B01 RFP ATTACHMENT J02 - Drawings.pdf
PDF 34 MB Posted
- Attached to
- DZ Health Center HVAC Upgrade
- Solicitation number
- 75H70123R00026
About this file
This solicitation is for HVAC upgrade services at the Dzilth-NA-O-Dith-Hle Health Center in Bloomfield, New Mexico. The work includes replacing two air handling units, two roof top units, and upgrading the building automation system. The period of performance is 230 calendar days from notice to proceed. The magnitude of work is estimated between $1 million to $5 million. A site visit will take place on May 11, 2023 at 9:30am MST. The Indian Health Service intends to award a firm fixed price contract as the procurement method utilizing lowest price technically acceptable evaluation criteria. Responses are due by the dates specified in the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2021.09.22
Exp: 2022.12.31
A.
B.
C.
D.
E.
F.
ANY CHANGES MUST BE APPROVED BY COR BEFORE DOING ANY
ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING
REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF
REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.
COORDINATE STAGING AREA WITH COR, AND FIND INTERIOR
COVERED STORAGE ON SITE FOR MATERIALS THAT MUST BE
PROTECTED FROM ELEMENTS - COORDINATE WITH COR.
PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2004-012
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .
WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE
TO ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING
ANY DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER
REPRESENTATIVE.
CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITHIHSMASTER CONSTRUCTION
SPECIFICATIONS, WHICH CAN BE FOUND AT
HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND
THE MORE STRINGENT SHALL APPLY.
GENERAL NOTES
A.
B.
C.
D.
E.
THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND
MATERIAL TRAFFIC AND STORAGE WITH COR.
ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL,
PLUMBING ELECTRICAL, AND FIRE PROTECTION.
ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION
PHASING SHALL BE APPROVED BY COR.
ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST
REMAIN ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT
ALL PHASES OF DEMOLITION AND CONSTRUCTION. SHORT-TERM
CLOSURE MAY BE ACCEPTABLE AS COORDINATED WITH COR.
THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK AND
ROOF REPAIRS WITH THE COR.
GENERAL PHASING NOTES
A.
B.
C.
D.
E.
THE CONTRACTOR SHALL USE THE FOLLOWING AS A GUIDE FOR ALL
ICRA BARRIERS. TEMPORARY INFECTION CONTROL BARRIERS
SHALL BE CONSTRUCTED AS FOLLOWS DEPENDING UPON LENGTH
OF NEED:
A. 1 DAY MAXIMUM - PLASTIC
B. 1 WEEK MAXIMUM - FLAME-RETARDANT PLASTIC
C. GREATER THAN 1 WEEK - SEE NOTE 2 AND 3.
TEMPORARY CONSTRUCTION BARRIERS SHALL BE 3 5/8" METAL
STUDS @ 16" O.C. WITH 5/8" TYPE "X" GYP. BD. EACH SIDE. BARRIERS
ARE TO EXTEND TO THE BOTTOM OF EXISTING CEILINGS. PROVIDE
NON-DAMAGING SEAL AT INTERSECTION WITH CEILING. PROVIDE
PLASTIC SHEET BARRIER SEAL BETWEEN TOP OF WALL AND
STRUCTURE ABOVE. TAPE ALL SEAMS AND PENETRATION
OPENINGS TO PREVENT CONTAMINATION FROM PASSING OVER THE
TOP OR UNDERNEATH THE WALL FROM CONSTRUCTION AREAS.
TEMPORARY CONSTRUCTION BARRIERS SHALL BE EITHER TYPE I
OR TYPE II. TYPE I BARRIERS SHALL BE ANCHORED TO THE
FLOORING SURFACE (WHICH IS INTENDED TO BE REPLACED) WITH
POWER ACTUATED FASTENERS. TYPE II BARRIERS SHALL BE
ANCHORED TO THE FLOORING SURFACE (WHICH IS INTENDED TO
REMAIN) BY TAPING BOTTOM STUD TRACK TO FLOOR SURFACE OR
BY OTHER METHODS WHICH WILL NOT HARM FLOOR SURFACE.
TEMPORARY PARTITIONS SHALL NOT CONSTRICT WALKWAYS TO
LESS THAN 6'-0" CLEAR. ANY EXITS CHANGED OR BLOCKED
SIGNAGE NEEDS TO BE POSTED FOR THE MODIFICATIONS.
PROVIDE TEMPORARY RATED DOOR AND FRAME IN CONSTRUCTION
BARRIER AT ENTRY POINTS TO THE CONSTRUCTION AREAS.
DOORS ARE TO REMAIN LOCKED AT ALL TIMES. CONSTRUCTION
CORES WILL BE PROVIDED BY THE VA.
TEMPORARY CONSTRUCTION
FLOOR PLAN LEGEND
INCLUDED IN SCOPE OF WORK
AESUSAESUS
SCALE:
OVERALL FLOOR PLAN
1/16" = 1'-0"1
Architecture, Engineering, and Sustainable Design design
AESUS
group
KEY PLAN NTS
A201
A201
BLDG A
BLDG B
AD201
AD201
SCALE:
ENLARGED DEMO RCP BLDG A.
1/4" = 1'-0"1SCALE:
ENLARGED DEMO RCP BLDG B.
1/4" = 1'-0"2
AESUSAESUS
Architecture, Engineering, and Sustainable Design design
AESUS
group
KEY PLAN NTS
BLDG A
BLDG B
COLUMN CENTER LINE
(E) EXISTING WALL
Legend:
WALL TO BE DEMOLISHED
REMOVE EXISTING LIGHT FIXTURE,
SEE ELECTRICAL
REMOVE EXISTING HVAC
DIFFUSERS, SEE MECHANICAL
EXISTING SPRINKLER HEAD, MODIFY
AS REQ'D, SEE FIRE PROTECTION
AREA OF DEMO
KEY NOTES
1. THE CONTRACTOR SHALL REMOVE THE EXISTING CEILING
SYSTEM AND ASSOCIATED COMPONENTS AS REQUIRED TO
INSTALL NEW MECHANICAL EQUIPMENT. SEE MECHANICAL FOR
MORE INFO.
2. THE CONTRACTOR SHALL MODIFY THE EXISTING CEILING
SYSTEM AS REQUIRED TO INSTALL NEW MECHANICAL
EQUIPMENT. SEE MECHANICAL FOR MORE INFO.
3. REMOVE AND SALVAGE ROOF WALK PADS DURING
CONSTRUCTION. STORE FOR RE-USE IN PLACE FOLLOWING
CONSTRUCTION COMPLETION, TYPICAL.
4. REMOVE EXISTING MECHANICAL EQUIPMENT. SEE MPE FOR
MORE INFO.
5. DEMO EXISTING ROOF CURB(S), AND ALL ASSOCIATED
COMPONENTS, TYPICAL.
6. THE CONTRACTOR SHALL DEMO THE EXISTING PENTHOUSE.
THIS SHALL INCLUDE BUT NOT BE LIMITED TO WALLS, ROOFS,
DOORS, MPE COMPONENTS, AND ALL ASSOCIATED UTILITIES.
ALL DEMOLISHED UTILITIES SHALL BE DEMOLISHED BACK TO
THE SOURCE UNLESS OTHERWISE NOTED.
7. DEMO EXISTING CEILING TILE AND ASSOCIATED COMPONENTS,
TYPICAL.
A. ALL DEMOLITION INSIDE BUILDING MUST BE INSIDE ICRA
BARRIERS.
B. THE GC SHALL PROVIDE PHASING DRAWINGS FOR REQUIRED
SEQUENCE OF DEMOLITION/CONSTRUCTION ACTIVITIES.
C. TEMPORARY INFECTION CONTROL BARRIERS SHALL BE
BUILT UP TO CEILING. COMPLETE ALL INFECTION CONTROL
BARRIERS BEFORE DEMOLITION/CONSTRUCTION BEGINS.
D. IN AREAS OF WALL DEMOLITION, WHERE ADJACENT WALL IS
TO REMAIN, PATCH AND REPAIR DAMAGED PORTION OF
WALL TO MATCH EXISTING.
E. ICRA BARRIER SHALL BE COMPLETE PRIOR TO ANY
DEMOLITION WORK ON THE EXISTING BUILDING.
F. THE INTENT OF THE DEMOLITION DRAWINGS ARE NOT TO
SHOW EVERY ITEM TO BE REMOVED. IT SHALL BE IMPLIED
THAT DEMOLITION IS ALL INCLUSIVE WHERE INDICATED AND
THAT ITEMS TO REMAIN SHALL BE PREPARED AND MADE
READY TO RECEIVE ALTERATIONS AS REQUIRED.
G. DEMOLITION OPERATIONS ARE TO PROCEED WITH
NECESSARY PREPARATIONS AND PRECAUTIONS TAKEN TO
PROTECT ITEMS AND FINISHES TO REMAIN.
H. REMOVE AND DISPOSE ALL DEMOLISHED MATERIALS OFF
SITE WHICH ARE NOT SCHEDULED TO REMAIN, BE
RELOCATED, OR BECOME THE PROPERTY OF THE OWNER.
I. IHS IS RESPONSIBLE FOR REMOVING, STORING AND
RELOCATING ALL MOVEABLE EQUIPMENT FURNITURE,
SHELVING AND RELATED ACCESSORIES.
J. THE CONTRACTORS SHALL VISIT THE SITE TO FAMILIARIZE
THEMSELVES WITH THE EXTENT AND NATURE OF WORK TO
BE PERFORMED. EXISTING CONDITIONS MAY SLIGHTLY
VARY FROM THOSE SHOWN ON THE DRAWINGS. THE
CONTRACTOR SHALL VERIFY ALL CONDITIONS, DIMENSIONS
AND MATERIALS IN THE FIELD AND REPORT ANY
DISCREPANCIES TO THE CONTRACTING OFFICER.
K. THE CONTRACTOR SHALL VERIFY ALL ITEMS AND OR
MATERIALS TO BE SALVAGED BY THE OWNER PRIOR TO THE
START OF DEMOLITION WORK.
L. ALL DEMOLITION DIMENSIONS SHALL BE COORDINATED W/
NEW WORK. DIMENSIONS ARE TAKEN FROM EXISTING FACE
OF WALLS. ALL DIMENSIONS ARE FINISH OPENING SIZES AND
DO NOT ACCOUNT FOR ROUGH FRAMING.
M. ANY REMOVED SIGNAGE SHALL BE STORED FOR FUTURE
USE. COORDINATE WITH COR.
N. MAINTAIN CORRIDOR STAIR, AND EXIT DOOR ACCESS
THROUGHOUT THIS PROJECT FOR HOSPITAL USE.
CONTRACTOR TO MAINTAIN AREA OPEN AND CLEAN.
O. ALL DEMOLITION WORK SHALL BE COORDINATED WITH MP&E
DRAWINGS.
P. INSPECT STRUCTURE FIREPROOFING AFTER DEMOLITION IS
COMPLETE. REPAIR ALL DAMAGED AREAS TO MATCH
ORIGINAL THICKNESS.
Q. SEAL ALL PENETRATIONS AND OPENINGS THROUGH WALLS,
FLOORS, AND CEILINGS.
Demolition General Notes:
A-WING ROOF PLAN - DEMOLITION PLAN
1/8" = 1'-0"1
AESUSAESUS
Architecture, Engineering, and Sustainable Design design
AESUS
group
KEY PLAN NTS
BLDG A
BLDG B
COLUMN CENTER LINE
(E) EXISTING WALL
Legend:
WALL TO BE DEMOLISHED
REMOVE EXISTING LIGHT FIXTURE,
SEE ELECTRICAL
REMOVE EXISTING HVAC
DIFFUSERS, SEE MECHANICAL
EXISTING SPRINKLER HEAD, MODIFY
AS REQ'D, SEE FIRE PROTECTION
AREA OF DEMO
KEY NOTES
1. THE CONTRACTOR SHALL REMOVE THE EXISTING CEILING
SYSTEM AND ASSOCIATED COMPONENTS AS REQUIRED TO
INSTALL NEW MECHANICAL EQUIPMENT. SEE MECHANICAL FOR
MORE INFO.
2. THE CONTRACTOR SHALL MODIFY THE EXISTING CEILING
SYSTEM AS REQUIRED TO INSTALL NEW MECHANICAL
EQUIPMENT. SEE MECHANICAL FOR MORE INFO.
3. REMOVE AND SALVAGE ROOF WALK PADS DURING
CONSTRUCTION. STORE FOR RE-USE IN PLACE FOLLOWING
CONSTRUCTION COMPLETION, TYPICAL.
4. REMOVE EXISTING MECHANICAL EQUIPMENT. SEE MPE FOR
MORE INFO.
5. DEMO EXISTING ROOF CURB(S), AND ALL ASSOCIATED
COMPONENTS, TYPICAL.
6. THE CONTRACTOR SHALL DEMO THE EXISTING PENTHOUSE.
THIS SHALL INCLUDE BUT NOT BE LIMITED TO WALLS, ROOFS,
DOORS, MPE COMPONENTS, AND ALL ASSOCIATED UTILITIES.
ALL DEMOLISHED UTILITIES SHALL BE DEMOLISHED BACK TO
THE SOURCE UNLESS OTHERWISE NOTED.
7. DEMO EXISTING CEILING TILE AND ASSOCIATED COMPONENTS,
TYPICAL.
A. ALL DEMOLITION INSIDE BUILDING MUST BE INSIDE ICRA
BARRIERS.
B. THE GC SHALL PROVIDE PHASING DRAWINGS FOR REQUIRED
SEQUENCE OF DEMOLITION/CONSTRUCTION ACTIVITIES.
C. TEMPORARY INFECTION CONTROL BARRIERS SHALL BE
BUILT UP TO CEILING. COMPLETE ALL INFECTION CONTROL
BARRIERS BEFORE DEMOLITION/CONSTRUCTION BEGINS.
D. IN AREAS OF WALL DEMOLITION, WHERE ADJACENT WALL IS
TO REMAIN, PATCH AND REPAIR DAMAGED PORTION OF
WALL TO MATCH EXISTING.
E. ICRA BARRIER SHALL BE COMPLETE PRIOR TO ANY
DEMOLITION WORK ON THE EXISTING BUILDING.
F. THE INTENT OF THE DEMOLITION DRAWINGS ARE NOT TO
SHOW EVERY ITEM TO BE REMOVED. IT SHALL BE IMPLIED
THAT DEMOLITION IS ALL INCLUSIVE WHERE INDICATED AND
THAT ITEMS TO REMAIN SHALL BE PREPARED AND MADE
READY TO RECEIVE ALTERATIONS AS REQUIRED.
G. DEMOLITION OPERATIONS ARE TO PROCEED WITH
NECESSARY PREPARATIONS AND PRECAUTIONS TAKEN TO
PROTECT ITEMS AND FINISHES TO REMAIN.
H. REMOVE AND DISPOSE ALL DEMOLISHED MATERIALS OFF
SITE WHICH ARE NOT SCHEDULED TO REMAIN, BE
RELOCATED, OR BECOME THE PROPERTY OF THE OWNER.
I. IHS IS RESPONSIBLE FOR REMOVING, STORING AND
RELOCATING ALL MOVEABLE EQUIPMENT FURNITURE,
SHELVING AND RELATED ACCESSORIES.
J. THE CONTRACTORS SHALL VISIT THE SITE TO FAMILIARIZE
THEMSELVES WITH THE EXTENT AND NATURE OF WORK TO
BE PERFORMED. EXISTING CONDITIONS MAY SLIGHTLY
VARY FROM THOSE SHOWN ON THE DRAWINGS. THE
CONTRACTOR SHALL VERIFY ALL CONDITIONS, DIMENSIONS
AND MATERIALS IN THE FIELD AND REPORT ANY
DISCREPANCIES TO THE CONTRACTING OFFICER.
K. THE CONTRACTOR SHALL VERIFY ALL ITEMS AND OR
MATERIALS TO BE SALVAGED BY THE OWNER PRIOR TO THE
START OF DEMOLITION WORK.
L. ALL DEMOLITION DIMENSIONS SHALL BE COORDINATED W/
NEW WORK. DIMENSIONS ARE TAKEN FROM EXISTING FACE
OF WALLS. ALL DIMENSIONS ARE FINISH OPENING SIZES AND
DO NOT ACCOUNT FOR ROUGH FRAMING.
M. ANY REMOVED SIGNAGE SHALL BE STORED FOR FUTURE
USE. COORDINATE WITH COR.
N. MAINTAIN CORRIDOR STAIR, AND EXIT DOOR ACCESS
THROUGHOUT THIS PROJECT FOR HOSPITAL USE.
CONTRACTOR TO MAINTAIN AREA OPEN AND CLEAN.
O. ALL DEMOLITION WORK SHALL BE COORDINATED WITH MP&E
DRAWINGS.
P. INSPECT STRUCTURE FIREPROOFING AFTER DEMOLITION IS
COMPLETE. REPAIR ALL DAMAGED AREAS TO MATCH
ORIGINAL THICKNESS.
Q. SEAL ALL PENETRATIONS AND OPENINGS THROUGH WALLS,
FLOORS, AND CEILINGS.
Demolition General Notes:
45 4
AESUSAESUS
Architecture, Engineering, and Sustainable Design design
AESUS
group
KEY PLAN NTS
BLDG A
BLDG B
KEY NOTES
1. RE-INSTALL, REPAIR, AND/OR REPLACE THE CEILING AND
ASSOCIATED COMPONENTS TO ORIGINAL CONDITION. MATCH
EXISTING AS REQUIRED.
2. INSTALL NEW MECHANICAL DIFFUSER, SEE MECHANICAL FOR MORE
INFO. PATCH AND REPAIR ADJACENT CEILING AS REQUIRED.
3. NEW MECHANICAL EQUIPMENT WITH PRE-FABRICATED ROOF
CURBS, SEE DETAILS ON SHEET A-601 AND MECHANICAL FOR
ADDITIONAL INFO.
4. RE-INSTALL SALVAGED ROOF WALK PADS AS REQUIRED.
5. EXISTING ROOF CRICKET TO REMAIN, TYPICAL.
6. EXISTING ROOF DRAIN TO REMAIN, TYPICAL.
7. PATCH AND REPAIR THE EXISTING ROOF REQUIRED AT NEW
EQUIPMENT LOCATIONS. ALL NEW ROOFING SHALL BE INSTALLED
ACCORDING TO THE MANUFACTURERS SPECIFICATIONS. MAINTAIN
EXISTING ROOF SLOPE. ALL ROOF WORK SHALL NOT VOID ANY
EXISTING MANUFACTURE AND WARRANTIES. THE GC SHALL VERIFY
WITH OWNER PRIOR TO THE START OF ANY NEW ROOF WORK.
8. PROVIDE NEW ROOF WALK PADS AS REQUIRED.
9. INSTALL NEW CEILING TILES AND ASSOCIATED COMPONENTS,
TYPICAL. SEE DETAIL ON SHEET A-501.
GYPSUM BOARD CEILING
GYP
MECHANICAL SUPPLY DIFFUSER
MECHANICAL RETURN/EXHAUST
2'x2' FIXTURES -SEE ELECTRICAL
INDICATES KEY NOTE ON THIS DRAWING
SPRINKLER HEAD
GYPSUM WALL BOARD
Legend:
X
2'x2' ACOUSTICAL CEILING TILE
HEIGHT ABOVE FINISH FLOOR+9'-6"
FINISH
DOWN LIGHT -SEE ELECTRICAL
ACT ACOUSTICAL CEILING TILE
EQUIPMENT & FURNITURE
PATIENT LIFT
CURTAIN TRACK
WALL PROTECTION
A. NOT ALL KEYNOTES WILL BE USED ON ALL SHEETS.
B. NEW WALLS TO EXTENDED TO UNDERSIDE OF THE FLOOR SLAB
ABOVE.
C. SEAL ALL PENETRATIONS AND OPENINGS THROUGH WALLS,
FLOORS, AND CEILINGS TO MATCH RATING.
D. ALL EXISTING STRUCTURAL COLUMNS AND BEAMS TO REMAIN
AND SHALL NOT BE MODIFIED.
E. ALL MECHANICAL CHASES SHALL BE COORDINATED WITH
MECHANICAL, PLUMBING, & ELECTRICAL DRAWINGS.
F. ALL WORK TO BE IN COMPLIANCE WITH NATIONAL AND LOCAL
BUILDING SAFETY CODES.
G. DIMENSIONS ARE FROM FINISHED SURFACES.
H. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
I. LIGHT FIXTURES, SPRINKLER HEADS, SMOKE DETECTORS AND
MECHANICAL EQUIPMENT TO BE CENTERED WITHIN A.C.T.,
CEILING PANEL OR ROOM CEILING AREA U.N.O.
J. FIRE SPRINKLER HEADS SHALL BE RELOCATED AS REQUIRED.
K. PROTECT ALL EQUIPMENT THAT IS TO REMAIN IN PLACE.
L. REFER TO A-501 FOR ALL CEILING DETAILS.
M. REFER TO A-601 FOR ALL ROOF DETAILS.
General Notes:
SCALE:
ENLARGED RCP BLDG A.
1/4" = 1'-0"1SCALE:
ENLARGED RCP BLDG B.
1/4" = 1'-0"2
A-601
A-601
SCALE:
A-WING ROOF PLAN - PARTIAL NEW WORK PLAN
1/8" = 1'-0"1
AESUSAESUS
Architecture, Engineering, and Sustainable Design design
AESUS
group
KEY PLAN NTS
BLDG A
BLDG B
KEY NOTES
1. RE-INSTALL, REPAIR, AND/OR REPLACE THE CEILING AND
ASSOCIATED COMPONENTS TO ORIGINAL CONDITION. MATCH
EXISTING AS REQUIRED.
2. INSTALL NEW MECHANICAL DIFFUSER, SEE MECHANICAL FOR MORE
INFO. PATCH AND REPAIR ADJACENT CEILING AS REQUIRED.
3. NEW MECHANICAL EQUIPMENT WITH PRE-FABRICATED ROOF
CURBS, SEE DETAILS ON SHEET A-601 AND MECHANICAL FOR
ADDITIONAL INFO.
4. RE-INSTALL SALVAGED ROOF WALK PADS AS REQUIRED.
5. EXISTING ROOF CRICKET TO REMAIN, TYPICAL.
6. EXISTING ROOF DRAIN TO REMAIN, TYPICAL.
7. PATCH AND REPAIR THE EXISTING ROOF REQUIRED AT NEW
EQUIPMENT LOCATIONS. ALL NEW ROOFING SHALL BE INSTALLED
ACCORDING TO THE MANUFACTURERS SPECIFICATIONS. MAINTAIN
EXISTING ROOF SLOPE. ALL ROOF WORK SHALL NOT VOID ANY
EXISTING MANUFACTURE AND WARRANTIES. THE GC SHALL VERIFY
WITH OWNER PRIOR TO THE START OF ANY NEW ROOF WORK.
8. PROVIDE NEW ROOF WALK PADS AS REQUIRED.
9. INSTALL NEW CEILING TILES AND ASSOCIATED COMPONENTS,
TYPICAL. SEE DETAIL ON SHEET A-501.
GYPSUM BOARD CEILING
GYP
MECHANICAL SUPPLY DIFFUSER
MECHANICAL RETURN/EXHAUST
2'x2' FIXTURES -SEE ELECTRICAL
INDICATES KEY NOTE ON THIS DRAWING
SPRINKLER HEAD
GYPSUM WALL BOARD
Legend:
X
2'x2' ACOUSTICAL CEILING TILE
HEIGHT ABOVE FINISH FLOOR+9'-6"
FINISH
DOWN LIGHT -SEE ELECTRICAL
ACT ACOUSTICAL CEILING TILE
EQUIPMENT & FURNITURE
PATIENT LIFT
CURTAIN TRACK
WALL PROTECTION
A. NOT ALL KEYNOTES WILL BE USED ON ALL SHEETS.
B. NEW WALLS TO EXTENDED TO UNDERSIDE OF THE FLOOR SLAB
ABOVE.
C. SEAL ALL PENETRATIONS AND OPENINGS THROUGH WALLS,
FLOORS, AND CEILINGS TO MATCH RATING.
D. ALL EXISTING STRUCTURAL COLUMNS AND BEAMS TO REMAIN
AND SHALL NOT BE MODIFIED.
E. ALL MECHANICAL CHASES SHALL BE COORDINATED WITH
MECHANICAL, PLUMBING, & ELECTRICAL DRAWINGS.
F. ALL WORK TO BE IN COMPLIANCE WITH NATIONAL AND LOCAL
BUILDING SAFETY CODES.
G. DIMENSIONS ARE FROM FINISHED SURFACES.
H. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
I. LIGHT FIXTURES, SPRINKLER HEADS, SMOKE DETECTORS AND
MECHANICAL EQUIPMENT TO BE CENTERED WITHIN A.C.T.,
CEILING PANEL OR ROOM CEILING AREA U.N.O.
J. FIRE SPRINKLER HEADS SHALL BE RELOCATED AS REQUIRED.
K. PROTECT ALL EQUIPMENT THAT IS TO REMAIN IN PLACE.
L. REFER TO A-501 FOR ALL CEILING DETAILS.
M. REFER TO A-601 FOR ALL ROOF DETAILS.
General Notes:
SCALE:SCALE:
SCALE:
SCALE: SCALE:
SCALE:
FREE SIDE
FIXED SIDE
FI
XE
D S
ID
E
FR
EE
S
ID
E
SCALE:
Architecture, Engineering, and Sustainable Design design
AESUS
group
ARCHITECTURAL DETAILS
A-501
AESUSAESUS
CONT 1/2"
TREATED
PLYWOOD
GUSSET
VERTICAL TREATED
WOOD BLOCKING AT
16" OC MAX - FILL
VOIDS WITH
INSULATION
SPACER
BLOCKS AT 18"
OC - FILL VOIDS
WITH
INSULATION
TOP OF ROOF
DECK
ROOF INSULATION
(TYP)
CONT TREATED
WOOD CANT
(TYP)CONT TREATED
WOOD NAILER
(TYP)
#10 SELF TAPPING
SCREWS AT 9" OC
STAGGERED
(STEEL DECK - TYP)
1/4" DIA EXP ANCHORS
2" MINIMUM
EMBEDMENT AT 18" OC
MAX (CONCRETE
DECK - TYP)
NAILER
CONFIGURATION
WHERE ROOF
INSULATION THICKNESS
IS CONSTANT OR
MINIMUM THICKNESS
NAILER CONFIGURATION
WHERE ROOF
INSULATION THICKNESS
IS GREATER THAN 3"
AND LESS THAN 6"
NAILER
CONFIGURATION
WHERE ROOF
INSULATION
THICKNESS IS
GREATER THAN 6"
ALL CONT
TREATED WOOD
NAILERS ARE TO
BE 2 X 6
CONT RUBBERIZED
ASPHALT
UNDERLAYMENT
TREATED WOOD NAILER
ROOFING SYSTEM
22 GA X 6" CLOSURE
PLATE CONT
AROUND OPENING
CONT WOOD CANT STRIP
REGLET AND
COUNTERFLASHING
ROOF HATCH AND INSULATED
CURB W/ ANCHORAGE
SYSTEM
GASKETED FASTENERS
AT 12" OC MAX
1'
0”
4"
SEALANT - TOOL TO
FACILITATE WATER RUN-
OFF
1" STAINLESS STEEL
DRAW BAND
SHEET METAL BONNET
SHEET METAL FLASHING
COLLAR
ROOFING CEMENT
1/2"
1/2"
6" MIN
4" 5"
M
IN
1'
/3 2"
CONTRACTOR TO DETERMINE ACTUAL
HEIGHT REQUIRED BY FINAL ROOF
INSULATION THICKNESS
SEAL AROUND PLUMBING
VENT WITH COMPATIBLE
SEALANT
4"
ROOFING CEMENT
SHEET METAL
FLASHING COLLAR
SHEET METAL
BONNET
1" STAINLESS STEEL
DRAW BAND
SEALANT - TOOL TO
FACILITATE WATER RUN-
OFF
SAFETY TIEBACK (BY
EXT BLDG MAINT MFR)
CONTRACTOR TO DETERMINE ACTUAL
HEIGHT REQUIRED BY FINAL ROOF
INSULATION THICKNESS
1/2"
1'
3/
8"
1/2"
6" MIN
4" M
IN2"
TREATED WOOD
NAILER
PREFABRICATED
INSULATED,
MECHANICAL ROOF
CURB ANCHORED TO
NAILER
REGLET AND
COUNTERFLASHING
CONT 1 1/2" NEOPRENE
CUSHION
MECHANICAL EQUIPMENT
1'
0" M
IN
" M
IN
C U
R B
TO
B
E C
U
ST
O M
H
EI
G H
T
TO
C O
O R
D
IN
AT
E
W
IT
H R
O O
F
SL
O
PE
C O
N D
IT
IO
N
REFER TO SPECIFIC DETAILS
FOR REGLET FLANGE
CONFIGURATIONS
PROVIDE CONT 6" WIDE X 20 GA
STRAP AT CONDITIONS WHERE
STEEL STUDS WITH 5/8" ROOF
COVER BOARD UNITS IS USED
GASKETED FASTENERS
AT 12" OC
SHEET METAL TWO
PIECE REGLET AND
COUNTERFLASHING
SYSTEM
FASTENERS WITH
ANCHOR DISCS AT 6"
OC MAX OR CONT
TERMINATION BAR
WIND CLIPS AT 30" OC
TREATED WOOD NAILER
5" 1"
" M
IN
5"
INSULATE PIPING
PER MEP
SEAL IF NOT HIGH
TEMPERATURE
PIPING
SLEEVE - SEAL SLEEVE
TO BOX
REGLET AND COUNTER
FLASHING
PREFABRICATED
INSULATED ROOF
CURB ANCHORED TO
WOOD NAILER
FILL VOID WITH
MINERAL WOOL
INSULATION -
SUPPORT WITH
POULTRY NETTING
16 GA GALVANIZED
METAL ENCLOSURE
TREATED WOOD
NAILER
GENERAL NOTE:
SEAL ALL SEAMS, JOINTS,
AND FASTENER
PENETRATIONS - PROVIDE
STIFFENERS AND CROSS
BRACING AS NEEDED TO
PREVENT BENDING
VARIES
SLOPE
ROOFING SYSTEM
GASKETED
FASTENERS AT 12"
OC MAX
SLOPE 1/4" / FT MIN 1' - 0"
VA
R
IE
S
3"
" M
INSPRAYED VAPOR
RETARDER
SCALE:
SCALE:
SCALE:
SCALE:
SCALE:
SCALE:
SCALE:
Architecture, Engineering, and Sustainable Design design
AESUS
group
AESUSAESUS
SCALE:
and Sustainable Design design
AESUS
group
AESUSAESUS
2021.09.22
A-901
BUILDING A
OVERALL FLOOR PLAN
M100
Architecture, Engineering, and Sustainable Design design
AESUS
group
SCALE:
A-WING - OVERALL PLAN
1/8" = 1'-0"
GENERAL NOTES
1. LIGHTING AND SPRINKLER HEADS TAKE PRECEDENCE OVER
DIFFUSER LOCATION. CONTRACTOR SHALL MAKE NECESSARY
ADJUSTMENT TO DIFFUSERS TO AVOID ANY CONFLICT WITH
LIGHTING LAYOUT AND SPRINKLER HEADS.
2. THERMOSTATS SHALL BE MOUNTED PER ADA REQUIREMENTS.
MAXIMUM HEIGHT FOR FRONT ACCESS SHALL BE 48" AFF. DO
NOT MOUNT ABOVE FIXED COUNTER UNLESS KNEE HOLE
ACCESS IS PROVIDED.
3. CONTRACTOR SHALL COORDINATE ALL FINAL THERMOSTAT
LOCATIONS WITH OWNER AND ARCHITECT PRIOR TO
MOUNTING.
4. THE CONTRACTOR SHALL DO ALL NECESSARY CUTTING OF
WALL AND CEILINGS.
5. NO STRUCTURAL MEMBER SHALL BE CUT WITHOUT
PERMISSION FROM THE ENGINEER.
6. OPENINGS IN FLOORS, WALLS, CEILINGS, ROOFS, ETC. AS A
RESULT OF REMOVED PIPING, DUCTWORK, FLUES,
EQUIPMENT, FIXTURES, ETC SHALL BE PATCHED TO MATCH
EXISTING BUILDING CONSTRUCTION. WORK SHALL BE
PERFORMED BY CRAFTSMEN SKILLED IN THEIR RESPECTIVE
TRADES.
7. DUCTWORK CONSTRUCTION AND INSTALLATION INCLUDING
SHEET METAL GAUGES, REINFORCEMENT, JOINT SEALING, AIR
LEAKAGE, AND DETAILS NOT SPECIFICALLY SHOWN ON
DRAWINGS SHALL BE IN ACCORDANCE WITH CURRENT IMC &
VA DUCT CONSTRUCTION STANDARDS.
8. CONTRACTOR SHALL PROVIDE COORDINATION FOR
DUCTWORK ROUTE DRAWINGS, THIS MUST BE APPROVED BY
ENGINEER PRIOR TO CONSTRUCTION.
9. DUCTWORK AND PIPING SHALL BE INSTALLED TIGHT TO THE
CRAWL SPACE CEILING WHEN POSSIBLE FOR MAINTENANCE
ACCESSIBILITY. CONTRACTOR SHALL WALK THE CRAWL
SPACE AND VERIFY THE LAYOUT OF THE DUCTWORK PRIOR TO
BIDDING THE PROJECT.
10. PRIOR TO PURCHASING HVAC UNIT, CONTRACTOR SHALL
COORDINATE WITH VA CONTRACTING, VA FACILITIES, AND AE
FIRM TO DEVELOP A PLAN FOR INSTALLING OF THE NEW UNIT
THAT MINIMIZES THE INSTALLATION TIME OF THE UNIT.
11. ALONG WITH PHASING, THE CONTRACTORS SHALL BE
PREPARED TO PROVIDE TEMPORARY HVAC FOR AREAS
AFFECTED BY SCOPE OF WORK.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTING OPENING
AND RESPONSIBLE FOR ANY DAMAGE CAUSED BY
CONSTRUCTION METHODS.
13. CONTRACTOR SHALL PERFORM LEAK TEST ON ROOF AFTER
CONSTRUCTION IS COMPLETE AND REPAIR THE ROOF AS
NECESSARY.
MH100
MD100
B-WING - OVERALL PLAN
1/8" = 1'-0"
BUILDING B
OVERALL FLOOR PLAN
M101
Architecture, Engineering, and Sustainable Design design
AESUS
group
GENERAL NOTES
1. LIGHTING AND SPRINKLER HEADS TAKE PRECEDENCE OVER
DIFFUSER LOCATION. CONTRACTOR SHALL MAKE NECESSARY
ADJUSTMENT TO DIFFUSERS TO AVOID ANY CONFLICT WITH
LIGHTING LAYOUT AND SPRINKLER HEADS.
2. THERMOSTATS SHALL BE MOUNTED PER ADA REQUIREMENTS.
MAXIMUM HEIGHT FOR FRONT ACCESS SHALL BE 48" AFF. DO
NOT MOUNT ABOVE FIXED COUNTER UNLESS KNEE HOLE
ACCESS IS PROVIDED.
3. CONTRACTOR SHALL COORDINATE ALL FINAL THERMOSTAT
LOCATIONS WITH OWNER AND ARCHITECT PRIOR TO
MOUNTING.
4. THE CONTRACTOR SHALL DO ALL NECESSARY CUTTING OF
WALL AND CEILINGS.
5. NO STRUCTURAL MEMBER SHALL BE CUT WITHOUT
PERMISSION FROM THE ENGINEER.
6. OPENINGS IN FLOORS, WALLS, CEILINGS, ROOFS, ETC. AS A
RESULT OF REMOVED PIPING, DUCTWORK, FLUES,
EQUIPMENT, FIXTURES, ETC SHALL BE PATCHED TO MATCH
EXISTING BUILDING CONSTRUCTION. WORK SHALL BE
PERFORMED BY CRAFTSMEN SKILLED IN THEIR RESPECTIVE
TRADES.
7. DUCTWORK CONSTRUCTION AND INSTALLATION INCLUDING
SHEET METAL GAUGES, REINFORCEMENT, JOINT SEALING, AIR
LEAKAGE, AND DETAILS NOT SPECIFICALLY SHOWN ON
DRAWINGS SHALL BE IN ACCORDANCE WITH CURRENT IMC &
VA DUCT CONSTRUCTION STANDARDS.
8. CONTRACTOR SHALL PROVIDE COORDINATION FOR
DUCTWORK ROUTE DRAWINGS, THIS MUST BE APPROVED BY
ENGINEER PRIOR TO CONSTRUCTION.
9. DUCTWORK AND PIPING SHALL BE INSTALLED TIGHT TO THE
CRAWL SPACE CEILING WHEN POSSIBLE FOR MAINTENANCE
ACCESSIBILITY. CONTRACTOR SHALL WALK THE CRAWL
SPACE AND VERIFY THE LAYOUT OF THE DUCTWORK PRIOR TO
BIDDING THE PROJECT.
10. PRIOR TO PURCHASING HVAC UNIT, CONTRACTOR SHALL
COORDINATE WITH VA CONTRACTING, VA FACILITIES, AND AE
FIRM TO DEVELOP A PLAN FOR INSTALLING OF THE NEW UNIT
THAT MINIMIZES THE INSTALLATION TIME OF THE UNIT.
11. ALONG WITH PHASING, THE CONTRACTORS SHALL BE
PREPARED TO PROVIDE TEMPORARY HVAC FOR AREAS
AFFECTED BY SCOPE OF WORK.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTING OPENING
AND RESPONSIBLE FOR ANY DAMAGE CAUSED BY
CONSTRUCTION METHODS.
13. CONTRACTOR SHALL PERFORM LEAK TEST ON ROOF AFTER
CONSTRUCTION IS COMPLETE AND REPAIR THE ROOF AS
NECESSARY.
MH100
MD100
ENLARGED DEMOLITION
FLOOR PLANS
MD100
Architecture, Engineering, and Sustainable Design design
AESUS
group
DEMOLITION GENERAL NOTES:
1. ALL WORK SHALL BE PERFORMED IN A CLEAN AND
WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO
MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER
AREAS OF THE BUILDING WHICH ARE TO REMAIN IN
OPERATION.
2. ALL UTILITY OR SYSTEM SHUTDOWNS SHALL BE
COORDINATED WITH THE OWNER AND ENGINEER. NO
SHUTDOWNS CAN OCCUR WITHOUT PRIOR PERMISSION FROM
THE OWNER.
3. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND
FIELD CONDITIONS PRIOR TO PROCEEDING WITH ANY WORK.
ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER
FOR RESOLUTION.
4. THE EXISTING CONDITIONS ARE BASED ON "AS-BUILT"
DRAWINGS AND LIMITED FIELD VERIFICATIONS. THE
CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS
AT NO ADDITIONAL EXPENSE TO THE PROJECT. NO ADDITION
COMPENSATION WILL BE PROVIDED FOR ANY EXTRAS DUE TO
THE CONTRACTOR'S FAILURE TO VISIT THE PROJECT SITE OR
PREDETERMINATION OF EXISTING CONDITIONS PRIOR TO
SUBMITTING THE BID. ANY DISCREPANCIES SHALL BE
IMMEDIATELY REPORTED TO THE ARCHITECT/ENGINEER FOR
RESOLUTION.
5. ALL WORK SHALL CONFORM TO THE LOCAL AND STATE
BUILDING CODE AND ORDINANCES.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
THEIR PORTION OF THE WORK WITH OTHER PORTIONS OF
WORK BY OTHER TRADES.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION
MEANS, METHODS, TECHNIQUES, AND SAFETY TO THE PUBLIC
AND TO PROPERTY BOTH PRIVATE AND PUBLIC.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE
REMOVAL OF ALL EXISTING EQUIPMENT, PIPING, AND DEVICES
NOT REQUIRED FOR THE WORK AND NOT SHOWN AS EXISTING
TO REMAIN AS INDICATED ON DRAWINGS. DRAWINGS ARE
SCHEMATIC IN NATURE AND INDICATE MAJOR ITEMS OF
EXISTING EQUIPMENT AND SYSTEMS. THE CONTRACTOR
SHALL VISIT THE SITE TO DETERMINE THE EXTENT OF
EXISTING EQUIPMENT, PIPING, AND DEVICES TO BE REMOVED.
9. ALL SHUT DOWNS AND DEMOLITION SHALL BE PHASED AND
COORDINATED WITH NEW WORK. CONTRACTOR SHALL BE
RESPONSIBLE FOR COORDINATION SHUT DOWNS AND
REMOVAL OF ITEMS WITH THE OWNER'S REPRESENTATIVE
AND THE OWNER'S PHASING REQUIREMENTS.
10. OPENINGS IN FLOORS, WALLS, CEILINGS, ROOFS, ETC. AS A
RESULT OF REMOVED PIPING, DUCTWORK, FLUES,
EQUIPMENT, FIXTURES, ETC SHALL BE PATCHED TO MATCH
EXISTING BUILDING CONSTRUCTION. WORK SHALL BE
PERFORMED BY CRAFTSMEN SKILLED IN THEIR RESPECTIVE
TRADES.
11. THE INTENT OF THE DEMOLITION IS TO REMOVE THE ITEMS IN
THEIR ENTIRETY TO INCLUDE ALL ASSOCIATED SUPPORT
BASES, ANCHORAGE, HANGERS, CONTROLS, PIPING, ETC. AND
CAP EXISTING SYSTEM TO REMAIN AT MAINS OR OTHER
ACTIVE BRANCH LINES. MINIMIZE DEAD-END LENGTHS.
12. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE
REUSED IN NW SYSTEMS, EXCEPT WHERE INDICATED AS
BEING RELOCATED.
13. ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF OFF THE
SITE; COORDINATE WITH OWNER, ARCHITECT, AND DIVISION 1
REQUIREMENTS, LIMITS, ETC. ON ON-SITE DUMPSTERS. USE
OF OWNER'S TRASH DUMPSTERS FOR DISPOSAL OF
DEMOLISHED WILL NOT BE PERMITTED.
SCALE:
ENLARGED FLOOR PLAN
1/2" = 1'-0"
(X) VAV10
(E) VAV09
125 CFM
CLEAN UTILITY
A-126
STERILE
PROCESS
A-120
CORRIDOR
A-164
SOILED
A-113
(E) CD
150 CFM
(X) CD
(E) CD
75 CFM
E x
E x
E x
E
Ø
FILM STORES
B-126
HC DRESS
B-103A
HC DRESS
B-103
PATIENT
TOILET
B-109
STORAGE
B-125
TELE-COMM
B-168
JANITOR'S
CLOSET
B-167
ELECTRICAL
B-165
RADIOLOGY
B-112
DARK ROOM
B-104
CONSULT
B-120
CORRIDOR
B-211
(X) VAV36
(X) VAV41
SCALE:
ENLARGED FLOOR PLAN
1/2" = 1'-0"
(X) 5"Ø
E
Ø
E
Ø
(E) CD
200 CFM
(E) CD
200 CFM
(E) CD
210 CFM
(E) CD
100 CFM
(E) CD
240 CFM
(E) CD
240 CFM
(E) CD
100 CFM
(E) 12"x12"
(E) 16"x16"
(E) CD
100 CFM
(E) CD
250 CFM
(X) CD
250 CFM
(E) 14"x10"
X x
(E) 6"Ø
(X) 8"Ø
(E) CD
125 CFM
KEY NOTES
1. DEMOLISH EXISTING DIFFUSER.
2. DEMOLISH EXISTING TERMINAL UNIT.
BUILDING A ROOF PLAN
DEMOLITION PLAN
MD200
Architecture, Engineering, and Sustainable Design design
AESUS
group
SCALE:
A-WING ROOF PLAN - PARTIAL NEW WORK PLAN
1/8" = 1'-0"
DEMOLITION GENERAL NOTES:
1. ALL WORK SHALL BE PERFORMED IN A CLEAN AND
WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO
MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER
AREAS OF THE BUILDING WHICH ARE TO REMAIN IN
OPERATION.
2. ALL UTILITY OR SYSTEM SHUTDOWNS SHALL BE
COORDINATED WITH THE OWNER AND ENGINEER. NO
SHUTDOWNS CAN OCCUR WITHOUT PRIOR PERMISSION FROM
THE OWNER.
3. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND
FIELD CONDITIONS PRIOR TO PROCEEDING WITH ANY WORK.
ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER
FOR RESOLUTION.
4. THE EXISTING CONDITIONS ARE BASED ON "AS-BUILT"
DRAWINGS AND LIMITED FIELD VERIFICATIONS. THE
CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS
AT NO ADDITIONAL EXPENSE TO THE PROJECT. NO ADDITION
COMPENSATION WILL BE PROVIDED FOR ANY EXTRAS DUE TO
THE CONTRACTOR'S FAILURE TO VISIT THE PROJECT SITE OR
PREDETERMINATION OF EXISTING CONDITIONS PRIOR TO
SUBMITTING THE BID. ANY DISCREPANCIES SHALL BE
IMMEDIATELY REPORTED TO THE ARCHITECT/ENGINEER FOR
RESOLUTION.
5. ALL WORK SHALL CONFORM TO THE LOCAL AND STATE
BUILDING CODE AND ORDINANCES.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
THEIR PORTION OF THE WORK WITH OTHER PORTIONS OF
WORK BY OTHER TRADES.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION
MEANS, METHODS, TECHNIQUES, AND SAFETY TO THE PUBLIC
AND TO PROPERTY BOTH PRIVATE AND PUBLIC.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE
REMOVAL OF ALL EXISTING EQUIPMENT, PIPING, AND DEVICES
NOT REQUIRED FOR THE WORK AND NOT SHOWN AS EXISTING
TO REMAIN AS INDICATED ON DRAWINGS. DRAWINGS ARE
SCHEMATIC IN NATURE AND INDICATE MAJOR ITEMS OF
EXISTING EQUIPMENT AND SYSTEMS. THE CONTRACTOR
SHALL VISIT THE SITE TO DETERMINE THE EXTENT OF
EXISTING EQUIPMENT, PIPING, AND DEVICES TO BE REMOVED.
9. ALL SHUT DOWNS AND DEMOLITION SHALL BE PHASED AND
COORDINATED WITH NEW WORK. CONTRACTOR SHALL BE
RESPONSIBLE FOR COORDINATION SHUT DOWNS AND
REMOVAL OF ITEMS WITH THE OWNER'S REPRESENTATIVE
AND THE OWNER'S PHASING REQUIREMENTS.
10. OPENINGS IN FLOORS, WALLS, CEILINGS, ROOFS, ETC. AS A
RESULT OF REMOVED PIPING, DUCTWORK, FLUES,
EQUIPMENT, FIXTURES, ETC SHALL BE PATCHED TO MATCH
EXISTING BUILDING CONSTRUCTION. WORK SHALL BE
PERFORMED BY CRAFTSMEN SKILLED IN THEIR RESPECTIVE
TRADES.
11. THE INTENT OF THE DEMOLITION IS TO REMOVE THE ITEMS IN
THEIR ENTIRETY TO INCLUDE ALL ASSOCIATED SUPPORT
BASES, ANCHORAGE, HANGERS, CONTROLS, PIPING, ETC. AND
CAP EXISTING SYSTEM TO REMAIN AT MAINS OR OTHER
ACTIVE BRANCH LINES. MINIMIZE DEAD-END LENGTHS.
12. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE
REUSED IN NW SYSTEMS, EXCEPT WHERE INDICATED AS
BEING RELOCATED.
13. ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF OFF THE
SITE; COORDINATE WITH OWNER, ARCHITECT, AND DIVISION 1
REQUIREMENTS, LIMITS, ETC. ON ON-SITE DUMPSTERS. USE
OF OWNER'S TRASH DUMPSTERS FOR DISPOSAL OF
DEMOLISHED WILL NOT BE PERMITTED.
(X) AC-1
(X) AC-2
KEY NOTES
1. DEMOLISH EXISTING AIR HANDLING UNIT. CONTRACTOR SHALL
CONFIGURE EXISTING DUCTWORK TO FIT NEW UNIT.
CONTRACTOR SHALL SEAL ALL DUCTWORK DURING
CONSTRUCTION TO PREVENT WATER AND DUST FROM
ENTERING THE SYSTEM.
BUILDING B ROOF PLAN
DEMOLITION PLAN
MD201
Architecture, Engineering, and Sustainable Design design
AESUS
group
SCALE:
B-WING ROOF PLAN - PARTIAL NEW WORK PLAN
1/8" = 1'-0"
DEMOLITION GENERAL NOTES:
1. ALL WORK SHALL BE PERFORMED IN A CLEAN AND
WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO
MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER
AREAS OF THE BUILDING WHICH ARE TO REMAIN IN
OPERATION.
2. ALL UTILITY OR SYSTEM SHUTDOWNS SHALL BE
COORDINATED WITH THE OWNER AND ENGINEER. NO
SHUTDOWNS CAN OCCUR WITHOUT PRIOR PERMISSION FROM
THE OWNER.
3. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND
FIELD CONDITIONS PRIOR TO PROCEEDING WITH ANY WORK.
ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER
FOR RESOLUTION.
4. THE EXISTING CONDITIONS ARE BASED ON "AS-BUILT"
DRAWINGS AND LIMITED FIELD VERIFICATIONS. THE
CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS
AT NO ADDITIONAL EXPENSE TO THE PROJECT. NO ADDITION
COMPENSATION WILL BE PROVIDED FOR ANY EXTRAS DUE TO
THE CONTRACTOR'S FAILURE TO VISIT THE PROJECT SITE OR
PREDETERMINATION OF EXISTING CONDITIONS PRIOR TO
SUBMITTING THE BID. ANY DISCREPANCIES SHALL BE
IMMEDIATELY REPORTED TO THE ARCHITECT/ENGINEER FOR
RESOLUTION.
5. ALL WORK SHALL CONFORM TO THE LOCAL AND STATE
BUILDING CODE AND ORDINANCES.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
THEIR PORTION OF THE WORK WITH OTHER PORTIONS OF
WORK BY OTHER TRADES.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION
MEANS, METHODS, TECHNIQUES, AND SAFETY TO THE PUBLIC
AND TO PROPERTY BOTH PRIVATE AND PUBLIC.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE
REMOVAL OF ALL EXISTING EQUIPMENT, PIPING, AND DEVICES
NOT REQUIRED FOR THE WORK AND NOT SHOWN AS EXISTING
TO REMAIN AS INDICATED ON DRAWINGS. DRAWINGS ARE
SCHEMATIC IN NATURE AND INDICATE MAJOR ITEMS OF
EXISTING EQUIPMENT AND SYSTEMS. THE CONTRACTOR
SHALL VISIT THE SITE TO DETERMINE THE EXTENT OF
EXISTING EQUIPMENT, PIPING, AND DEVICES TO BE REMOVED.
9. ALL SHUT DOWNS AND DEMOLITION SHALL BE PHASED AND
COORDINATED WITH NEW WORK. CONTRACTOR SHALL BE
RESPONSIBLE FOR COORDINATION SHUT DOWNS AND
REMOVAL OF ITEMS WITH THE OWNER'S REPRESENTATIVE
AND THE OWNER'S PHASING REQUIREMENTS.
10. OPENINGS IN FLOORS, WALLS, CEILINGS, ROOFS, ETC. AS A
RESULT OF REMOVED PIPING, DUCTWORK, FLUES,
EQUIPMENT, FIXTURES, ETC SHALL BE PATCHED TO MATCH
EXISTING BUILDING CONSTRUCTION. WORK SHALL BE
PERFORMED BY CRAFTSMEN SKILLED IN THEIR RESPECTIVE
TRADES.
11. THE INTENT OF THE DEMOLITION IS TO REMOVE THE ITEMS IN
THEIR ENTIRETY TO INCLUDE ALL ASSOCIATED SUPPORT
BASES, ANCHORAGE, HANGERS, CONTROLS, PIPING, ETC. AND
CAP EXISTING SYSTEM TO REMAIN AT MAINS OR OTHER
ACTIVE BRANCH LINES. MINIMIZE DEAD-END LENGTHS.
12. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE
REUSED IN NW SYSTEMS, EXCEPT WHERE INDICATED AS
BEING RELOCATED.
13. ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF OFF THE
SITE; COORDINATE WITH OWNER, ARCHITECT, AND DIVISION 1
REQUIREMENTS, LIMITS, ETC. ON ON-SITE DUMPSTERS. USE
OF OWNER'S TRASH DUMPSTERS FOR DISPOSAL OF
DEMOLISHED WILL NOT BE PERMITTED.
(X) CU-1
(X) CU-2
(X) AH-2
(X) AH-1
KEY NOTES
1. DEMOLISH EXISTING AIR HANDLING UNIT. CONTRACTOR SHALL
CONFIGURE EXISTING DUCTWORK TO FIT NEW UNIT.
CONTRACTOR SHALL SEAL ALL DUCTWORK DURING
CONSTRUCTION TO PREVENT WATER AND DUST FROM
ENTERING THE SYSTEM.
ENLARGED FLOOR PLANS
MH100
Architecture, Engineering, and Sustainable Design design
AESUS
group
SCALE:
ENLARGED FLOOR PLAN
1/4" = 1'-0"
KEY NOTES
1. REBALANCE EXISTING VAV BOX AND EXISTING DIFFUSERS TO
TO CFMS LISTED AS INDICATED ON PLANS.
2. MATCH MANUFACTURER AND TYPE WITH EXISTING DIFFUSERS.
3. REPLACE EXISTING HEATING HOT WATER COIL VALVE KIT.
4. EXTEND NEW 3/4" HEATING HOT WATER TO NEW COIL. REPLACE
DDC CONTROLS. REFER TO SCHEDULE FOR MIN AND MAX CFM,
CLEAN AND RE-USE EXISTING PITOT TUBES.
GENERAL NOTES
1. LIGHTING AND SPRINKLER HEADS TAKE PRECEDENCE OVER
DIFFUSER LOCATION. CONTRACTOR SHALL MAKE NECESSARY
ADJUSTMENT TO DIFFUSERS TO AVOID ANY CONFLICT WITH
LIGHTING LAYOUT AND SPRINKLER HEADS.
2. THERMOSTATS SHALL BE MOUNTED PER ADA REQUIREMENTS.
MAXIMUM HEIGHT FOR FRONT ACCESS SHALL BE 48" AFF. DO
NOT MOUNT ABOVE FIXED COUNTER UNLESS KNEE HOLE
ACCESS IS PROVIDED.
3. CONTRACTOR SHALL COORDINATE ALL FINAL THERMOSTAT
LOCATIONS WITH OWNER AND ARCHITECT PRIOR TO
MOUNTING.
4. THE CONTRACTOR SHALL DO ALL NECESSARY CUTTING OF
WALL AND CEILINGS.
5. NO STRUCTURAL MEMBER SHALL BE CUT WITHOUT
PERMISSION FROM THE ENGINEER.
6. OPENINGS IN FLOORS, WALLS, CEILINGS, ROOFS, ETC. AS A
RESULT OF REMOVED PIPING, DUCTWORK, FLUES,
EQUIPMENT, FIXTURES, ETC SHALL BE PATCHED TO MATCH
EXISTING BUILDING CONSTRUCTION. WORK SHALL BE
PERFORMED BY CRAFTSMEN SKILLED IN THEIR RESPECTIVE
TRADES.
7. DUCTWORK CONSTRUCTION AND INSTALLATION INCLUDING
SHEET METAL GAUGES, REINFORCEMENT, JOINT SEALING, AIR
LEAKAGE, AND DETAILS NOT SPECIFICALLY SHOWN ON
DRAWINGS SHALL BE IN ACCORDANCE WITH CURRENT IMC &
VA DUCT CONSTRUCTION STANDARDS.
8. CONTRACTOR SHALL PROVIDE COORDINATION FOR
DUCTWORK ROUTE DRAWINGS, THIS MUST BE APPROVED BY
ENGINEER PRIOR TO CONSTRUCTION.
9. DUCTWORK AND PIPING SHALL BE INSTALLED TIGHT TO THE
CRAWL SPACE CEILING WHEN POSSIBLE FOR MAINTENANCE
ACCESSIBILITY. CONTRACTOR SHALL WALK THE CRAWL
SPACE AND VERIFY THE LAYOUT OF THE DUCTWORK PRIOR TO
BIDDING THE PROJECT.
10. PRIOR TO PURCHASING HVAC UNIT, CONTRACTOR SHALL
COORDINATE WITH VA CONTRACTING, VA FACILITIES, AND AE
FIRM TO DEVELOP A PLAN FOR INSTALLING OF THE NEW UNIT
THAT MINIMIZES THE INSTALLATION TIME OF THE UNIT.
11. ALONG WITH PHASING, THE CONTRACTORS SHALL BE
PREPARED TO PROVIDE TEMPORARY HVAC FOR AREAS
AFFECTED BY SCOPE OF WORK.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTING OPENING
AND RESPONSIBLE FOR ANY DAMAGE CAUSED BY
CONSTRUCTION METHODS.
13. CONTRACTOR SHALL PERFORM LEAK TEST ON ROOF AFTER
CONSTRUCTION IS COMPLETE AND REPAIR THE ROOF AS
NECESSARY.
(N) VAV10
(E) VAV09
125 CFM
CLEAN UTILITY
A-126
STERILE
PROCESS
A-120
CORRIDOR
A-164
SOILED
A-113
(E) CD
150 CFM
(N) CD-1
150 CFM
12"X12"
8" NK
(E) CD
75 CFM
E x
E x
E x
E
Ø
FILM STORES
B-126
HC DRESS
B-103A
HC DRESS
B-103
PATIENT
TOILET
B-109
STORAGE
B-125
TELE-COMM
B-168
JANITOR'S
CLOSET
B-167
ELECTRICAL
B-165
RADIOLOGY
B-112
DARK ROOM
B-104
CONSULT
B-120
CORRIDOR
B-211
(N) VAV36
(N) VAV41
SCALE:
ENLARGED FLOOR PLAN
1/4" = 1'-0"
(N) 6"Ø
E
Ø
E
Ø
(E) CD
200 CFM
(E) CD
200 CFM
(E) CD
210 CFM
(E) CD
100 CFM
(E) CD
240 CFM
(E) CD
240 CFM
(E) CD
100 CFM
(E) 12"x12"
(E) 16"x16"
(E) CD
100 CFM
(E) 14"x10"
N x
(E) 6"Ø
(N) 10"Ø
(E) CD
125 CFM
EXAM WIC
A-111
EXAM #9
A-117
EXAM #8
A-123
EXAM #7
A-130
ISOLATION
EXAM
A-131
EKG
A-124
JANITOR
CLOSET
A-118
STORAGE
A-119
TREAT
A-125
EXAM #1
A-132
EXAM #2
A-133
EXAM #3
A-134
EXAM #4
A-127
EXAM #5
A-121
PT /PAT ED
A-112
CORRIDOR
A-166
(E) VAV14
805 CFM
(E) CD
365 CFM
(E) CD
290 CFM
(E) CD
290 CFM
(E) CD
290 CFM
(E) VAV15
795 CFM
(E) VAV12
760 CFM
(E) CD
235 CFM
(E) CD
225 CFM
(E) CD
300 CFM
(E) VAV08
900 CFM
(E) CD
390 CFM
(E) CD
300 CFM
(E) CD
300 CFM
(E) CD
300 CFM
(E) VAV08
580 CFM
(E) CD
150 CFM
(E) RG
415 CFM
(E) RG
340 CFM
(E) RG
340 CFM
(E) RG
340 CFM
(E) RG
285 CFM
(E) RG
275 CFM
(E) RG
350 CFM
(E) RG
350 CFM
(E) RG
350 CFM
(E) RG
350 CFM
(E) RG
XXX CFM
(E) RG
XXX CFM
(E) RG
340 CFM
(E) CD
65 CFM
(E) CD
75 CFM
(E) CD
150 CFM
MEDS
A-114
COMMS
A-115
CORRIDOR
A-165
(E) CD
215 CFM
(N) CD-1
500 CFM
24"X24"
10" NK
BUILDING A ROOF PLAN
NEW WORK PLAN
MH200
Architecture, Engineering, and Sustainable Design design
AESUS
group
SCALE:
A-WING ROOF PLAN - PARTIAL NEW WORK PLAN
1/8" = 1'-0"
(N) AC-2
(N) AC-1
GENERAL NOTES
1. LIGHTING AND SPRINKLER HEADS TAKE PRECEDENCE OVER
DIFFUSER LOCATION. CONTRACTOR SHALL MAKE NECESSARY
ADJUSTMENT TO DIFFUSERS TO AVOID ANY CONFLICT WITH
LIGHTING LAYOUT AND SPRINKLER HEADS.
2. THERMOSTATS SHALL BE MOUNTED PER ADA REQUIREMENTS.
MAXIMUM HEIGHT FOR FRONT ACCESS SHALL BE 48" AFF. DO
NOT MOUNT ABOVE FIXED COUNTER UNLESS KNEE HOLE
ACCESS IS PROVIDED.
3. CONTRACTOR SHALL COORDINATE ALL FINAL THERMOSTAT
LOCATIONS WITH OWNER AND ARCHITECT PRIOR TO
MOUNTING.
4. THE CONTRACTOR SHALL DO ALL NECESSARY CUTTING OF
WALL AND CEILINGS.
5. NO STRUCTURAL MEMBER SHALL BE CUT WITHOUT
PERMISSION FROM THE ENGINEER.
6. OPENINGS IN FLOORS, WALLS, CEILINGS, ROOFS, ETC. AS A
RESULT OF REMOVED PIPING, DUCTWORK, FLUES,
EQUIPMENT, FIXTURES, ETC SHALL BE PATCHED TO MATCH
EXISTING BUILDING CONSTRUCTION. WORK SHALL BE
PERFORMED BY CRAFTSMEN SKILLED IN THEIR RESPECTIVE
TRADES.
7. DUCTWORK CONSTRUCTION AND INSTALLATION INCLUDING
SHEET METAL GAUGES, REINFORCEMENT, JOINT SEALING, AIR
LEAKAGE, AND DETAILS NOT SPECIFICALLY SHOWN ON
DRAWINGS SHALL BE IN ACCORDANCE WITH CURRENT IMC &
VA DUCT CONSTRUCTION STANDARDS.
8. CONTRACTOR SHALL PROVIDE COORDINATION FOR
DUCTWORK ROUTE DRAWINGS, THIS MUST BE APPROVED BY
ENGINEER PRIOR TO CONSTRUCTION.
9. DUCTWORK AND PIPING SHALL BE INSTALLED TIGHT TO THE
CRAWL SPACE CEILING WHEN POSSIBLE FOR MAINTENANCE
ACCESSIBILITY. CONTRACTOR SHALL WALK THE CRAWL
SPACE AND VERIFY THE LAYOUT OF THE DUCTWORK PRIOR TO
BIDDING THE PROJECT.
10. PRIOR TO PURCHASING HVAC UNIT, CONTRACTOR SHALL
COORDINATE WITH VA CONTRACTING, VA FACILITIES, AND AE
FIRM TO DEVELOP A PLAN FOR INSTALLING OF THE NEW UNIT
THAT MINIMIZES THE INSTALLATION TIME OF THE UNIT.
11. ALONG WITH PHASING, THE CONTRACTORS SHALL BE
PREPARED TO PROVIDE TEMPORARY HVAC FOR AREAS
AFFECTED BY SCOPE OF WORK.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTING OPENING
AND RESPONSIBLE FOR ANY DAMAGE CAUSED BY
CONSTRUCTION METHODS.
13. CONTRACTOR SHALL PERFORM LEAK TEST ON ROOF AFTER
CONSTRUCTION IS COMPLETE AND REPAIR THE ROOF AS
NECESSARY.
CONTROL NOTES
1. REPLACE CONTROLS OF ALL NEW ROOF TOP UNITS.
CONTRACTOR SHALL COORDINATE WITH TRANE CONTROLS
CONTRACTOR. SCOPE OF WORK INCLUDES:
v (4) INTELLIPAK CONTROL RETROFITS
· (1) INSTALL WIRELESS BACNET AIRFI WCI TRANSCEIVER
ON RTU FOR WIRELESS COMMUNICATION
· (1) INSTALL WIRELESS WCS ZONE SENSOR WITH
DISPLAY AND SET POINT ADJUSTMENT
· ADD RTU BACNET POINTS TO SC+ DATABASE
· ADD RTU GRAPHICS TO TRACER SC+
· INTELLIPAKS WILL ALREADY COME FROM THE FACTORY
WITH ON-BOARD CONTROLLERS AND SENSORS. THIS
WILL NOT BE INCLUDED IN THIS BUDGET PROPOSAL.
KEY NOTES
1. CONNECT NEW SUPPLY AIR TO EXISTING SUPPLY AIR.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL
NECESSARY FITTING FOR TRANSITION FROM NEW TO EXISTING.
CONTRACTOR SHALL PROVIDE SHOP DRAWINGS TO ENGINEER
FOR TRANSITION PRIOR TO BUILDING.
2. CONNECT NEW SUPPLY AIR TO EXISTING RETURN AIR.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL
NECESSARY FITTING FOR TRANSITION FROM NEW TO EXISTING.
CONTRACTOR SHALL PROVIDE SHOP DRAWINGS TO ENGINEER
FOR TRANSITION PRIOR TO BUILDING.
3. 1-1/4" HWS/R DOWN THROUGH ROOF. CONNECT TO EXISTING
1-1/4" HWS/R.
4. CONNECT 1" CD TO EXISTING 1" CD.
BUILDING B ROOF PLAN
NEW WORK PLAN
MH201
Architecture, Engineering, and Sustainable Design design
AESUS
group
SCALE:
B-WING ROOF PLAN - PARTIAL NEW WORK PLAN
1/8" = 1'-0"
(N) AC-3
GENERAL NOTES
1. LIGHTING AND SPRINKLER HEADS TAKE PRECEDENCE OVER
DIFFUSER LOCATION. CONTRACTOR SHALL MAKE NECESSARY
ADJUSTMENT TO DIFFUSERS TO AVOID ANY CONFLICT WITH
LIGHTING LAYOUT AND SPRINKLER HEADS.
2. THERMOSTATS SHALL BE MOUNTED PER ADA REQUIREMENTS.
MAXIMUM HEIGHT FOR FRONT ACCESS SHALL BE 48" AFF. DO
NOT MOUNT ABOVE FIXED COUNTER UNLESS KNEE HOLE
ACCESS IS PROVIDED.
3. CONTRACTOR SHALL COORDINATE ALL FINAL THERMOSTAT
LOCATIONS WITH OWNER AND ARCHITECT PRIOR TO
MOUNTING.
4. THE CONTRACTOR SHALL DO ALL NECESSARY CUTTING OF
WALL AND CEILINGS.
5. NO STRUCTURAL MEMBER SHALL BE CUT WITHOUT
PERMISSION FROM THE ENGINEER.
6. OPENINGS IN FLOORS, WALLS, CEILINGS, ROOFS, ETC. AS A
RESULT OF REMOVED PIPING, DUCTWORK, FLUES,
EQUIPMENT, FIXTURES, ETC SHALL BE PATCHED TO MATCH
EXISTING BUILDING CONSTRUCTION. WORK SHALL BE
PERFORMED BY CRAFTSMEN SKILLED IN THEIR RESPECTIVE
TRADES.
7. DUCTWORK CONSTRUCTION AND INSTALLATION INCLUDING
SHEET METAL GAUGES, REINFORCEMENT, JOINT SEALING, AIR
LEAKAGE, AND DETAILS NOT SPECIFICALLY SHOWN ON
DRAWINGS SHALL BE IN ACCORDANCE WITH CURRENT IMC &
VA DUCT CONSTRUCTION STANDARDS.
8. CONTRACTOR SHALL PROVIDE COORDINATION FOR
DUCTWORK ROUTE DRAWINGS, THIS MUST BE APPROVED BY
ENGINEER PRIOR TO CONSTRUCTION.
9. DUCTWORK AND PIPING SHALL BE INSTALLED TIGHT TO THE
CRAWL SPACE CEILING WHEN POSSIBLE FOR MAINTENANCE
ACCESSIBILITY. CONTRACTOR SHALL WALK THE CRAWL
SPACE AND VERIFY THE LAYOUT OF THE DUCTWORK PRIOR TO
BIDDING THE PROJECT.
10. PRIOR TO PURCHASING HVAC UNIT, CONTRACTOR SHALL
COORDINATE WITH VA CONTRACTING, VA FACILITIES, AND AE
FIRM TO DEVELOP A PLAN FOR INSTALLING OF THE NEW UNIT
THAT MINIMIZES THE INSTALLATION TIME OF THE UNIT.
11. ALONG WITH PHASING, THE CONTRACTORS SHALL BE
PREPARED TO PROVIDE TEMPORARY HVAC FOR AREAS
AFFECTED BY SCOPE OF WORK.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTING OPENING
AND RESPONSIBLE FOR ANY DAMAGE CAUSED BY
CONSTRUCTION METHODS.
13. CONTRACTOR SHALL PERFORM LEAK TEST ON ROOF AFTER
CONSTRUCTION IS COMPLETE AND REPAIR THE ROOF AS
NECESSARY.
(N) AC-4
CONTROL NOTES
1. REPLACE CONTROLS OF ALL NEW ROOF TOP UNITS.
CONTRACTOR SHALL COORDINATE WITH TRANE CONTROLS
CONTRACTOR. SCOPE OF WORK INCLUDES:
v (4) INTELLIPAK CONTROL RETROFITS
· (1) INSTALL WIRELESS BACNET AIRFI WCI TRANSCEIVER
ON RTU FOR WIRELESS COMMUNICATION
· (1) INSTALL WIRELESS WCS ZONE SENSOR WITH
DISPLAY AND SET POINT ADJUSTMENT
· ADD RTU BACNET POINTS TO SC+ DATABASE
· ADD RTU GRAPHICS TO TRACER SC+
· INTELLIPAKS WILL ALREADY COME FROM THE FACTORY
WITH ON-BOARD CONTROLLERS AND SENSORS. THIS
WILL NOT BE INCLUDED IN THIS BUDGET PROPOSAL.
KEY NOTES
1. CONNECT NEW SUPPLY AIR TO EXISTING SUPPLY AIR.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL
NECESSARY FITTING FOR TRANSITION FROM NEW TO EXISTING.
CONTRACTOR SHALL PROVIDE SHOP DRAWINGS TO ENGINEER
FOR TRANSITION PRIOR TO BUILDING.
2. CONNECT NEW SUPPLY AIR TO EXISTING RETURN AIR.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL
NECESSARY FITTING FOR TRANSITION FROM NEW TO EXISTING.
CONTRACTOR SHALL PROVIDE SHOP DRAWINGS TO ENGINEER
FOR TRANSITION PRIOR TO BUILDING.
3. CONNECT 1" CD TO EXISTING 1" CD.
BUILDING A CONTROLS
FLOOR PLAN
MH300
Architecture, Engineering, and Sustainable Design design
AESUS
group
SCALE:
A-WING - PARTIAL NEW WORK PLAN
1/8" = 1'-0"
CONTROL NOTES
1. REPLACE CONTROLS OF ALL VAV BOXES. CONTRACTOR SHALL
COORDINATE WITH TRANE CONTROLS CONTRACTOR. SCOPE OF
WORK INCLUDES:
v (1) SUPERVISORY APP TRANE TRACER SC+
· RUN WIRELESS BACNET AIRFI CONTROLS
COMMUNICATION TRUNK TO DESIGNATED
CENTRALIZED COORDINATORS.
· PROVIDE LAPTOP COMPUTER FOR LOCAL SITE ACCESS.
· (8) INSTALL WIRELESS BACNET AIRFI COORDINATORS
FOR COMMUNICATION TO WIRELESS DEVICES.
· INSTALL TRACER SC PANEL WITH DIN RAIL AND POWER
SUPPLY.
· INSTALL TRACER SC+ BUILDING CONTROLLER.
· INSTALL TRACER SC+ 1 YEAR SOFTWARE
MAINTENANCE PLAN.
· INSTALL APPLICATION LICENSES FOR DEVICES.
· CREATE GRAPHICS FOR LOCAL SITE AND REMOTE
ACCESS. (REMOTE ACCESS DEPENDENT ON IT POLICY
AND COOPERATION)
v (45) VAV CONTROL RETROFITS
· (1) INSTALL WIRELESS BACNET AIRFI WCI TRANSCEIVER
ON VAV FOR WIRELESS COMMUNICATION
· (1) INSTALL WIRELESS WCS ZONE SENSOR WITH
DISPLAY AND SET POINT ADJUSTMENT
· (1) INSTALL UC210 VAV CONTROLLER WITH BUILT IN
ACTUATOR
· MOUNT DISCHARGE AIR TEMPERATURE SENSOR TO
MONITOR TEMPERATURE
· ADD VAV BACNET POINTS TO SC+ DATABASE
· ADD VAV GRAPHICS TO TRACER SC+
GENERAL NOTES
1. LIGHTING AND SPRINKLER HEADS TAKE PRECEDENCE OVER
DIFFUSER LOCATION. CONTRACTOR SHALL MAKE NECESSARY
ADJUSTMENT TO DIFFUSERS TO AVOID ANY CONFLICT WITH
LIGHTING LAYOUT AND SPRINKLER HEADS.
2. THERMOSTATS SHALL BE MOUNTED PER ADA REQUIREMENTS.
MAXIMUM HEIGHT FOR FRONT ACCESS SHALL BE 48" AFF. DO
NOT MOUNT ABOVE FIXED COUNTER UNLESS KNEE HOLE
ACCESS IS PROVIDED.
3. CONTRACTOR SHALL COORDINATE ALL FINAL THERMOSTAT
LOCATIONS WITH OWNER AND ARCHITECT PRIOR TO
MOUNTING.
4. THE CONTRACTOR SHALL DO ALL NECESSARY CUTTING OF
WALL AND CEILINGS.
5. NO STRUCTURAL MEMBER SHALL BE CUT WITHOUT
PERMISSION FROM THE ENGINEER.
6. OPENINGS IN FLOORS, WALLS, CEILINGS, ROOFS, ETC. AS A
RESULT OF REMOVED PIPING, DUCTWORK, FLUES,
EQUIPMENT, FIXTURES, ETC SHALL BE PATCHED TO MATCH
EXISTING BUILDING CONSTRUCTION. WORK SHALL BE
PERFORMED BY CRAFTSMEN SKILLED IN THEIR RESPECTIVE
TRADES.
7. DUCTWORK CONSTRUCTION AND INSTALLATION INCLUDING
SHEET METAL GAUGES, REINFORCEMENT, JOINT SEALING, AIR
LEAKAGE, AND DETAILS NOT SPECIFICALLY SHOWN ON
DRAWINGS SHALL BE IN ACCORDANCE WITH CURRENT IMC &
VA DUCT CONSTRUCTION STANDARDS.
8. CONTRACTOR SHALL PROVIDE COORDINATION FOR
DUCTWORK ROUTE DRAWINGS, THIS MUST BE APPROVED BY
ENGINEER PRIOR TO CONSTRUCTION.
9. DUCTWORK AND PIPING SHALL BE INSTALLED TIGHT TO THE
CRAWL SPACE CEILING WHEN POSSIBLE FOR MAINTENANCE
ACCESSIBILITY. CONTRACTOR SHALL WALK THE CRAWL
SPACE AND VERIFY THE LAYOUT OF THE DUCTWORK PRIOR TO
BIDDING THE PROJECT.
10. PRIOR TO PURCHASING HVAC UNIT, CONTRACTOR SHALL
COORDINATE WITH VA CONTRACTING, VA FACILITIES, AND AE
FIRM TO DEVELOP A PLAN FOR INSTALLING OF THE NEW UNIT
THAT MINIMIZES THE INSTALLATION TIME OF THE UNIT.
11. ALONG WITH PHASING, THE CONTRACTORS SHALL BE
PREPARED TO PROVIDE TEMPORARY HVAC FOR AREAS
AFFECTED BY SCOPE OF WORK.
12. CONTRACTOR IS RESPONSIBLE FOR PROTECTING OPENING
AND RESPONSIBLE FOR ANY DAMAGE CAUSED BY
CONSTRUCTION METHODS.
13. CONTRACTOR SHALL PERFORM LEAK TEST ON ROOF AFTER
CONSTRUCTION IS COMPLETE AND REPAIR THE ROOF AS
NECESSARY.
(E) VAV-1
(E) VAV-2
(E) VAV-11
(E) VAV-14
(E) VAV-4
(E) VAV-9
(E) VAV-10
(E) VAV-3
(E) VAV-5
(E) VAV-7
(E) VAV-6
(E) VAV-8
(E) VAV-12
(E) VAV-15
(E) VAV-13
(E) VAV-16
(E) VAV-17
(E) VAV-24
(E) VAV-34
(E) VAV-22
(E) VAV-21
(E) VAV-18
(E) VAV-20
(E) VAV-19
(E) VAV-23
KEY NOTES
1. TRANE TRACER SC+ SYSTEM CONTROLLER
2. NETWORK 2 COORDINATOR 1
3. NETWORK 2 COORDINATOR 2
4. NETWORK 1 COORDINATOR 1
5. NETWORK 1 COORDINATOR 2
6. CONTRACTOR SHALL PERFORM A TAB ON ALL VAV BOXES AND
SHALL VERIFY THAT VAV BOXES ARE BALANCED TO CFM SHOWN
ON THE SCHEDULE.
AutoCAD SHX Text
MATCHLINE
AutoCAD SHX Text
SHEET MH101
AutoCAD SHX Text
SHEET MH100
AutoCAD SHX Text
MATCHLINE
AutoCAD SHX Text
MATCHLINE
AutoCAD SHX Text
SHEET MH100
AutoCAD SHX Text
SHEET MH101
AutoCAD SHX Text
MATCHLINE
AutoCAD SHX Text
EDF
AutoCAD SHX Text
WHL CHR
AutoCAD SHX Text
ALCOVE
AutoCAD SHX Text
ALCOVE
AutoCAD SHX Text
WHL CHR
AutoCAD SHX Text
TEL
AutoCAD SHX Text
CONCESSION
AutoCAD SHX Text E14
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text E.1
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text L
AutoCAD SHX Text M
AutoCAD SHX Text K
AutoCAD SHX Text L.9
AutoCAD SHX Text A.1
AutoCAD SHX Text Drawing Title:
AutoCAD SHX Text Project Title:
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number:
AutoCAD SHX Text Project Number:
AutoCAD SHX Text Drawing Number:
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building A and B
AutoCAD SHX Text NA18SR109C6 and
AutoCAD SHX Text DZ HVAC and DDC Design
AutoCAD SHX Text Location: 6 RD 7586, BLOOMFIELD, NM 87413
AutoCAD SHX Text
DZILTH-NA-O-DITH-HLE HEALTH CENTER
AutoCAD SHX Text 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542
AutoCAD SHX Text
TASK ORDER NO. 75H70121F30004
AutoCAD SHX Text
SEPTEMBER 23, 2021
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
NA18SR107C6
AutoCAD SHX Text
GONZALES
AutoCAD SHX Text t
AutoCAD SHX Text Z
AutoCAD SHX Text D
AutoCAD SHX Text a
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text d
AutoCAD SHX Text e
AutoCAD SHX Text g
AutoCAD SHX Text n
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text i
AutoCAD SHX Text e
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text
ORLANDO E.
AutoCAD SHX Text 54994
AutoCAD SHX Text T
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .