Solids – Percent by weight, minimum

77.0 77.0 77.0 ASTM D 1644

Nonvolatile vehicle – Percent by weight vehicle, minimum*

43.0 43.0 43.0

ASTM D 3723

ASTM D 1644

Viscosity, KU @ 77 degrees F

80 – 95 80 – 95 80 – 95 ASTM D 562

Density, lb/gal, minimum 14.0 14.0 14.0 ASTM D 1475 Volatile Organic Content (VOC) – g/L, maximum

100 100 100 ASTM D 3960

Titanium Dioxide Content, lb/gal

1.0 min 0.2 max N/A ASTM D 5381

Color Definition 37875 33538 N/A

Federal Standard 595B

Directional Reflectance Minimum

90.0 50.0 N/A ASTM E 1347

Dry Opacity – Minimum (5 mils wet)

0.95 0.95 N/A ASTM D 2805

* Binder – 100 percent acrylic cross-linking polymer, by weight, as determined by infrared analysis and other chemical analysis available to the Department. Refer to ASTM D 2205.

B. No-Pick-Up Time

1. Paint may not smear or track three minutes after application to the roadway using standard application equipment, at the mil thickness required, and with an ambient shaded temperature of at least 50 degrees F.

C. Additional Requirements

1. Free of lead, chromium, or other related heavy metals. Refer to

ASTM D 5381.

2. Refer to ASTM D 2743 and ASTM D 5381 for tests used to verify paint samples meet ASTM requirements.

02765 – Page 6 of 9

January 1, 2017

2.2 GLASS SPHERES (BEADS) USED IN PAVEMENT MARKING PAINT

A. Heavy metal concentration: Manufacturer must provide a certificate of compliance stating that all beads contain no more than the amounts listed for the following materials as determined by testing performed according to EPA test methods 3052 and 6010C.

1. Other suitable x-ray fluorescence spectrometry analysis methods may be used to screen samples of glass spheres for arsenic, antimony and lead content.

Table 5 Heavy Metal Materials

Material Level (ppm, total) Arsenic 200

Antimony 200 Lead 200

B. Longitudinal Lines – Refer to AASHTO M 247, Specific Properties, with the following exceptions:

1. Gradation:

Table 6 Gradation

Sieve Size Accumulated Percent Passing No. 18 65 – 80 No. 30 30 – 50 No. 50 0 – 5

2. Coating – Dual coating for optimum adhesion and embedment.

3. Roundness – 80 percent true spheres below the number 30 sieve.

Refer to ASTM D 1155

4. Color/Clarity – Colorless/clear and free of carbon residue.

5. Refractive Index – Minimum 1.51 by oil immersion method.

6. Air Inclusions – Less than 5 percent by visual inspection.

7. Hardness – Beads above the number 30 sieve exhibit an average hardness of C70.5 when measured using the Rockwell C scale method and using a minimum sample of 100 beads.

8. Crushing Strength – Beads above the number 30 sieve exhibit an average crushing strength of 60,000 psi when measured by the L/D2 method and with a minimum sample of 100 beads.

9. Chemical Resistance – Beads resistant to hydrochloric acid, water, calcium chloride, and sodium sulfide. TT-B Federal Specification 1325C sections 4.3.6 to 4.3.9.

02765 – Page 7 of 9

January 1, 2017

C. Transverse Markings – Refer to AASHTO M 247, Specific Properties, with the following exceptions:

1. Gradation:

Table 7 Gradation

Sieve Size Accumulated Percent Passing No. 20 90 – 95 No. 30 45 – 70 No. 50 5 – 25 No. 80 0 – 5

2. Coating – Dual coating for optimum adhesion and embedment.

3. Roundness – The glass beads will have at least 75 percent true spheres.

4. Refractive index – Minimum 1.51 by oil immersion method.

5. Air Inclusions – Less than 10 percent by visual inspection.

6. Have at least 80 percent true spheres.

D. Beads used in Temporary Pavement Markings. Meet the above or AASHTO M 247 Type II uniform gradation.

PART 3 EXECUTION

3.1 PREPARATION

A. Line Control

1. Establish control points at 100 ft intervals on tangent and at 50 ft intervals on curves.

2. Maintain the line within 2 inches of the established control points and mark the roadway between control points as needed.

a. Remove paint that is not placed within tolerance of the established control points and replace. Refer to this Section, Article 3.4.

b. Maintain the line dimension within 10 percent of the width and length dimensions defined in Standard Drawings.

B. Remove dirt, loose aggregate, curing compounds, and other foreign material and follow manufacturer’s recommendations for surface preparation.

3.2 APPLICATION

A. Use Qualified Applicators as identified in UDOT Quality Management Plan 513, Pavement Marking Paint.

02765 – Page 8 of 9

January 1, 2017

B. Apply Pavement marking paint at the following wet mil thickness:

1. 20-25 wet mils for all longitudinal markings.

2. Approximate application rate for required mil thickness requirements:

a. 4 inch Solid Line – From 190 to 240 ft/gal

b. 4 inch Broken Line – From 760 to 960 ft/gal

c. 8 inch Solid Line – From 95 to 120 ft/gal. Use the following calculation to determine wet mil thickness if approximation is outside the range for the desired line type.

Calculation – Determine wet mil thickness

4 inch Solid Line – Wet mils = 4812.516 ft3/gal mil/ft X ft/gal

4 inch Broken Line – Wet mils = 19250.064 ft3/gal mil/ft X ft/gal

8 inch Solid Line – Wet mils = 2406.258 ft3/gal mil/ft X ft/gal

Where:

X = application rate. (Meter readings or dipping tanks).

C. Refer to Table 1 for price reduction of pavement markings that are less than required wet mils in thickness.

D. No additional payment for pavement markings placed in excess of required wet mils in thickness or exceeding dimensional requirements outlined in this Section, Article 3.2 paragraph B.

E. Glass Sphere (Beads) – Apply at least 8 lb/gal of paint, the full length and width of line and pavement markings.

1. Calibrate bead guns and measure bead distribution according to

UDOT Materials Manual of Instruction 932, Procedure for Sampling and Accepting Pavement Marking Paint and Beads.

2. Do not apply glass beads to contrast lines (black paint).

F. Begin striping operations no later than 24 hours after notification by the Engineer.

1. Apply two applications on new bituminous surfaces.

a. Verify timing of second application with the Engineer.

02765 – Page 9 of 9

January 1, 2017

G. Apply lines and pavement markings only when the air and pavement temperature are:

1. 50 degrees F and rising for Acrylic Water Based Paint.

a. Non-grooved lines and markings applied at temperatures below 50 degrees F are temporary and must be repainted, when temperature conditions are met.

1) Do not remove earlier application.

b. Grooved lines and markings applied below 50 degrees F must be removed and reapplied when temperature conditions are met.

H. Comply with TC Series Standard Drawings.

3.3 CONTRACTOR QUALITY CONTROL

A. Adhere to the requirements of UDOT Quality Management Plan 513, Pavement Marking Paint

3.4 REMOVE PAVEMENT MARKINGS

A. Use equipment specifically designed for removal of pavement marking material.

B. Use one of these removal methods

1. High pressure water spray

2. Sand blasting

3. Shot blasting

C. Do not use grinding without approval from the Engineer.

1. The Engineer will consult with the Region Traffic Operations

Engineer before issuing approval.

D. Do not eliminate or obscure existing striping, instead of removal, by covering with black paint or any other covering.

1. The Engineer may approval for use of black paint or other obscuring material prior to installation for work durations shorter than “long term stationary” as defined in this Section, Article 1.4 and in the Temporary Traffic Control section of the MUTCD.

END OF SECTION