B01 Section J Attachment 1 Seed Project Bid Schedule.xls
XLS spreadsheet 36 KB Posted
- Attached to
- Albuquerque SFC MATOC
- Solicitation number
- 75H70120R00011
About this file
This document contains a bid schedule for a proposed sewer main project on the Mescalero Apache Indian Reservation, as well as details of a related federal contract opportunity through the Indian Health Service. The bid schedule lays out itemized costs for project components including connecting to existing infrastructure, installing gravity and terminal sewer mains, manholes, cleanouts, and service lines. It also includes costs for road bores, tank abandonment, mobilization and demobilization, stormwater prevention, rock excavation, and operations and maintenance training.
The federal contract opportunity is a solicitation for indefinite delivery, indefinite quantity Multiple Award Task Order Contracts for sanitation facilities construction services. The base period is for one year with four optional extensions. Work will primarily be within the Albuquerque IHS region but may occur elsewhere. The goal is to award three to five contracts from a single solicitation to establish a pool of contractors eligible to bid on task orders.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EE (2)
| 75H70120R0011 - Section J Attachment 1 | |||||
| Mescalero Apache Indian Reservation | |||||
| Proposal Offer | |||||
| Goat Summit Sewer Main | |||||
| IHS Project AL-19-B37 | |||||
| July 2020 | |||||
| No. | Item Description | Quantity | Unit | Unit Cost | Total Cost |
| 1 | Connection to existing sewer main | 1 | EA | ||
| 2 | Connection to existing manhole | 1 | EA | ||
| 3 | 8-inch PVC gravity sewer main | 14822 | LF | ||
| 4 | 8-inch terminal sewer main cleanout | 1 | EA | ||
| 5 | Standard manhole | 45 | EA | ||
| 6 | Drop manhole | 3 | EA | ||
| 7 | Discharge manhole and piping | 1 | EA | ||
| 8 | Connection to existing sewer force main | 1 | EA | ||
| 9 | Plug valve and box | 2 | EA | ||
| 10 | Road bore | 60 | LF | ||
| 11 | Septic tank abandonment | 2 | EA | ||
| 12 | 4-inch PVC double cleanout | 2 | EA | ||
| 13 | 4-inch PVC single cleanout | 2 | EA | ||
| 14 | 4-inch PVC gravity sewer service line | 496 | LF | ||
| 15 | Moblization/Demobilization | 1 | LS | ||
| 16 | Storm water pollution prevention plan & implementation | 1 | LS | ||
| 17 | Rock excavation | 500 | CY | ||
| 18 | O&M equipment and training | 1 | LS | ||
| Subtotal = | |||||
| NMGRT @ 6.3125% = | |||||
| TOTAL PRICE = |