B01 RFP Attachment J07 - Bid Schedule 18-V28.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Prairie Village Sewer Renovation
- Solicitation number
- 75H70122R00026
About this file
This solicitation requests proposals for sewer renovation services. The Indian Health Service seeks a contractor to renovate the existing gravity sewer system for the Prairie Village Community in Anadarko, Oklahoma. Services include furnishing labor, materials, and equipment to replace approximately 1,269 linear feet of 8-inch sewer main, remove 23 existing brick manholes, install 4 standard and 4 shallow precast manholes, install 161 linear feet of steel casing and HDPE carrier pipe by boring, install 2,905 linear feet of cured-in-place pipe along with reinstating 15 sewer service lines, and perform site restoration activities. Offerors must be registered in the System for Award Management and the contract will be a firm-fixed-price awarded using lowest price technically acceptable evaluation. The period of performance is 180 days from notice to proceed with a project magnitude between $500,000 to $1,000,000.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Sch. A
| Wichita and Affiliated Tribes |
| Prairie Village Sewer Improvements |
| IHS PROJECT OK-18-V28 |
| Bid Schedule |
| Estimated | Unit | Total | |||
| Item | Description | Quantity | Unit | Cost | Cost |
| Schedule A - Sewer Improvements | |||
| 1 | Mobilization, Demobilization and Submittals | 1 | LS |
| 2 | 8" SDR 35 PVC Sewer Main (Includes Removal of Existing VCP) | 1,269 | LF |
| 3 | Removal and Disposal of Existing Brick Manholes | 23 | EA |
| 4 | 12" Sch. 40 Steel Casing with 8" HDPE Carrier Sewer Main - Bored | 161 | LF |
| 5 | Flowable Fill Concrete Mix for Pipe Abandonment | 3 | EA |
| 6 | Standard Precast Manhole (7.0'-8.0') | 4 | EA |
| 7 | Additional Feet of Manhole (Beyond 8.0') | 4 | VF |
| 8 | Shallow Precast Manhole (< 7.0') | 19 | EA |
| 9 | 8" SDR 35 PVC for CIPP Connection to New Manholes (Incl. Piping and Fittings) | 32 | EA |
| 10 | Sewer Main Cleanout | 2 | EA |
| 11 | Two-Way Sewer Service Cleanout | 15 | EA |
| 12 | 8" Cure In Place Pipe (CIPP) (Incl. service line reinstatment) | 2,905 | LF |
| 13 | Sewer Service 4” x 8” Wye Branch Connections | 15 | EA |
| 14 | Connection to Existing Sewer System (East Side of MH#1) | 1 | LS |
| 15 | Site Restoration and Grading | 1 | LS |
| 16 | Topsoiling, Seeding and Mulch | 1 | LS |
Total Schedule "A" $ - 0