B01 Attachment J01 Project Map Attachment.pdf
PDF 207 KB Posted
- Attached to
- Stephenson-Taylor Water Line Extension
- Solicitation number
- 75H70125R00054
About this file
This document is a detailed project map for the Stephenson-Taylor Water Line Extension project in Caddo County, Oklahoma. The map illustrates a water infrastructure project serving four homeowners: Lauren Newell, Keeley Taylor, and Cameron Stephenson. The proposed work includes installing 10,940 feet of 4" PVC/HDPE water main along county streets and private easements, with connections to the existing Caddo County RWD 3 water main. The project involves proposed blow-off valves and a 4" gate valve installation, with specific routing details provided for accessing each home site from Binger, Oklahoma, using HWY 281, Cemetery Road, and E1160 Road. The geographic coordinates are also specified (Lat: 35.333269669N, Long: -98.312010239W), and the project area is located in Township 10N, Range 11W, Section 24.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Homeowner #1: Lauren Newell Address: 15139 CS 2620, Binger, OK 73009 Directions: From Binger, go East on HWY 281 to Cemetery Road. Turn North on Cemetery Road and continue as the road turns into CS 2620. Continue North ¼ mile past E1160 Road. The home is a double wide trailer on the East side of
CS 2620.
Homeowner #2: Keeley Taylor Address: 18070 County Road 1160, Lookeba, Oklahoma 73053
Home 3 & 4 are right next to each other: Cameron Stephenson Address: 18131 E1160 Road, Binger, OK 73009 County: Caddo County, Oklahoma T/R/S: 10N/11W/24 Lat: 35.333269669 (N) Long: ‐98. 312010239 (W) Directions: From Binger, go East on HWY 281 to Cemetery Road. Turn North on Cemetery Road and continue as the road turns into CS 2620. Continue North to E1160 Road. Turn East on E1160 Road and continue ¾ mile to the home at the dead end.
Home #1 to be served
Proposed blow off valves
Home #2, 3, & 4 to be served
Proposed 10,940’ of 4” PVC/HDPE water main installed along the county street and private easements
Connect to existing water main and install proposed 4” gate valve
Caddo Co. RWD 3 existing 3” PVC water main
File details come from the government source that posted it. Updated .