This is a Memorandum for the Record (MFR) documenting a single-source justification for limiting competition under the Simplified Acquisition Threshold (SAT) for a commercial purchase order.
The U.S. Army Contracting Command - Rock Island Arsenal is procuring Upper Carrier Assembly parachutes from Yoland Corporation under Purchase Order Number W53W9L0097360156. This is a new requirement for a commercial item valued between the micro-purchase threshold ($15,000) and the SAT ($350,000), using a fixed-price contract vehicle. The justification cites FAR 12.102(a), establishing that only one source is available. Yoland Corporation is identified as the sole qualified manufacturer because it has successfully completed both First Article Tests (FATs) and Lot Acceptance Tests (LATs) required for Upper Carrier Assembly parachutes. The contracting activity emphasizes that failure to approve this justification would result in serious mission detriment, as production assembly deadlines must be met on time and a qualifying manufacturer is essential. Market research completed on 06/16/2026 identified a second potential manufacturer; however, this competitor has not yet completed the qualifying requirements, which demand 69 FATs and 57 LATs. Public display and synopsis requirements under FAR 5.101 and 5.301 apply and will be followed. The contract employs fixed-price pricing terms and is located within the Continental United States (CONUS).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MFR - Limiting Competition under SAT
For All Actions Over the Micro-Purchase Threshold ($15K*) and Under the Simplified Acquisition Threshold (SAT) Use for FAR Parts 8, 12, 13, or 16, Including Brand Name
1. Contracting Activity:
U.S. Army Contracting Command - Rock Island, Rock Island Arsenal, Rock Island IL 61299-8000.
2. Description of Action:
Nature:
@ New Requirement O Follow-on Requirement O Modification
Acquisition Type:
@ Commercial O Non-Commercial
Location:
@ CONUS
0 OCONUS
Special Circumstances:
[ Not applicable
Active SAT: $350,000 - Standard
Contract Vehicle:
Purchase Order Number Purchase Order Number:
W53W9L0097360156
Pricing:
� Fixed Price D Time & Materials/Labor Hours D Cost Reimbursable
Name of Proposed Contractor(s):
@ Only one Yoland Corporation • contractor:
Any reseller of required brand Enter Brand Name Itemname supp y:
3. Description of Services or Supplies:
In layman's terms, briefly describe the services or supplies to be provided, including make & model number where appropriate. Include quantities of supplies or period of performance for services. Provide information for any options included.
Qualified manufacturer requirements passed first article test, plus build 57 lot acceptance test.
4. Authority: Mark the applicable exception, choose only one
RFO FAR 12.102(a): For acquisitions valued at or below the simplified acquisition threshold (SAT), document the decision that only one source is available and the basis for the decision.
5. Reasons for Authority Cited:
Explain why the intended contractor is the only reasonable source who can provide the required supplies or services. Discuss the unique capabilities, expertise, etc. that support the lack of competition.
Current qualified manufacturer has met First Article Tests (FAT's) and Lot Acceptance Tests (LAT's) requirements for the Upper Carrier Assembly parachutes.
Describe the detrimental effects/serious injury to the mission of the requiring activity or to the government that will result if this justification is not approved and the product or service cannot be provided.
Must be a qualifying manufacturer for the Upper Carrier Assembly parachutes and production assembly deadline must be met on time.
6. Publicizing Contract Actions:
The public display and synopsis requirements of RFO FAR 5.101 and 5.301
@ apply and will be followed, or
O do not apply due to an exception at RFO FAR 5.101(b)(1)
7. Market Research:
Date Market Research Completed:
(Must be within 12 months)
06/16/2026
Provide a listing of sources identified in market research and their qualifications. Specifically addre:
why another contractor identified through market research cannot meet the Government's needs.
Second manufacturer has been identified, but has not yet completed the qualifying requirement, which requires to build 69 First Article Tests (FAT's), plus build 57 Lot Acceptance Tests (LAT's).