This price schedule solicitation requests lump sum pricing to replace the standing seam metal roofs of two buildings at Charles Pinckney National Historic Site in Mount Pleasant, South Carolina. The solicitation seeks replacement of approximately 3,500 square feet on the Comfort Station roof with a 10/12 pitch and approximately 6,000 square feet on the curatorial building's L-shaped roof also at a 10/12 pitch. Offerors must price both the base work of replacing the roofs in kind with green painted galvanized steel matching the existing appearance and durability, as well as all option line items. Pricing is also requested to replace up to approximately 850 square feet of roof substructure on the Comfort Station and 1,250 square feet on the curatorial building, including plywood, vapor barrier, and moisture retardant. Damaged fascia or trim boards are to be included as well. A detailed cost breakdown must be attached to the lump sum price proposal. The solicitation number is 140P5123Q0055 from the National Park Service Southeast Region within the Department of the Interior.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Quote
| SOLICITATION PRICE SCHEDULE |
| SOLICITATION NUMBER: 140P5123R0004 PROJECT TITLE: Replace Fire Suppression System at 497 & 503 Auburn Avenue Martin Luther King, Jr. National Historic Park, Atlanta, GA |
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 1 | This project will replace the aging standing seam metal roofs of the Comfort Station and the Curatorial building at Charles Pinckney NHS. The Comfort station is a cross-gabled roof with the reverse gable only to one side for aesthetics, it is approximately 3500 square feet with a 10/12 pitch. The Curatorial building is also a cross-gabled roof although it is L-Shaped and is approximately 6000 square feet with a 10/12 pitch. These roofs will need to be replaced with similar style and matching materials to maintain the desired appearance, of green painted galvanized steel as well as matching the current durability or providing a better solution. The roofing substructure shall be replaced as needed up to approximately 850 square feet on the Comfort Station and roughly 1250 square feet on the curatorial building of plywood, vapor barrier and moisture retardant. All damaged fascia or trim boards shall be included as well for Charles Pinckney National Historic Site Mount Pleasant, South Carolina per the attached statement of work (SOW). | 1 | LS | ||
| TOTAL PROPOSED PRICE | |||||
| NOTE: PLEASE PROVIDE A DETAILED COST BREAKOUT OF YOUR LUMP SUM PRICE PROPOSAL WITH ATTACHMENT 0003. ALL COSTS ASSOCIATED WITH YOUR PRICE PROPOSAL SHALL BE INCLUDED. PLEASE PROVIDE COST BREAKDOWN ON THE DETAILED COST BREAKDOWN TAB. |