This is a Request for Quotation (RFQ) for soil and groundwater investigation services at Kodiak National Wildlife Refuge in Alaska, issued by the U.S. Fish and Wildlife Service.
The solicitation (140FS126Q0063) seeks a firm-fixed-price contract for contaminated site assessment and remediation planning at the Kodiak NWR Triplex property located at 512 Mill Bay Road. The requirement spans from May 1, 2026, to December 31, 2026, with quotes due April 6, 2026, at 1:00 PM Central Time. Three contract line items are offered: (1) Soil & Groundwater Investigation per the Statement of Work (lump sum); (2) Installation of additional groundwater wells as needed (per well, option item with 90-day anticipated exercise date); and (3) Additional treatment of contaminated groundwater as needed (per 55-gallon unit, option item with 90-day anticipated exercise date). Award will be made to the responsive, responsible small business source offering the lowest price that meets technical acceptability criteria. Technical evaluation is on a pass/fail basis requiring offerors to demonstrate qualification as an ADEC-qualified environmental professional per 18 AAC 75.33, relevant contaminated site investigation experience, ability to complete all Statement of Work tasks, capability to finish by September 30, 2026, and competency performing work in remote Alaskan areas. The work includes site reconnaissance, soil boring sample collection (minimum 12 samples), groundwater well installation (minimum 3 wells), free product recovery, contaminated media disposal, site characterization reporting, and a corrective action completion report evaluating remediation alternatives. The NAICS code is 562910 with a size standard of $25 million. This is a women-owned small business (WOSB) set-aside. Contractor must be registered in SAM with active status and no exclusions, maintain an active SAM registration throughout contract performance, and provide a Taxpayer Identification Number. Payment will be made electronically through the Invoice Processing Platform (IPP). Service Contract Labor Standards apply with prevailing wage rates specified for Alaska Kodiak Island area occupations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3.AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
. YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.
FAR 52.212-3 AND 52.212-5 ARE ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
DATED.
OFFER
ADDENDA
ADDENDA
140FS126Q0063
See Schedule See Schedule
FWS SAT 1
FWS, SAT Team 1 5275 Leesburg Pike Falls Church VA 22041
04/06/2026 1300 CD
0044038943
Tanner Frank 0000000000
FS1 100.00
FS1
Joshua Stuart
562910
$25
03/17/2026
0011280545
ADMINISTERED BY:
FWS SAT 1
FWS, SAT Team 1
5275 Leesburg Pike
Falls Church VA 22041 US
DELIVER TO:
Continued...
STOCK RECORD (S/R)
STANDARD FORM 1449 (REV. 11/2021) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
ACCEPTED,
FWS KODIAK ADMINISTRATIVE SITE
C/O KODIAK NWR
1390 BUSKIN RIVER ROAD
KODIAK AK 99615-6899 US
Please read the entire Request for Quotation
(RFQ) and all attachments prior to submitting quote.
This is a Firm-Fixed Price Contract. All responsible small business sources may submit a quote, which shall be considered by the agency.
The basis of award is best value, determined by consideration of price first and other factors described on the following page will result in the selection of the quote most beneficial to the government. Award will be made to a responsible source pursuant to FAR subpart
9.1.
This is a solicitation for commercial supplies/services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, and the number is 140FS126Q0063.
The solicitation document and incorporated provisions and clauses are those in effect through the Federal Acquisition Circular. The
NAICS code is 562910 and a PSC of F108. This requirement is in accordance with FAR Part 12, CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
Acquisition of Commercial Items, and award will be pursuant to FAR Part 13.
Complete the SF¿1449 (and any Amendments thereto), filled out Bid Schedule, your Unique
Entity ID assigned by SAM.gov
(https://sam.gov), and valid email address. In order to have a quote considered, prospective offerors must have an Active SAM Registration with no listed exception.
Submit all offers via email to Tanner Frank:
Tanner_Frank@IOS.DOI.gov
Telephone calls not accepted.
Request for Information: RFI¿s will be accepted until Friday, March 27 at 10:00 AM Central Time via email. Submit RFI to
Tanner_Frank@IOS.DOI.gov.
NOTICE TO PROSPECTIVE CONTRACTORS: If
Sub¿contractors will perform on this project, the Prime contractor must upon request provide subcontractor information, i.e., company name, supervisor name and contact information and valid email address and telephone number.
Failure to do so could result in the quote being considered non¿responsible and ineligible for award.
Quotes Due: Monday, April 6 at 1:00 PM Central
Time
Period of Performance: 05/01/2026 to
12/31/2026
00010 Soil & Groundwater Investigation IAW SOW
Delivery: 12/31/2026
00020 Installation of additional groundwater wells
(As Needed)
(Option Line Item)
Anticipated Exercise Date 90
Delivery: 12/31/2026
00030 Additional treatment of contaminated groundwater
(As Needed)
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
(Option Line Item)
Anticipated Exercise Date 90
Delivery: 12/31/2026
OFFER EVALUATION INFORMATION
RFI Due: March 26, 2026 at 10:00 AM Central Time Quotes Due: April 3, 2026 at 1:00 PM Central Time Submission: Email to Tanner_Frank@ios.doi.gov Format: Email required documents as three individual PDF files; SF-1449, Bid Schedule, and Technical Submission. Email must contain Solicitation # in the subject line.
REQUIRED SUBMISSION DOCUMENTS
• SF-1449: Completed and signed (Blocks 30a–30c)
• Bid Schedule: Completed pricing for CLINs 0001–0003.
• Technical Submission: Documentation demonstrating qualifications required by the Statement of Work, including ADEC Qualified Environmental Professional requirements (18 AAC 75.33), certifications, and relevant experience.
TECHNICAL EVALUATION – BEST VALUE
1. BEST VALUE TRADEOFF – PRICE FIRST
This acquisition uses a Best Value Tradeoff method in which price is the primary factor.
After ranking quotes from lowest to highest price, the Government will evaluate:
• Required Qualifications
• Technical Approach
• Past Performance
2. Technical Acceptability (Pass/Fail) Technical acceptability will be evaluated on a Pass/Fail basis. To receive a “Pass,” the offeror must:
• Demonstrate qualification as an ADEC-qualified environmental professional under 18 AAC 75.33.
• Provide documentation of relevant experience performing contaminated site investigations involving soil and groundwater characterization.
• Confirm the ability to perform all tasks required in the Statement of Work
• Confirm the ability to complete all work by September 30, 2026.
• Confirm the ability to perform work in remote Alaskan areas, including remote-site logistics.
Failure to provide required technical information or meet all Pass/Fail criteria will result in a rating of “Fail” and removal from further consideration.
BID SCHEDULE
Soils and Ground Water Survey
KODIAK NATIONAL WILDLIFE REFUGE (NWR)
CLIN Description Unit Unit Price Total Price
0001 Soil & Groundwater Investigation
IAW SOW
Lump Sum $ $
Option
Installation of additional groundwater wells (As Needed)
Per well
Option
Additional treatment of contaminated groundwater (As Needed)
Per 55 Gal
Total Quoted Price : $
Notes:
The price for CLIN 0001 shall include all labor, travel, sampling, drilling, well installation, analysis, disposal, overhead, and any other costs necessary to complete the full Statement of Work. No separate reimbursement for travel or direct costs will be made unless specifically authorized by the Contracting Officer.
Vendor Information:
Company Name:
SAM.gov UEI:
Valid Email Address:
Confirmation of Active SAM Registration (no exclusions): Yes □ No □
Confirmation Vendor is an Alsakan qualified environmental professional who meets the regulatory requirements described in 18 AAC 75.33 : Yes □ No □
U.S. FISH AND WILDLIFE SERVICE REGION 7-ALASKA
KODIAK NATIONAL WILDLIFE REFUGE (NWR)
Soil and Groundwater SURVEY FOR TRIPLEX
STATEMENT OF WORK
U.S. FISH AND WILDLIFE SERVICE
LEGACY REGION 7 ALASKA
GENERAL
BACKGROUND:
The Kodiak NWR Triplex is located at 512 Mill Bay Road. This is Section 32 of the Seward Meridian, Township 27 South, Range 19 West as shown on the USGS Kodiak (D-2) Southeast quadrangle, Alaska, 1:25,000 series, topographic map, dated 1987. Lot information - USS 2538A LT 6C EAST REZANOF.
A site reconnaissance visit is encouraged to be conducted in a proven systematic and detailed approach suitable for the subject property's size and/or complexity. Current property and adjoining property conditions will be documented. Identify areas of concern such as odors, stained soil or pavement, stressed vegetation, pools of liquids, drums, unidentified containers, electric or hydraulic equipment, solid waste, wells or septic systems. In addition, any indication of similar conditions from past use of the property or adjoining properties will be recorded. Visual and physical geologic, hydro geologic, hydrologic and topographic characteristics of the property and adjoining properties will be noted for the potential of migration of contaminants. As appropriate, additional site visit information shall include as applicable, a general description of the structures, roads, potable water supply, and sewage disposal system.
Interviews with government workers or other approved persons shall be conducted in person and documented, by email or memo. The contractor shall work closely with the site representative for any questions about the use and physical characteristics of the property. Appropriate local government officials may also be interviewed to obtain the necessary information. The contractor shall keep detailed notes of all interviews. These notes shall become the sole property of the
USFWS.
CONTRACTOR QUALIFICATIONS:
Contractor experience must be approved by the Contracting Officer and will be based upon submission of the following information by the Contractor: Experience: Name and location of a similar project completed by the Contractor, including the name and telephone number of the purchaser of the services. Comply with ADEC regulations and applicable requirements of USEPA, ADEC, OSFM, and OSHA regulation. Contractor shall be a “qualified environmental professional who meets the regulatory requirements described in 18 AAC 75.33. Contractor shall have project experience with work of this nature, and his work crew shall have all necessary training and certifications.
CONFIDENTIALITY STATEMENT:
Contractor shall protect the confidentiality of all work accomplished under this scope of work. Quantity surveys and cost estimates shall remain the sole property of the USFWS and shall not be made available to others for any purpose. Do not publicly disclose any data generated for review under this contract. Attachments provided are sole property of the USFWS. Submittals and data generated under this contract shall become the property of the USFWS and distribution to any other source, unless authorized by the USFWS, is prohibited. Direct any public inquiries to the Contracting Officer (CO), Contracting Officer Technical Representative (COTR) or the Refuge Representative. Do not divulge, explain, or share project information with anyone other than the government representatives above unless it is necessary to obtain permits, or clearances, etc.
WORK DESCRIPTION:
The purpose of this project is to provide all labor, resources, equipment, materials, permits, and services to delineate horizontal and vertical limits of the soil and groundwater contamination and provide a workplan, site characterization and Corrective Action Report based on previous sampling and sampling conducted during this investigation. The work to be accomplished is:
1) Identify if contamination has moved off site to the AT&T property. Review previous sampling of site and develop sampling plan to determine any vertical and horizontal contamination of the site. (Request Access – FWS has made contact with Property Owner – but has to work through legal) If permission to access site is denied sampling will be conducted as close to property line as possible on FWS Property.
2) Evaluate the surface water drainage located along the western property boundary to determine if this area has been adversely impacted by the groundwater contamination present on the subject project.
3) Delineate soil contamination vertical and lateral and identify amount of soil that needs to be removed and provide estimated cost for removal. A minimum of twelve (12) soil boring samples will be taken. Workplan will designate where soil boring samples will be taken and if multiple samples per boring will be analyzed.
4) Install groundwater wells to delineate groundwater contamination (a minimum of three wells will be installed) to the west, south, and east of Monitoring Wells MW-4, MW-5, and MW-6. Provide cost for installation of additional wells and sampling. If additional wells are required because of free product in wells or samples identified concentrations about groundwater standards. Workplan will designate where groundwater wells will be installed.
5) Sample groundwater well MW1 and MW2, if wells cannot be located re-establish wells (Note: Were dry during last investigation) and new groundwater wells.
6) Recover free product from MW3, MW4, MW5, and MW6 during site visit. If the wells run dry, let the wells recharge and measure free product levels again prior to collecting free product again. Note: All wells with free product shall be pumped to recover free product identified. Provide cost estimated to recover free product if new well is identified with free product.
7) Properly dispose of all soil boring soil that is contaminated, groundwater sampling water, and free product collected from wells.
8) Develop a Site Characterization Report incorporating previous reports and current data collected during this contract.
9) Develop a Corrective Action Completion Report (CACR) that discusses the cost and pros/cons of mitigating the site using active remediation, engineered barriers, institutional controls (Land Use Control Plan), or a combination of these methods. The contractor shall provide a final recommendation based on this evaluation.
Please refer to DEC’s Field Sampling Guidance October 2024 for a list of analyte testing, sampling procedures and methods, and preservation of samples required for soil and water samples. This document is available at https://dec.alaska.gov/spar/csp/guidance-forms/. This data is required to evaluate the site for closure in the future.
Use Appendix F of ADEC’s Field Sampling Guidance, the following analysis and methods should be conducted for soil and groundwater: GRO (AK101); DRO (AK102); BTEX (EPA Method 8021B or 8260D); PAHs (EPA Method 8260D, 8270E, 8310); VOCs (EPA Method 8021B, 8260D).
Use Section 12 - Quality Control (QC) Measures of the Field Sampling Guidance Quality Control (QC) Measures to meet the Minimum Quality Assurance (QA) Requirements for Sample Handling, Reports, and Laboratory Data. The QA guidelines described in this memorandum are necessary to meet the requirements of 18 AAC 75.335; 75.360(2); and 18
AAC 78.007.
A Laboratory Data Review Checklist available at https://dec.alaska.gov/spar/csp/lab-approval/documents/ shall be provided for each analytical data package.
Use ADEC’s 2024 Site Closure Memorandum to ensure that future work at the site will move the site forward towards closure and is available at https://dec.alaska.gov/spar/csp/guidance-forms/.
Use ADEC’s Site Characterization Work Plan and Reporting guidance for Investigation of Contaminated Sites dated March 7, 2017. This document is available at https://dec.alaska.gov/spar/csp/guidance-forms/.
SCOPE of WORK:
• Conduct a kick-off/conference call meeting to review the proposed project work statement objectives and the project schedule. Contractor shall provide own meeting minutes and a list of action items, as needed..
• Prepare a Draft and Final Work Plan (WP), which includes as a minimum Site Assessment, Sampling and Analysis, Ecological Risk, Health and Safety. After the Work Plan is approved the Contractor shall provide the services outlined in the plan task by task. Providing a cost task by task is critical for funding accuracy. Work Plan shall include: notes, documents, reports, expert recommendations, and task cost breakdowns. Review of the listed reports is critical to formulating a Work Plan that will achieve the government’s desired result. Previous reports for the USFWS Kodiak NWR Triplex Hazard ID: 27197 site can be viewed on the Alaska Department of Environmental Conservation’s (ADEC) website: http://dec.alaska.gov/Applications/SPAR/PublicMVC/CSP/SiteReport/27197.
• Update Site Characterization Report for site based on historical data and data collected from this site.
• Develop a Corrective Action Completion Report (CACR) that discusses the cost and pros/cons of mitigating the site using active remediation, engineered barriers, institutional controls (Land Use Control Plan), or a combination of these methods. The contractor shall provide a final recommendation based on this evaluation.
Requirements:
• Work Plan:
https://dec.alaska.gov/spar/csp/guidance-forms/ http://dec.alaska.gov/Applications/SPAR/PublicMVC/CSP/SiteReport/27197
The Work Plan shall be prepared, submitted, and approved prior to conducting any work. The Work Plan shall describe the approach to waste stream identification and segregation, sample location selection, workplan deviations, Conceptual Site Model, field screening method, collection of samples, field documentation, field quality control measures, tracking of samples, Investigation-Derived Waste (IDW), Quality Assurance Project Plan (QAPP), safety and health precautions, repair of damage caused by sample collection (where necessary), the experience and qualifications of the personnel conducting the survey, and identity of the ADEC certified laboratories that will be used. The Work Plan will be delineated by Task such that each task can be priced separately and clearly defined.
• Quality Assurance/Quality Control:
The Contractor shall perform QC/calibration checks on all instruments (i.e. PID) in accordance with the instrument manufacturer’s PCS. At a minimum, calibration checks for each instrument shall be completed in accordance with the operator manual and the manufacturer’s PCS and documented if the final report. The calibration checks performed according to this paragraph that fall within the specification for the instrument shall demonstrate reading validity.
The Contractor shall follow Section 12 - Quality Control (QC) Measures of the Field Sampling Guidance Quality Control (QC) Measures to meet the Minimum Quality Assurance (QA) Requirements for Sample Handling, Reports, and Laboratory Data for all samples collected on-site.
The Contractor shall use a laboratory approved by ADEC for analyzing all samples.
• Contaminated Soils and Groundwater Survey and Sampling:
Contractor shall provide the services of a qualified environmental professional to perform a soils investigation to complete sampling at the site. Major elements of the effort shall consist of the following:
• Review all previous site reports and information and sample according to ADEC protocols. Also develop a hypothesis about where contaminants might migrate to if they have spread out of the immediate government owned area. This hypothesis will be part of the Contractors proposal. The government assumes twelve soil bore samples as a minimum. The location and depth will be recommended by the contractor, as long as this is consistent with ADEC protocols and also gives the government the best most accurate information about soil contamination amounts and contamination migration. Any other soil samples necessary will be pre-priced by the Contractor on a per sample basis. The pre-price will be part of the proposal.
• The Contractor shall conduct as many (a minimum of three (3)) groundwater samples as approved as necessary as long as this is consistent with ADEC protocols and also gives the government the best most accurate information about groundwater conditions. Additional samples necessary will be pre-priced by the Contractor on a per sample basis. The pre-price will be part of the proposal.
• Samples shall be submitted to an ADEC approved laboratory for analysis of Diesel Range Organics (DRO) by Alaska Method AK102, Gasoline Range Organics (GRO) and Benzene, Toluene, Ethylbenzene, and Xylene (BTEX), by Alaska Method AK101. Environmental samples shall be delivered to the laboratory using chain-of-custody procedures.
• Field headspace screening shall be performed on all soil samples taken from soil borings. Samples shall be screened using a Photo Ionization Detector (PID). Readings shall be logged.
• Mobilize at the site following receipt of an approved Work Plan. The contractor will secure all tools and materials before leaving the work area.
• Prepare the site (locates, interviews, meetings, etc.). Implement spill control and erosion control measures as needed.
• Provide analysis of the suspected extent and distribution (horizontal and vertical) of petroleum contamination in soil
• Conduct groundwater investigation to determine where groundwater at the site has been impacted and if it is feasible to recover free product and/or treat the groundwater.
• Perform all operations in a manner which will minimize dust, noise, and other nuisance. Maintain haul routes for disposal of material, clean and free of debris.
• Protect existing facilities from damage by falling debris, dust, and construction operations.
• Perform operations in a manner that in no way endangers personnel, public, existing structures, utilities, road
• Contractor shall be responsible for damage to personnel, public, roadways, streets, structures, utilities, facilities, and equipment caused by operations and shall repair any damage at its own expense or replace items damaged beyond repair.
• Materials to be removed will be permitted to accumulate on site. All materials shall be stored in a secured location at the end of the workday and in a manner to prevent contamination of the site.
• Do not operate vehicles or equipment on existing construction or roadways which could be damaged.
• Contractor shall relocate, as necessary, existing active miscellaneous piping, conduit, and electrical circuits and devices (if needed). Contractor is responsible for repairing any damaged assets or utilities.
• The Contractor shall maintain field notes, daily logs, and photographs to document all field activities to include: site maps, excavation size, visibly contaminated soil, samples locations, depth to groundwater, and other important observations and events. Submit Field Notes to the Contracting Officer. All field notes shall become the property of the Government.
• Provide the Contracting Officer with recommendations on further actions if necessary.
• The Site Characterization Report shall follow ADEC CSP Site Characterization Work Plan and Reporting
Guidance for Investigation of Contaminated Sites provide (As a minimum):
1) A description of the work effort with analytical results that describes the significance of detected concentrations relative to appropriate regulations.
a. Note any discrepancies between the project work plan and the actual project activities performed.
b. Note any discrepancies between the Sample Location Selection detailed in the Work Plan and any changes made during sampling, along with explanation of differences.
2) Results of the current round of sampling shall be provided in a spreadsheet with previous data collected 2017 and 2020 report and displayed on a map showing results and location of sample.
a. Date(s) of the survey and sample collection
b. Identification of field-portable methods used during the survey and applicable calibration check results.
c. Laboratory report and chain-of-custody forms
1) The Contractor shall require the laboratory to provide the information necessary for the Contractor to comply with the data evaluation/validation procedures outlined in this SOW. This shall include a data package containing the following information:
2) Cover page information including methods, dates, instruments, digestions, and signature of the laboratory director.
3) Sample information including identification and the results for samples, blanks, QC samples, dilution factors, and batch identification.
d. Comparison of the sample results to the cleanup levels for petroleum established by the Alaska Department of Environmental Conservation (ADEC).
3) In the conclusions and recommendations section, make a determination, using specific documentation and appropriate references, of whether chemical contamination is in the soil or groundwater, and if found, if the contamination may have been caused by the tank and/or piping.
4) The summary of all findings and recommendations shall be included in the Site Characterization Report and shall meet the requirements of the ADEC. The report shall be signed by a registered or licensed professional individual (s) in the employ of the Contractor as required by the State.
5) Respond to all comments received for U.S. Fish and Wildlife Service and ADEC.
• Develop a Corrective Action Completion Report and Submit to ADEC that addresses:
1. For the purposes of the CACR, the specific pathways in which exceedances are present must be addressed. The pathways in question are:
a. Soil ingestion and inhalation pathways,
b. Soil component to the groundwater ingestion exposure pathway.
c. Groundwater ingestion pathway
d. Groundwater to Surface water exposure pathway.
e. Indoor inhalation pathway (Vapor Intrusion) (if a building is built in this location in the future),
f. Construction worker inhalation pathway.
2. The CACR shall develop a Corrective Action Plan that discusses the cost and pros/cons of mitigating the site using active remediation, engineered barriers, institutional controls (Land Use Control Plan), or a combination of these methods. The contractor shall provide a final recommendation based on this evaluation.
3. If Institutional Controls (Land Use Control Plan) is selected, work with U.S. Fish and Wildlife to develop and submit Land Use Control Plan to ADEC that will be recorded in the Kodiak NWR Comprehensive Conservation Plan (CCP) as a possibility.
https://dec.alaska.gov/media/12119/site-characterization-work-plan-reporting-guidance-2017.pdf https://dec.alaska.gov/media/12119/site-characterization-work-plan-reporting-guidance-2017.pdf
4. Respond to all comments received from U.S. Fish and Wildlife and ADEC.
5. The report shall be signed by a registered or licensed professional individual (s) in the employ of the Contractor as required by the State.
DELIVERABLES:
● Pre-Work Meeting: Organize a pre-work meeting within 2 weeks of receiving the notice to proceed (NTP). Within 10 workdays of pre-work meeting, contractor shall submit a Draft Work Plan for approval. The Service requires 45 workdays to review and comment on the Draft Work Plan. After Draft Work Plan is approved, provide a copy of Final Work Plan within 10 workdays. With Final Work Plan ready, proceed to work site to complete all sampling activities. The Work Plan shall follow the ADEC 20217 Site Characterization Work Plan and Reporting guidance.
● Work Plans shall include a General Description Section followed by a Task Section:
● Each task shall be broken down into sub-tasks. Sub-task shall include pictures and figures describing items and locations for sampling and remediation. The Task Section of the work plan shall be followed by a Regulation Section with all applicable federal, state and/or local regulations that regulate the handling, transporting, and disposing of all contaminated material from the site. The Regulation Section shall also identify the closest disposal locations for each waste streams.
● A Dailey Field Report
● Complete the ADEC Contaminated Media Transport and Treatment or Disposal Approval Form. The form shall be submitted, prior to transport, to ADEC for approval in accordance with 18 AAC 75.325(i) and 18
AAC 75.360.
● Prepare and submit copies of DRAFT Site Characterization Report and a Corrective Action Remediation Report within 90 days of receipt of regulatory sample analyses. Provide copies of report to COR or his/her designee, Station, and ADEC.
● The government and ADEC shall have 45 days to comment on the Draft Reports. The Contractor shall then have 45 days to produce a Final Report. Provide copies of report to COR or his/her designee, Station, and
ADEC.
● The final deliverable shall be the Site Characterization Report and a Corrective Action Remediation Report in editable electronic Microsoft Word. The report shall include information needed to verify work completed conclusions, and recommendations. The final report shall include photographs and field notes.
SITE VISITS, CONDITIONS, AND INSPECTIONS
Contractor should become familiar with the site to examine conditions under which this work is to be performed.
Coordinate all site visits and work activities in advance with the Refuge On-Site Representative (OSR) and Contracting Officer Representative (COR), providing a minimum of five (5) business days of advance notice.
NOTIFICATIONS:
Contact the COTR, COR or his/her designee and Refuge Representative before departing to the site. Review concerns about time lines, transportation, equipment, personnel, permits, licensing, and contingencies. Keep the CO and COTR informed of progress. Daily reports, photographs, notes, and all documentation shall become the sole property of the government.
ON-SITE WASTE MANAGEMENT
All waste generated from this contract shall be disposed of off-site according to local, state, and federal requirements. An ADEC Soil Transport Approval Form is required before removing any contaminated media from the site.
ANALYSIS AND INVENTORY:
Provide documents that delineate a clear concise paper trail of how, when, and where contaminants were disposed of. This Statement of Work is not all-inclusive and shall not relieve the contractor of responsibilities as outlined in federal, state, and local regulations.
PROJECT SCHEDULE and REPORTING:
Within ten (10) work days after Notice to Proceed (NTP) shall provide a project work schedule. Verify and clarify travel, permits, payment schedules, report format, schedule of values, work plan actions, availability of equipment, etc.
Coordinate existing and new data to evaluate and recommend proper course of action. Daily reports, photographs, notes, and documentation shall become the sole property of the government. The project shall be completed by September 30, 2026.
Contractor shall notify the Government no less than ten (10) days prior to commencement of any work activities.
AVAILABILITY: Normal duty hours, Monday thru Friday 7:30 a.m.-4:00 p.m. Non-duty hours include weeknights, weekends, and federal holidays. Contractor shall request approval for any work outside normal duty hours.
ATTACHMENTS:
Use attachments as guides only. The government makes no claims as to the accuracy or usability of attachments.
PERMITS:
The Contractor shall be responsible for obtaining the necessary permits including preparing paperwork for permanent closure on behalf of the Government. Collect all data, maps, chemical analyses, etc., necessary to prepare complete and accurate report that meets the requirements of the ADEC.
Comply with inspection requirements of the State and local agencies. Inspect and ensure that no electrical, gas, water, structures, or other conditions are in the area that may affect work. Contact the local fire marshal and the public utilities office before beginning the work.
UNDERGROUND OBSTRUCTIONS:
There are no known underground piping, foundations, and other underground obstructions in the vicinity of excavation.
The Contractor shall contact the local public utility to ensure they can work safely. The Contractor shall still take care when performing drilling and excavation to ensure they are using all possible means to avoid unknown obstructions or utilities.
Protect underground facilities encountered during excavation until it is determined whether they are active or inactive.
Repair, without compensation, existing active facilities that should have been identified by Contractor inspection.
Notify the government immediately of any unexpected subsurface conditions and discontinue work until notified to resume.
FILL MATERIALS: (N/A for this Project) Fine aggregate: State standard FA-1.
REMOVAL PROCEDURES:
• Excavated soil shall be stockpiled, stored and sampled according to 18 AAC 75.370 and the methods in the Alaska
Department of Environmental Conservation’s Field Sampling Guidance. Contaminated soil disposal shall be in accordance with 18 AAC 75.325(i) and 18 AAC 75.360. A Contaminated Media Transport and Treatment or Disposal Approval Form shall be submitted prior to transport to ADEC for approval.
Any excavated material shall be placed in a separate stockpile pending disposal. The stockpile shall be located on an impermeable surface and shall be kept covered with plastic sheeting. Salvageable materials shall become property of Contractor and shall be removed from site as work progresses.
DISPOSAL OF MATERIALS:
An ADEC “Contaminated Media Transport and Treatment or Disposal Approval Form"is required before removing any contaminated media from the site. Contractor shall be responsible for proper disposal of all project derived waste material.
This includes, but is not limited to, recovered free product, excess excavated material, non-salvageable equipment and materials. Waste material shall be transported and disposed of using transporters and disposal facilities, which possess all required federal, state, or local licenses or permits. Submit manifests certifying destination, receipt, and disposal of demolition materials. Burning of waste lumber and other materials or trash on site shall not be permitted.
CLEANUP:
Maintain public streets, alleys, or other thoroughfares used in carrying out disposal free of litter or soil attributable to this operation. Equip and load trucks or other vehicles to prevent leakage, blowing off, or other escape of any portion of whatsoever is being hauled. Cost incurred by the Government in cleaning up such litter will be charged to Contractor and deducted from monies due or to become due it under this contract. Upon completion of work, thoroughly clean area of materials not to remain. Cleanup activities shall be in accordance with Federal, State, and Local regulations.
KEY PERSONNEL
The project team includes a Contracting Officer, Contracting Officer Representative, Program Manager, Project Manager/Lead Environmental Manager whom the Site Project Manager and Contractors reports to. The following is an overview of personnel directly responsible for supporting the efforts of this contract.
Contracting Officer Representative: Robert McGinn, Regional Environmental Compliance Coordinator Address: 5600 American Blvd W, Suite 990, Bloomington, MN 56001 Contact info, phone and email: (612) 518-1237, Robert_McGinn@fws.gov
Program Manager: Danielle, Fujii-Doe, Deputy Refuge Manager Address: 1390 Buskin River Road, Kodiak, Alaska 99615 Contact info, phone and email: (907) 308-6346, danielle_fujii-doe@fws.gov
PROPERTY CLEARANCE & ACCESS:
The contractor shall obtain clearances and access to the properties from the government and any other appropriate authorities. The contractor shall also arrange for and coordinate all locates with the local utility companies prior to subsurface investigations. The 2017 Report alludes that some contamination has possibly migrated off of federal property. The Contractor shall work closely and get approval from the Program Manager to coordinate/initiate any contact with the adjacent property owner.
GOVERNMENT-FURNISHED EQUIPMENT AND GOVERNMENT-FURNISHED INFORMATION:
There is no government furnished equipment with this project.
Attachments:
1. 2006 Kodiak NWR Triplex CAP Summary Report
2. 2017 Kodiak NWR – Former USFW Triplex SCR Report
3. 2020 Kodiak NWR – Soil and Groundwater Assessment and Remediation Report
Current Site Conditions – Photos taken 2025 by Livia Bracker, ADEC
PHOTO 1: Shared driveway between the USFWS and Alascom property.
PHOTO 2: Shallow water from rain on north edge of the USFWS property.
PHOTO 3: Site photo facing north.
PHOTO 4: Site photo facing south/southwest.
PHOTO 5: Shed #1
PHOTO 6: Shed #2 and #3.
PHOTO 7: Equipment parked on site property.
PHOTO 8: Wood pile #1 on south side of property (near former Test Pit 1).
PHOTO 9: MW-1?
PHOTO 10: MW-1 with Alascom building as reference.
PHOTO 11: MW-1 with Shed #2 as reference.
PHOTO 12: MW-2?
PHOTO 13: MW-2 with Shed #2 as reference.
PHOTO 14: MW-3
PHOTO 15: MW-3 with Alascom building as reference.
PHOTO 16: MW-3 with wood pile #1 as reference.
PHOTO 18: MW-4
PHOTO 19: MW-4 with wood pile #1 and shed #1 as reference.
PHOTO 20: MW-6
PHOTO 21: MW-6 with Shed #1 for reference.
PHOTO 22: MW-6
PHOTO 23: MW-5 suspected to be below wood pile #2 near Shed #2.
PHOTO 24: MW-5 suspected to be below wood pile #2 near Shed #2.
PHOTO 25: Unknown plastic pipe on back end of hill on south edge of property.
PHOTO 26: Plastic pipe seen in Photo #25 hidden in grass/bush. Shed #2 as reference.
PHOTO 27: Unknown shallow hole on NE edge of property (potentially off property).
PHOTO 28: NE edge with Shop #1 as reference.
PHOTO 29: Site photo facing east.
RFQ
Provisions
Provisions by Reference:
The following provisions are hereby incorporated by reference:
52.204-7 System for Award Management. (NOV 2024)
52.204-16 Commercial and Government Entity Code Reporting. (AUG 2020)
52.204-22 Alternative Line Item Proposal. (JAN 2017)
52.204-29 Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures.
(DEC 2023)
52.212-1 Instructions to Offerors - Commercial Products and Commercial Services. (SEP 2023)
52.217-5 Evaluation of Options. (JUL 1990)
Provisions in Full Text:
52.237-1 Site Visit.
As prescribed in 37.110(a), insert the following provision:
Site Visit (Apr 1984)
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
(End of provision)
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services-Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.
(a) Definitions. As used in this provision-
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
https://www.acquisition.gov/far/part-37#FAR_37_110
(b) Prohibition. (1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to-
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to-
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."
(d) Representations. The Offeror represents that-
(1) It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that-
It [ ] does, [ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.
(e) Disclosures. (1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment-
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(ii) For covered services-
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment-
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(ii) For covered services-
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
52.212-2 Evaluation - Commercial Products and Commercial Services. (NOV 2021)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will provide the lowest price technically acceptable:
Technical Acceptability (Pass/Fail):
To be considered technically acceptable, the vendor must submit a brief technical response confirming the following:
1. Ability to meet all requirements of the Statement of Work (SOW), including plowing, shoveling, ice control, and snow hauling.
2. Availability of required equipment and labor, including a plow truck, skid steer/loader, and hand-labor personnel.
3. Ability to meet response times identified in the SOW (e.g., after qualifying snowfall events and emergency response within 2 hours).
4. Ability to operate during the winter season in Fairbanks, Alaska, with continuous service availability from October through April.
5. Valid business license and insurance coverage required for snow removal operations.
(b) Options (if any). The Government will evaluate offers for award purposes by adding the total price for all options (to include the Option to Extend Services, FAR 52.217-8 and the Option to Extend the Term of the Contract, FAR 52.217-9) to the total price for the basic requirement. A six-month extension of services, in accordance with FAR 52.217-8, will be evaluated by the Government based on the CLIN 000050 pricing. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
52.212-3 Offeror…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .