B03__Attch_1_Statement_of_Work___Parking_Lot_Milling.pdf
PDF 778 KB Posted
- Attached to
- UMESC WEST PARKING LOT REPAIR - MILLING
- Solicitation number
- 140G0225R0011
About this file
This Statement of Work (SOW) details the requirements for milling, resurfacing, and restriping the West Parking Lot at the U.S. Geological Survey's Upper Midwest Environmental Sciences Center in La Crosse, Wisconsin. The project scope includes removing and replacing asphalt for the approximately 37,000 square foot parking lot, with specific requirements for surface milling (1-2 inches deep), tack coating, and resurfacing according to Wisconsin Asphalt Pavement Association and Department of Transportation guidelines. The contractor must restripe the lot using OSHA-approved yellow traffic paint, maintaining the existing layout including handicapped stalls.
Key performance requirements include working outside normal facility hours, coordinating with the USGS Technical Liaison to avoid disrupting research equipment, and providing a project plan with proposed schedule and materials. The contractor must carry a minimum of $100,000 liability insurance, be responsible for debris removal, and warranty workmanship for 12 months. Selection criteria prioritize past experience with similar commercial parking lot projects, personnel qualifications, and project planning, with contractors evaluated on a best-value basis using technical and past performance factors in addition to price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASPHALT MILLING AND OVERLAY, RESURFACING AND RE-STRIPING OF WEST
PARKING LOT
1. GENERAL INFORMATION
a. Introduction The Department of the Interior (DOI), U.S. Geological Survey
(USGS), Upper Midwest Environmental Sciences Center (UMESC) 2630 Fanta Reed Road, La Crosse, Wisconsin 54603 requires milling, resurfacing and re-striping of the West Visitors Parking Lot.
b. Background: See attached pictures for additional information. The existing West Parking Lot has significant deterioration and cracking of the pavement.
Most of the parking lot striping has deteriorated to the point of not being visible.
The West Lot is approximately 37,000sf.
c. Scope: Services, construction, to provide all equipment, labor, travel, and materials (unless otherwise provided herein) necessary to perform asphalt milling, resurfacing, sealcoat and restriping of the West Parking Lot according to all federal, state and local codes.
2. WORK REQUIREMENTS
a. Scope: Asphalt Mill and Overlay: The contractor shall remove and replace asphalt for the West Parking Lot.
b. Asphalt.: The contractor shall use plant mix pavement in conformance with the current version Wisconsin Asphalt Pavement Association (WAPA) Design Guide.
The contractor shall be responsible for sweeping or other means necessary for cleaning of the street prior to performing this task.
c. Surface Milling: The contractor shall perform milling of the existing parking lot asphalt surface to a depth as needed to produce a level, properly sloped surface.
Typical applications will be 1-2" deep depending on conditions. The contractor shall be responsible for hauling-off and/or retainage of millings.
d. Tack Coat Requirements: The contractor shall conduct tack coat tasks in compliance with the current version of (WAPA) Design Guide and the National Cooperative Highway Research Council (NCHRP) Report 712, Optimization of Tack Coat for HMA Placement. Material shall be diluted asphalt. Material shall be applied in adherence with the current industry standards and Wisconsin Asphalt Pavement Association (WAPA) guidelines.
e. Resurfacing: Apply and compact new asphalt according to WAPA and Wisconsin Department of Transportation (WisDOT) guidelines (publication 450 General Requirements for Asphaltic Pavements). Parking lot height and slope relative to original curbing and drains shall match original construction requirements.
f. Phase V: Striping: Restripe existing layout, (handicapped stalls, numbers, letters, hashed lanes, etc.) using OSHA approved set fast heavy yellow traffic paint.
Painting of curbs not included.
i. Parking space dimensions Parking Angle Space Width Space Length Width at Curb 90º 10’ 18’ 10’ 60º 9’6” 18’ 11’
d. General Requirements
i. The contractor shall include a draft design and tentative work schedule with their proposal and adhere to the contracted design and schedule once awarded. Any deviation must be approved via the change order processes.
ii. Work shall be performed outside of regularly scheduled facility hours (7:30am-4pm; Mon. – Fri.). Work performed by the Contractor outside of normal facility hours must be coordinated with the USGS TL at least 48 hours in advance.
iii. Coordinate work with the USGS TL to ensure any facility research equipment or studies are not interrupted or disturbed. Contractor will be responsible for any work performed as part of this contract that causes damage to existing equipment or negatively impacts ongoing research.
iv. After application and paint cordon off parking lot to vehicular traffic on any portion of the finished pavement until it has cured sufficiently and at least 24 hours has elapsed.
v. General Contractor shall provide enclosures and barricades throughout the site where necessary to exclude trespassers, eliminate safety hazards and facilitate the progress of work.
vi. All Construction shall follow requirements of 2015 International Building Code and the guidelines of the National Asphalt Pavement Association (NAPA), the (WAPA) Design Guide, Wisconsin Department of Transportation (WisDOT) publication 450 and the National Cooperative Highway Research Council (NCHRP).
vii. All work shall be performed in compliance with accepted industry standards and practices.
viii. All materials shall be installed in accordance with manufacturer’s recommendations and installation instructions.
ix. Contractor shall provide equipment as the Government deems necessary to minimize debris in and around work areas.
x. Contractor shall daily clean or cover surfaces or equipment impacted by construction work and remove any debris created by the demolition and/or installation from this project.
xi. The contractor shall be responsible for the demolition, removal and lawful disposal of all excess materials, including any waste and debris.
xii. Contractor shall ensure that no damage occurs to the surrounding buildings or equipment. Contractor shall be responsible for any repair costs due to damage to surrounding ponds, fencing, or piping caused by construction or demolition as part of this project.
xiii. The contractor shall be responsible for removing and replacing damaged surface during the project at no additional expense.
xiv. Contractor shall carry a minimum of $100,000 liability insurance against potential facility and or equipment damage.
xv. Contractor shall gain approval from the TL prior to entry into other areas of the facility not directly related to this project scope. Entry into offices, mechanical/electrical spaces and or laboratories without permission from USGS TL is prohibited.
xvi. Contractors shall notify the TL of any issues affecting project completion or delivery dates as soon as practical but no later than 24 hours.
xvii. Contractors shall provide their own toilet facilities as part of this project.
Use of UMESC facilities is prohibited.
xviii. Electrical outlets will be identified by the Technical Liaison (TL) for supplying power to Contractors 120vac tools for this Project. Existing electrical circuits are 15 amps max rating. Contractor shall be responsible for providing portable generators if different voltages or power requirements are needed for Contractor equipment.
b. Project Completion Documentation:
i. Final Inspection and Acceptance Criteria
1. Upon successful completion of the installation and prior to the Final Acceptance, the Contractor shall ensure that there are no apparent defects in the parking lot or striping work. Contractor shall notify TL in writing or email requesting a site inspection for the purpose of formal acceptance of the completed work.
2. The Contractor shall notify the TL in writing to request a Final Inspection and Acceptance Test no later than 15 business days after receipt of the Notice to Proceed. All aspects of the work shall have been evaluated by the Contractor and found to be correctly installed and ready for final evaluation prior to the Contractor requesting the inspection.
3. Acceptance by the Government will be given only after the satisfactory completion of the work as outlined in this Scope of Work. Project acceptance can be issued only by the project Contracting Officer (CO).
ii. Warranty Work and Service
1. The Contractor shall warranty all workmanship to meet the specifications set forth in this SOW. Additionally, the Contractor shall warranty all Contractor workmanship for a (minimum) period of 12 months from the date of Government acceptance.
c. Deliverables
i. Repair, sealcoat and restriping to be complete within 60 days of notice to proceed.
2. SUPPORTING INFORMATION
a. Place of Performance: UMESC; 2630 Fanta Reed Rd. La Crosse, WI. West Parking Lot.
b. Period of Performance: 90 days from notice to proceed.
c. Government Furnished Property (GFP): None.
d. Special Considerations
i. None.
West Lot: Existing
West Lot: Proposed New Stall Quantities and Widths
1. SELECTION CRITERIA
a. Contractor shall be selected based on Best Value in accordance with the FAR
15.101-1 according to the following criteria in descending order of importance:
i. Past Experience: Contractor shall provide references of a minimum of three (3) projects within the past 5 years involving the contractor performing commercial asphalt parking lot repairs, specific to milling, resurfacing and restriping. Projects provided for reference shall be at least $50,000 in dollar value and scope. Contractor project experience must be specific to the work requirement of this PWS, demonstrating Contractor or subcontractor under JV or TA project general construction to be considered acceptable for this factor.
ii. Qualifications: Contractor shall provide a listing of personnel who will perform the Work. Listing shall include personnel trade education, installation and work experience related to the requirements listed in this PWS, and number of years employed with the Contractor. Contractor proposal must demonstrate possessing the competent knowledge in installation and maintenance of asphalt surfaces, through a combination of years of experience, training and trade education to be considered acceptable for this factor.
iii. Project Plan: Contractor shall submit a project plan outlining proposed schedule of Work. Contractor shall include a project schedule, materials, products and manufacturers intended to be used for this project.
Contractor must provide a synopsis of the proposed work, including schedule, materials to be used and a sketch of the proposed layout of the new parking lot striping.
Contractor shall include the following information on proposed work plan:
1. When would the offeror start work on the parking lot: ___ calendar days after receipt of the County's Notice to Proceed.
2. Completion: When would the project be completed- state number of workdays from start: ___ workdays after start date.
3. Describe how the offeror will perform the repair- use of 1" overlay, 2" overlay, etc.
iv. Price: Contractor shall submit pricing for the following:
1. Construction work as outlined in the PWS.
b. Each of the technical factors/subfactors described above will be rated as follows.
i. Outstanding. Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Proposal contains strengths which far outweigh any weaknesses. Risk of unsuccessful performance is very low.
ii. Good. Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
iii. Acceptable. Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
iv. Marginal. Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
v. Unacceptable. Proposal does not meet requirements and contains one or more deficiencies. Proposal is un-awardable.
c. Past performance will be rated by assigning a confidence assessment rating, based on the offeror’s performance record on recent and relevant projects.
More recent/more relevant past performance will impact the overall confidence assessment rating more than less recent/less relevant past performance will. Relevancy is defined as follows.
i. Very Relevant. Past performance effort involved essentially the same scope and magnitude of effort and complexity this solicitation requires.
ii. Relevant. Past performance effort involved similar scope and magnitude of effort and complexity this solicitation requires.
iii. Somewhat Relevant. Past performance effort involved some of the scope and magnitude of effort and complexity this solicitation requires.
iv. Not Relevant. Past performance effort involved little or none of the scope and magnitude of effort and complexity this solicitation requires.
d. Confidence assessment ratings are as follows.
i. Substantial Confidence. Based on the offeror’s recent and relevant performance record, the USGS has a high expectation that the offeror will successfully perform the required effort.
ii. Satisfactory Confidence. Based on the offeror’s recent and relevant performance record, the USGS has a reasonable expectation that the offeror will perform the required effort.
iii. Limited Confidence. Based on the offeror’s recent and relevant performance record, the USGS has a low expectation that the offeror will successfully perform the required effort.
iv. No Confidence. Based on the offeror’s recent and relevant performance record, the USGS has no expectation that the offeror will successfully perform the required effort.
v. Unknown Confidence/Neutral. No recent or relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.