MS1
JANITOR
H326
CONFERENCE
H105 H106
STORAGE
H101
JANITOR
H404
STAIR
H405
ELEVATOR
H411
ELEV EQUIP
H411
H401
TOILET
H301
CONFERENCE
H103
CORRIDOR
H409
CORRIDOR
H407
CORRIDOR
G712
MECHANICAL
H406
BO
D
3"
"x
44"x24"
"x
58"x18"
60"x28"
O U
TS
ID
E
AI
R
Su pp ly A ir
Return Air
BOD: 11' - 8"
Supply Air
AH-9
AH-10
EXISTING
ELECTRICAL
AND CONTROLS
4"
EXISTING 2-1/2"
HWS/HWR & 6"
CWS/CWR UP
EXISTING 1" FIRE
PROTECTION
PIPING
2" Sanitary
4" SANITARY UP
AND DOWN
2" VENT UP AND
DOWN
BO
D
3"
BOD: 12' - 0 1/2"
Return Air
BOD: 9' - 3"
(E) AH-10 VFD
(E) AH-9 VFD
(E)
AHU-9_ISO_TRANS
(E)
AHU-10_ISO_TRANS
EXISTING 72/24
OA DUCT UP TO
OA LOUVER
C W
S/ C
W R
2"
42"x18"
EXISTING 18/14
OA DUCT
EXISTING
HEATING WATER
PIPING
(E) UPS_LAB
(E) OA DAMPER
HWS/HWR
(E) AH-10
Disconnect
MS1
MS1
POINT OF DISCONNECT
POINT OF CONNECTION
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
HEATING WATER SUPPLY PIPING
HEATING WATER RETURN PIPING
MECHANICAL EQUIPMENT
SUPPLY AIR DUCT
RETURN AIR DUCT
OUTSIDE AIR DUCT
ELECTRICAL EQUIPMENT
SCALE:
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
www.ihs.gov
CONSULTANT COMPANY NAME
ADDRESS
PHONE NUMBER
EMAIL ADDRESS
Consultant Website
TASK ORDER NO:
CONTRACT NO:
DIVISION OF FACILITIES MANAGEMENT
115 4TH AVENUE SE, RM 309
ABERDEEN, SD 57401
(605) 226-7451 FAX (605) 226-7580
GREAT PLAINS AREA INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL
HEALTH & ENGINEERING
As indicated
8/ 3/
:5
9:
P M
MECHANICAL
ROOM EXISTING
AS BUILT PLAN
MEP1
PI
N
E R
ID
G
E A
IR
H
A N
D
LE
R
A N
D
U
PG
R
A D
ES
A
SH
R A
E
PFISTER
8-3-2022
129163
1/4" = 1'-0"1 MECHANICAL ROOM EXISTING PLAN
GENERAL NOTE:
THIS SHEET WAS INTENDED FOR
REFERENCE ONLY. NO DEMOLITION
OR NEW CONSTRUCTION IS SHOWN
ON THIS SHEET. IT IS AN OVERALL
PLAN VIEW OF THE EXISTING ROOM.
TEMPERATURE CONTROL
CONTRACTOR SCOPE OF WORK IS
SHOWN ON VARIOUS MEP SHEETS.
TEMPERATURE CONTROL
CONTRACTOR SHALL REVIEW ALL
SHEETS CAREFULLY TO CAPTURE
AND FULLY UNDERSTAND ALL
REQUIRED WORK UNDER THIS
CONTRACT.
No. Description Date
NTS2 LEGEND
MS1
JANITOR
H326
CONFERENCE
H105 H106
STORAGE
H101
JANITOR
H404
STAIR
H405
ELEVATOR
H411
ELEV EQUIP
H411
H401
TOILET
H301
CONFERENCE
H103
CORRIDOR
H409
CORRIDOR
H407
CORRIDOR
G712
MECHANICAL
H406
BO
D
3"
"x
44"x24"
"x
58"x18"
60"x28"
O U
TS
ID
E
AI
R
Su pp ly A ir
Return Air
BOD: 11' - 8"
Supply Air
AH-9
AH-10
4"EXISTING 2-1/2"
HWS/HWR & 6"
CWS/CWR UP
2" Sanitary
42"x18"
BO
D
3"
Return Air
BOD: 9' - 3"
(E) AH-10 VFD
(E) AH-9 VFD
EXISTING 72/24
OA DUCT UP TO
OA LOUVER
2"
23-01
23-01
23-01
23-07
23-01
23-16
23-04
"x
23-05
23-16
23-21
23-21
23-17
23-17
23-18
23-18
MS1
MS1
POINT OF DISCONNECT
POINT OF CONNECTION
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
HEATING WATER SUPPLY PIPING
HEATING WATER RETURN PIPING
MECHANICAL EQUIPMENT
SUPPLY AIR DUCT
RETURN AIR DUCT
OUTSIDE AIR DUCT
ELECTRICAL EQUIPMENT
SCALE:
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
www.ihs.gov
CONSULTANT COMPANY NAME
ADDRESS
PHONE NUMBER
EMAIL ADDRESS
Consultant Website
TASK ORDER NO:
CONTRACT NO:
DIVISION OF FACILITIES MANAGEMENT
115 4TH AVENUE SE, RM 309
ABERDEEN, SD 57401
(605) 226-7451 FAX (605) 226-7580
GREAT PLAINS AREA INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL
HEALTH & ENGINEERING
As indicated
8/ 3/
:5
9:
P M
MECHANICAL
DUCT
DEMOLITION
PLAN
MD1
PI
N
E R
ID
G
E A
IR
H
A N
D
LE
R
A N
D
U
PG
R
A D
ES
A
SH
R A
E
PFISTER
8-3-2022
129163
1/4" = 1'-0"1 MECHANICAL DUCT DEMOLITION PLAN
KEYNOTE LEGEND
VALUE TEXT
23-01 DEMOLISH EXISTING SMOKE DAMPER AND ALL ACCESSORIES.
CAP EXISTING PNEUMATIC AIR LINE AIR TIGHT. PATCH AND SEAL
DUCTWORK AS REQUIRED AND ACCORDING TO THE LATEST
SMACNA STANDARD. REMOVE ALL PNEUMATIC CONTROLS AND
REMOVE ALL POINTS AND GRAPHICS FROM THE BUILDING
AUTOMATION SYSTEM. REMOVE ALL DAMPER NOTIFICATIONS
FROM FIRE ALARM SYSTEM. RE-PROGRAM FIRE ALARM AS
REQUIRED FOR COMPLETE ELLIMINATION OF SMOKE DAMPER
SYSTEM.
23-04 DEMOLISH EXISTING 18/14 OUTSIDE AIR DUCT AND ALL
ACCESSORIES. PATCH AND SEAL DUCTWORK AS REQUIRED AND
ACCORDING TO THE LATEST SMACNA STANDARD. PREPARE FOR
NEW OUTSIDE AIR DUCT CONNECTION ON RETURN MAIN AND
OUTSIDE AIR DUCT. SEE NEW DUCT SHEET MD2 FOR DETAILS.
23-05 DEMOLISH EXISTING 72/24 OUTSIDE AIR DAMPER AND ALL
ACCESSOIRES. PREPARE FOR NEW MODULATING DAMPER IN
SAME LOCATION. SEE REMODEL SHEET MD2 FOR DETAILS.
23-07 DEMOLISH EXISTING STRUCTURAL STEEL SUPPLY FAN MOTOR
MOUNT ASSEMBLY, SUPPORT BASE, AND ALL ACCESSORIES.
COORDINATE WITH IHS STAFF FOR SHUTDOWN OF UNIT. PREPARE
FOR NEW FABRICATED STRUCTURAL STEEL MOTOR MOUNT
ASSEMBLY AND ACCESSORIES. SEE SHEET MF1 FOR NEW
FABRICATED MOTOR ASSEMBLY DETAILS.
23-16 PREPARE RETURN DUCT FOR NEW MODULATING ECONOMIZER
DAMPER. SEE REMODEL SHEET MD2 FOR REQUIREMENTS.
23-17 DEMOLISH EXISTING RETURN AIR AND DISCHARGE AIR
TEMPERATURE AND HUMIDITY SENSORS. PREPARE FOR NEW
DUCT TEMPERATURE AND HUMIDITY SENSORS IN SAME LOCATION.
23-18 DEMOLISH EXISTING MIXED AIR TEMPERATURE SENSOR.
PREPARE FOR NEW MIXED AIR TEMPERATURE SENSOR IN SAME
LOCATION.
23-21 DEMOLISH EXISTING SUPPLY DUCT STATIC PRESSURE SENSOR
AND ALL ACCESSORIES. PREPARE FOR NEW DUCT STATIC
PRESSURE SENSOR IN SAME LOCATION. FIELD VERIFY EXACT
LOCATION. LOCATION SHOWN HERE FOR CAPTURING SCOPE OF
WORK ONLY.
No. Description Date
GENERAL NOTES:
• CONTRACTOR SHALL PLAN TO WORK OUTSIDE THE NORMAML BUSINESS HOURS FROM 8AM -
5PM MST FOR ANY WORK THAT REQUIRES AN AIR HANDLER TO BE SHUT DOWN FOR MORE
THAN 1 HOUR AT A TIME. CONTRACTOR SHALL BID WORK ACCORDINGLY FOR THIS PROVISION
IN ORDER TO WORK AT NIGHT OR ON WEEKENDS.
• TEMPERATURE CONTROL CONTRACTOR SCOPE OF WORK IS SHOWN ON VARIOUS MEP
SHEETS. TEMPERATURE CONTROL CONTRACTOR SHALL REVIEW ALL SHEETS CAREFULLY TO
CAPTURE AND FULLY UNDERSTAND ALL REQUIRED WORK UNDER THIS CONTRACT.
JANITOR
H326
CONFERENCE
H105 H106
STORAGE
H101
JANITOR
H404
STAIR
H405
ELEVATOR
H411
ELEV EQUIP
H411
H401
TOILET
H301
CONFERENCE
H103
CORRIDOR
H409
CORRIDOR
H407
CORRIDOR
G712
MECHANICAL
H406 44"x24"
42"x18"72 "x
23-06
23-08
23-09
58"x18" 58"x18"
48"x24"22 "x
54"x28"
"x
30"x25"
23-06
23-06
23-22
23-22
60"x28"
23-19
23-19
23-20
23-20
23-23
23-23
23-25
23-25
SCALE:
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
www.ihs.gov
CONSULTANT COMPANY NAME
ADDRESS
PHONE NUMBER
EMAIL ADDRESS
Consultant Website
TASK ORDER NO:
CONTRACT NO:
DIVISION OF FACILITIES MANAGEMENT
115 4TH AVENUE SE, RM 309
ABERDEEN, SD 57401
(605) 226-7451 FAX (605) 226-7580
GREAT PLAINS AREA INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL
HEALTH & ENGINEERING
1/4" = 1'-0"
8/ 3/
:5
9:
P M
MECHANICAL
DUCT AND
CONTROLS NEW
PLAN
MD2
PI
N
E R
ID
G
E A
IR
H
A N
D
LE
R
A N
D
U
PG
R
A D
ES
A
SH
R A
E
PFISTER
8-3-2022
129163
No. Description Date
1/4" = 1'-0"1 MECHANICAL DUCT NEW PLAN
KEYNOTE LEGEND
VALUE TEXT
23-06 PROVIDE AND INSTALL A NEW MODULATING ECONOMIZER DAMPER WITH DDC ACTUATOR
MOTOR AND ALL ACCESSORIES. TIE INTO EXISTING BAS AND PROVIDE ALL GRAPHICS,
SEQUENCING, POINTS, AND PROGRAMMING ACCORDING TO SHEET MD2 OR MS1. FIELD
VERIFY EXACT DUCT DIMENSIONS BEFORE SUBMITTING AND ORDERING NEW DAMPER AND
ACCESSORIES.
23-08 PROVIDE AND INSTALL NEW AH-10 STRUCTURAL STEEL SUPPLY FAN MOTOR MOUNT
ASSEMBLY AND ALL ACCESSORIES. COORDINATE WITH IHS STAFF FOR SHUTDOWN OF
UNIT. SEE SHEET MF1 FOR NEW FABRICATED MOTOR ASSEMBLY INSTRUCTION AND
DETAILS.
23-09 CONNECT NEW 48/24 OUTSIDE AIR DUCT TO EXISTING RETURN MAIN AT APPROXIMATELY 8 FT AFF AND NEW 22/38 OUTSIDE AIR DUCT TO EXISTING 72/24 VERTICAL OUTSIDE AIR MAIN
DUCT AT APPROXIMATELY 13.5 FT AFF. PROVIDE AND FABRICATE PROPER CONNECTIONS
FOR JOINING BOTH DUCTS OR SIZE TO MAINTAIN MAXIMUM CROSS SECTION TO PROVIDE
ENOUGH FREE AREA TO FLOW A FULL 10,500 ECONOMIZER CFM WITH A 0.08" WC DUCT
PRESSURE DROP PER 100 FEET OR LESS. COORDINATE WITH IHS STAFF FOR FINAL DUCT
FABRICATION SIZES AND CONNECTIONS TO MAXIMIZE FLOW AND MINIMIZE PRESSURE LOSS
DURING FULL ECONOMIZER MODE. COORDINATE WITH IHS STAFF FOR ANY REQUIRED UNIT
SHUTDOWN OR DUCT CONNECTION TIE IN.
23-19 PROVIDE AND INSTALL NEW DUCT SUPPLY AIR AND RETURN AIR TEMPERATURE AND
HUMIDITY SENSORS IN SAME LOCATION. FIELD VERIFY EXACT LOCATION. LOCATION
SHOWN HERE FOR CAPTURING SCOPE OF WORK ONLY. ENSURE ALL TEMPERATURE AND
HUMIDITY SENSORS ARE CALIBRATED AND 100% ACCURATE. TIE INTO EXISTING BUILDING
AUTOMATION SYSTEM GRAPHIC, POINTS, SEQUENCE, AND RE-PROGRAM AS REQUIRED.
23-20 PROVIDE AND INSTALL NEW MIXED AIR TEMPERATURE SENSOR. ENSURE SENSOR IS
CALIBRATED AND 100% ACCURATE. FIELD VERIFY EXACT LOCATION. LOCATION SHOWN
HERE FOR CAPTURING SCOPE OF WORK ONLY. TIE INTO EXISTING BUILDING AUTOMATION
SYSTEM GRAPHIC, POINTS, SEQUENCE, AND RE-PROGRAM AS REQUIRED.
23-22 PROVIDE AND INSTALL NEW DUCT STATIC PRESSURE SENSOR AND ALL ACCESSORIES.
FIELD VERIFY EXACT LOCATION. LOCATION SHOWN HERE FOR CAPTURING SCOPE OF
WORK ONLY. ENSURE SENSOR IS CALIBRATED AND 100% ACCURATE. TIE INTO EXISTING
BUILDING AUTOMATION SYSTEM GRAPHIC, POINTS, SEQUENCE, AND RE-PROGRAM AS
REQUIRED.
23-23 SHUT DOWN AIR HANDLER UNIT. COORDINATE WITH IHS STAFF FOR SHUTDOWN TIME AND
DURATION. CAREFULLY, THOROUGHLY, AND PROPERLY CLEAN BOTH HEATING WATER AND
CHILLED WATER COILS OF AIR HANDLING UNIT. FOLLOW COIL CLEANING REQUIREMENTS
CALLED OUT ON THIS SHEET.
23-25 INSTALL OWNER PROVIDED UV-C LIGHT SYSTEM DOWNSTREAM OF COOLING COIL AND IN A
POSITION TO PROVIDE ADEQUATE SURFACE CLEANING OF THE COOLING COIL.
COORDINATE WITH FACILITY MANAGER ON SHUTDOWN OF UNIT AND INSTALLATION OF IHS
PROVIDED UV-C SYSTEM. COORDINATE WITH ELECTRICAL FOR POWER AND WIRING
REQUIREMENTS. PROVIDE EVERYTHING FOR A 100% OPERATIONAL SYSTEM.
GENERAL NOTES:
• CONTRACTOR SHALL PLAN TO WORK OUTSIDE THE NORMAML BUSINESS HOURS FROM 8AM -
5PM MST FOR ANY WORK THAT REQUIRES AN AIR HANDLER TO BE SHUT DOWN FOR MORE
THAN 1 HOUR AT A TIME. CONTRACTOR SHALL BID WORK ACCORDINGLY FOR THIS PROVISION
IN ORDER TO WORK AT NIGHT OR ON WEEKENDS.
• TEMPERATURE CONTROL CONTRACTOR SCOPE OF WORK IS SHOWN ON VARIOUS MEP
SHEETS. TEMPERATURE CONTROL CONTRACTOR SHALL REVIEW ALL SHEETS CAREFULLY TO
CAPTURE AND FULLY UNDERSTAND ALL REQUIRED WORK UNDER THIS CONTRACT.
AIR HANDLER HEATING AND COOLING COIL CLEANING REQUIREMENTS:
1. CONTRACTOR SHALL COORDINATE WITH THE COR, DESIGNATED PM, AND SERVICE UNIT
STAFF FOR SCHEDULING AND SHUT DOWN OF HTE AIR HANDLING SYSTEM BEFORE CLEANING
ANY AIR HANDLER COILS. CONTRACTOR SHALL PLAN T OPERFORM WORK OUTSIDE NORMAL
BUSINESS HOURS AT NIGHT OR ON WEEKENDS.
2. CONTRACTOR SHALL CAREFULLY VACUUM AND/OR USED COMPRESSED AIR TO SUCK OR
BLOW OUT ANY DRY DIRT, DEBRIS, OR DUCT FROM COILS AND FINS OF EACH HEATING AND
COOLING COIL WITHOUT DAMAGING THEM. CONTRACTOR SHALL REMOVE ALL DRY DIRT,
DEBRIS, AND DUCT BEFORE UTILZING ANY WET CLEANING SYSTEMS.
3. CONTRACTOR SHALL CHECK ALL DRAIN PANS AND CONDENSATE LINES FOR BLOCKAGES. ALL
CONDENSATE SYSTEMS SHALL BE COMPLETELY CLEANED AND CLEAR OF BLOCKAGES
BEFORE PERFORMING ANY WET CLEANING WORK.
4. CONTRACTOR SHALL USE A PRE-COIL CLEANING AGENT AND COMPLETELY COVER THE
ENTIRE COOLING AND HEATING COIL SURFACES . CONTRACTOR SHALL USE THE PRODUCT
ACCORDING TO THE MANUFACTURE WRITTEN INSTRUCTIONS.
5. CONTRACTOR SHALL PERFORM CLEANING OF EACH HEATING AND COOLING COIL USING A
GOODAY PRESSURIZED WET SPRAY SYSTEM OR EQUAL AFTER COIL CLEANER HAS BEEN
UTILIZED ACCORDING TO THE MANUFACTURE WRITTEN INSTRUCTIONS. THE PRESSURIZED
CLEANING PROCESS SHALL BE POWERFUL ENOUGH TO ADEQUATELY CLEAN BOTH HEATING
AND COOLING COILS, YET DELICATE ENOUGH TO NOT DAMAGE FINS OR ANY OTHER PORTION
OF THE EXISTING COIL.
6. CONTRACTOR SHALL PROVIDE A FINAL NON-CAUSTIC CLEANER THAT WILL NOT BE WASHED
FROM THE COIL BUT LEFT IN PLACE TO CLEAN AND PROTECT EACH HEATING AND COOLING
COIL FROM COROSION, MOLD, MILDEW, AND ELIMINATE ODORS.
7. ALL PRE-CLEAN, CLEANING, AND FINAL CLEANING AGENTS OR PRODUCTS SHALL BE
SUBMITTED TO THE COR FOR APPROVAL PER THE WRITTEN STATEMENT OF WORK FOR THIS
CONTRACT.
ECONOMIZER SEQUENCE, POINTS, AND GRAPHICS REQUIREMENTS:
• CONTRACTOR SHALL ALTER THE EXISTING ECONOMIZER SEQUENCE, POINTS, AND GRAPHICS
IN ORDER TO REFLECT THE NEW AIR HANDLER UNIT UPGRADES AND/OR CHANGES AS A
RESULT OF THIS CONTRACT.
• CONTRACTOR SHALL ENSURE ALL NEW TEMPERATURE AND HUMIDITY SENSORS READ
CORRECTLY AND ACCURATELY ON EACH EXISTING AND CORRESPONDING AIR HANDLER
GRAPHIC.
• CONRACTOR SHALL DELETE THE EXISTING SMOKE DAMPER GRAPHIC(S) AND IMPLEMENT THE
NEW AND PROPER ECONOMIZER DAMPER GRAPHICS AND POINTS ON EACH OF THE EXISTING
AIR HANDLER SCREENS WITHIN THE BAS.
• CONTRACTOR SHALL ENSURE ALL NEW DUCT STATIC PRESSURE SENSORS READ CORRECTLY
AND ACCURATELY ON EACH EXISTING AND CORRESPONDING AIR HANDLER GRAPHIC.
• CONTRACTOR SHALL ENSURE THAT BOTH THE MINIMUM OUTDOOR AIR DAMPER POSITION
SET POINTS ARE AVAILABLE AND ADJUSTABLE ON EACH OF THE EXISTING AIR HANDLER
GRAPHICS AS WELL AS THE ECONOMIZER LOCK OUT SETPOINTS. ALL SYSTEM SEQUENCE,
POINTS, AND GRAPHICS SHALL BE 100% READABLE AND OPERATIONAL IN THE EXISTING BAS
AS A PART OF THIS CONTRACT.
NEW FAN BASE PLATE
1/4" A36 MILD STEEL
EXISTING 256 TC
FRAME 20 HP MOTOR
NEW MOTOR BASE PLATE
1/4" A36 MILD STEEL
23/32 (0.71875) INCH DIAMETER
HOLE FOR FITMENT OF 5/8 INCH
GRADE 8 BOLT - TYPICAL 8
THROUGH HOLE FOR 5/8"
GRADE 8 BOLT - TYPICAL 4
9/16" DIA. ADJ. MOTOR BASE
HOLE FOR FITMENT OF 1/2"
GRADE 8 BOLT - TYPICAL 4
1-1/8" CHAMFER - TYPICAL 2
1-1/4" CHAMFER - TYPICAL 2
MOTOR CENTERLINE MOTOR CENTERLINE
23/32 (0.71875) INCH DIAMETER
HOLE FOR FITMENT OF 5/8 INCH
GRADE 8 BOLT - TYPICAL 2
5/8" GRADE 8 BOLTS MOUNT FAN BASE
PLATE TO FAN BASE RAILS AT APPROX.
16-1/4" ON CENTER - TYPICAL 4
13-1/2" WIDE
" L
EN
G
TH
1" T
YP
IC
AL
3" TYPICAL
13" MAX LENGTH OR 12-7/8" MIN TO FIT
BETWEEN FAN BASE WIDTH
10" CENTER
TO CENTER
4" T
YP
IC
AL
" C
EN
TE
R
TO
C
EN
TE
R
1" CENTER
TO CENTER
1-1/2"
TYPICAL 2
1- 1/
2" C
EN
TE
R
TO
C
EN
TE
R
1-1/2"
TYPICAL 4
1- 5/
8"
TY
PI
C
AL
MOTOR MOUNTING CENTERLINE
MOTOR MOUNTING CENTERLINE
NEW MOTOR BASE PLATE
1/4" A36 MILD STEEL
NEW FAN BASE PLATE
1/4" A36 MILD STEEL
23/32 (0.71875) INCH DIAMETER
HOLE FOR FITMENT OF 5/8 INCH
GRADE 8 BOLT
PROVIDE 90 DEGREE ANCHOR BOLD FASTENER
(NOT SHOWN) - GRADE 8 AND 5/8" DIAMETER. FIELD
VERIFY THREAD LENGTH AND TOTAL LENTH
REQUIREMENTS. TYPICAL 2
NEW MOTOR MOUNT
ASSEMBLY
CHAMFER
APPROX. 2-1/16"
1-1/4" FROM
END
1-1/8"
CHAMFER
1" FROM
END
1" F
R O
M
BA
SE
1- 5/
8"
TH
IC
K
1/2" CHAMFER DEPTH
FROM TOP EDGE
NEW MOTOR BASE PLATE
1/4" A36 MILD STEEL AND
256 TC FRAME 20 HP
MOTOR
NEW FAN BASE PLATE
1/4" A36 MILD STEEL
FABRICATE LENGTH TOLERANCES
SUCH THAT MOTOR BASE PLATE SLIDES
OR FITS UP INSIDE FAN BASE PLATE
10" CENTER
TO CENTER
13-1/2" LONG
13" LONG
SCALE:
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
www.ihs.gov
CONSULTANT COMPANY NAME
ADDRESS
PHONE NUMBER
EMAIL ADDRESS
Consultant Website
TASK ORDER NO:
CONTRACT NO:
DIVISION OF FACILITIES MANAGEMENT
115 4TH AVENUE SE, RM 309
ABERDEEN, SD 57401
(605) 226-7451 FAX (605) 226-7580
GREAT PLAINS AREA INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL
HEALTH & ENGINEERING
NOT TO SCALE
8/
/2
:3 6:
P
M
MECHANICAL
FABRICATION
PLAN - NEW
AH-10 MOTOR
MOUNT ASSBLY
MF1
PI
N
E R
ID
G
E A
IR
H
A N
D
LE
R
A N
D
U
PG
R
A D
ES
A
SH
R A
E
PFISTER
8-19-2022
129163
No. Description Date
NTS1
PLAN VIEW - NEW MOTOR MOUNT
ASSEMBLY
NTS3
LEFT VIEW - NEW MOTOR MOUNT
ASSEMBLY
NTS2
FRONT VIEW - NEW MOTOR MOUNT
ASSEMBLY
ISOMETRIC VIEW - MOTOR MOUNT
ASSEMBLY (NOT TO SCALE)
CONFERENCE
H105 H106
STORAGE
H101
JANITOR
H404
STAIR
H405
ELEVATOR
H411
ELEV EQUIP
H411
H401
TOILET
H301
CONFERENCE
H103
CORRIDOR
H409
CORRIDOR
H407
CORRIDOR
G712
MECHANICAL
H406
23-03
23-02
AH-9
AH-10
23-03
23-02
2"
4"6" 3"
1"
FI
R E
(E) HEATING
WATER
(E) CHILLED
WATER
23-13
EXISTING
ELECTRICAL
AND CONTROLS
2" (E) SANITARY
23-14
23-14
23-15
23-15
23-24
23-24
EXISTING LIGHT TO REMAIN
POINT OF DISCONNECT
POINT OF CONNECTION
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
HEATING WATER SUPPLY PIPING
HEATING WATER RETURN PIPING
MECHANICAL EQUIPMENT
ELECTRICAL EQUIPMENT
SCALE:
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
www.ihs.gov
CONSULTANT COMPANY NAME
ADDRESS
PHONE NUMBER
EMAIL ADDRESS
Consultant Website
TASK ORDER NO:
CONTRACT NO:
DIVISION OF FACILITIES MANAGEMENT
115 4TH AVENUE SE, RM 309
ABERDEEN, SD 57401
(605) 226-7451 FAX (605) 226-7580
GREAT PLAINS AREA INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL
HEALTH & ENGINEERING
As indicated
8/ 3/
:5
9:
P M
MECHANICAL
PIPING
DEMOLITION
PLAN
MP1
PI
N
E R
ID
G
E A
IR
H
A N
D
LE
R
A N
D
U
PG
R
A D
ES
A
SH
R A
E
PFISTER
8-3-2022
129163
No. Description Date
1/4" = 1'-0"1 MECHANICAL PIPING DEMOLITION PLAN
KEYNOTE LEGEND
VALUE TEXT
23-02 DEMOLISH EXISTING 3 WAY PNEUMATIC HEATING WATER
CONTROL VALVE AND ALL ACCESSORIES. CAP ALL
PNEUMATIC AIR LINES AIR TIGHT. PREPARE FOR NEW 3 WAY
HEATING CONTROL VALVE INSTALLATION IN SAME LOCATION.
23-03 DEMOLISH EXISTING 2 WAY PNEUMATIC CHILLED WATER
CONTROL VALVE AND ALL ACCESSORIES. CAP ALL
PNEUMATIC AIR LINES AIR TIGHT. PREPARE FOR NEW 2 WAY
CHILLED WATER CONTROL VALVE IN SAME LOCATION.
23-13 DEMOLISH EXISTING 3 WAY PNEUMATIC HEATING WATER
CONTROL VALVE, PIPING, AND ALL ACCESSORIES BACK TO
BRANCH MAIN ISOLATION VALVES. ENSURE
CORRESPONDING DUCT HEATING COIL GRAPHIC, POINTS,
AND ALL PROGRAMMED SEQUENCES ARE REMOVED FROM
THE EXISTING BUILDING AUTOMATION SYSTEM.
23-14 DEMOLISH EXISTING SUPPLY AND RETURN CHILLED WATER
TEMPERATURE SENSORS. PREPARE PIPE FOR NEW
SENSORS IN SAME LOCATION. FIELD VERIFY EXACT
LOCATION. LOCATION SHOWN HERE FOR CAPTURING SCOPE
OF WORK ONLY.
23-15 DEMOLISH EXISTING SUPPLY AND RETURN HEATING WATER
TEMPERATURE SENSORS. PREPARE PIPE FOR NEW
SENSORS IN SAME LOCATION. FIELD VERIFY EXACT
LOCATION. LOCATION SHOWN HERE FOR CAPTURING SCOPE
OF WORK ONLY.
23-24 PREPARE EXISTING CHILLED WATER RETURN PIPE FOR NEW
AUTOMATIC FLOW CONTROL VALVE. SEE SHEET MP2 FOR
DETAILS.
GENERAL NOTES:
• ALL DUCTWORK LOCATED ABOVE IS HIDDEN FOR CLARITY ON THIS SHEET.
• CONTRACTOR SHALL PLAN TO WORK OUTSIDE THE NORMAML BUSINESS HOURS FROM 8AM -
5PM MST FOR ANY WORK THAT REQUIRES AN AIR HANDLER TO BE SHUT DOWN FOR MORE
THAN 1 HOUR AT A TIME. CONTRACTOR SHALL BID WORK ACCORDINGLY FOR THIS PROVISION
IN ORDER TO WORK AT NIGHT OR ON WEEKENDS.
• TEMPERATURE CONTROL CONTRACTOR SCOPE OF WORK IS SHOWN ON VARIOUS MEP
SHEETS. TEMPERATURE CONTROL CONTRACTOR SHALL REVIEW ALL SHEETS CAREFULLY TO
CAPTURE AND FULLY UNDERSTAND ALL REQUIRED WORK UNDER THIS CONTRACT.
• TEMPERATURE CONTROL CONTRACTOR TO ENSURE ALL NEW SUPPLY AND RETURN CHILLED
WATER AND HEATING WATER SENSORS ARE CALIBRATED AND READING 100% ACCURATE
TEMPERATURES. ALSO ENSURE ALL POINTS ARE MAPPED, SEQUENCED, AND APPEAR ON THE
EXISTING GRAPHICS IN THE BAS.
CONFERENCE
H105 H106
STORAGE
H101
JANITOR
H404
STAIR
H405
ELEVATOR
H411
ELEV EQUIP
H411
H401
TOILET
H301
CONFERENCE
H103
CORRIDOR
H409
CORRIDOR
H407
CORRIDOR
G712
MECHANICAL
H406
AH-9
AH-10
2"
2"
6" 4"
3"
2 1/2"
HEATING
WATER
CHILLED
WATER
(E) 2-1/2" HWS/
HWR & 6"
CWS/CWR UP
SEWER
23-10
23-10 1"
FIRE
(E) 2" VENT UP AND
DN
23-11
23-12
POINT OF DISCONNECT
POINT OF CONNECTION
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
HEATING WATER SUPPLY PIPING
HEATING WATER RETURN PIPING
MECHANICAL EQUIPMENT
ELECTRICAL EQUIPMENT
SCALE:
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
www.ihs.gov
CONSULTANT COMPANY NAME
ADDRESS
PHONE NUMBER
EMAIL ADDRESS
Consultant Website
TASK ORDER NO:
CONTRACT NO:
DIVISION OF FACILITIES MANAGEMENT
115 4TH AVENUE SE, RM 309
ABERDEEN, SD 57401
(605) 226-7451 FAX (605) 226-7580
GREAT PLAINS AREA INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL
HEALTH & ENGINEERING
As indicated
8/ 3/
:5
9:
P M
MECHANICAL
PIPING NEW
PLAN
MP2
PI
N
E R
ID
G
E A
IR
H
A N
D
LE
R
A N
D
U
PG
R
A D
ES
A
SH
R A
E
PFISTER
8-3-2022
129163
No. Description Date
1/4" = 1'-0"1 MECHANICAL PIPING NEW PLAN
KEYNOTE LEGEND
VALUE TEXT
23-10 PROVIDE AND INSTALL A NEW 1 INCH, 3 WAY, HEATING
WATER, MODULATING DDC BALL VALVE AND ALL
ACCESSORIES FOR A 100% OPERATIONAL SYSTEM. TIE INTO
THE EXISTING BAS AND UPDATE GRAPHICS, POINTS, AND
SEQUENCE OF OPERATION PROGRAMMING AS REQUIRED.
PROVIDE AND INSTALL NEW PIPING INSULATION TO MATCH
EXISTING MATERIAL AND THICKNESS FOR ANY DISTURBED
PIPING.
23-11 PROVIDE AND INSTALL A NEW 3 INCH, 2 WAY, CHILLED
WATER, MODULATING DDC BALL VALVE AND ALL
ACCESSORIES FOR A 100% OPERATIONAL SYSTEM.
CONTROL VALVE SHALL BE SIZED FOR 76 GPM WITH A CV
RATING IN THE RANGE OF 40-85 AND/OR A PRESSURE DROP
OF 0.8-3 PSI OR APPROXIMATELY HALF OF THE CHILLED
WATER COOLING COIL PRESSURE DROP OF 9.1 FEET OF
HEAD (3.9 PSI). ALSO PROVIDE AND INSTALL A 3 INCH
AUTOMATIC FLOW CONTROL BALANCING VALVE WITH A
CARTRIDGE RATED FOR 76 GPM ON THE BRANCH RETURN
CHILLED WATER PIPE. A MANUAL BALANCING VALVE WILL
NOT BE ALLOWED. RE-INSULATE ALL DISTURBED PIPING TO
MATCH EXISTING MATERIAL AND THICKNESS.
23-12 PROVIDE AND INSTALL A NEW 3 INCH, 2 WAY, CHILLED
WATER, MODULATING DDC BALL VALVE AND ALL
ACCESSORIES FOR A 100% OPERATIONAL SYSTEM.
CONTROL VALVE SHALL BE SIZED FOR 115 GPM WITH A CV
RATING IN THE RANGE OF 66-125 AND/OR A PRESSURE DROP
OF 0.8-3.0 PSI OR APPROXIMATELY HALF OF THE CHILLED
WATER COOLING COIL PRESSURE DROP OF 10.7 FEET OF
HEAD (4.6 PSI). ALSO PROVIDE AND INSTALL A 2-1\2 INCH
AUTOMATIC FLOW CONTROL BALANCING VALVE WITH A
CARTRIDGE RATED FOR 115 GPM ON THE BRANCH RETURN
CHILLED WATER PIPE. A MANUAL BALANCING VALVE WILL
NOT BE ALLOWED. RE-INSULATE ALL DISTURBED PIPING TO
MATCH EXISTING MATERIAL AND THICKNESS.
GENERAL NOTES:
• ALL DUCTWORK LOCATED ABOVE IS HIDDEN FOR CLARITY ON THIS SHEET.
• CONTRACTOR SHALL PLAN TO WORK OUTSIDE THE NORMAML BUSINESS HOURS FROM 8AM -
5PM MST FOR ANY WORK THAT REQUIRES AN AIR HANDLER TO BE SHUT DOWN FOR MORE
THAN 1 HOUR AT A TIME. CONTRACTOR SHALL BID WORK ACCORDINGLY FOR THIS PROVISION
IN ORDER TO WORK AT NIGHT OR ON WEEKENDS.
• TEMPERATURE CONTROL CONTRACTOR SCOPE OF WORK IS SHOWN ON VARIOUS MEP
SHEETS. TEMPERATURE CONTROL CONTRACTOR SHALL REVIEW ALL SHEETS CAREFULLY TO
CAPTURE AND FULLY UNDERSTAND ALL REQUIRED WORK UNDER THIS CONTRACT.
• TEMPERATURE CONTROL CONTRACTOR TO ENSURE ALL NEW SUPPLY AND RETURN CHILLED
WATER AND HEATING WATER SENSORS ARE CALIBRATED AND READING 100% ACCURATE
TEMPERATURES. ALSO ENSURE ALL POINTS ARE MAPPED, SEQUENCED, AND APPEAR ON THE
EXISTING GRAPHICS IN THE BAS.
AH-9
Return Air
36"x48"
"x
24"x44" 18"x42"72"x24"
"x
4"
2 1/2"
2"
(E) AH-10
Disconnect
(E)
AHU-10_ISO_TRANS
(E) UPS
Disconnect
(E) JCI CNRL
PANEL
(E) AH-9 VFD
2"
2 1/2"
23-25
23-12
23-10
23-19
Sanitary2"
4"
23-06
23-06
EXISTING 8 INCH HOUSE KEEPING PAD
23-23
23-20
MS1
3"
AH-10
(E) UPS_LAB
(E) AH-10 VFD
18"x58"
23-06
23-11
23-10
EXISTING 8 INCH HOUSE KEEPING PAD
1"
1" 1"
24"x48"
"x
"x
24"x72"
Supply Air
Return Air
28"x60"
3"
FIRE1"
18"x58"
23-06
28"x54"
NEW DUCT
CONNECTION BEHIND
23-08
23-25
23-09
23-09
23-23
23-20
23-19
CORRIDOR
H407
TOILET H301
SOUTH WALL
MS1
POINT OF DISCONNECT
POINT OF CONNECTION
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
HEATING WATER SUPPLY PIPING
HEATING WATER RETURN PIPING
MECHANICAL EQUIPMENT
SUPPLY AIR DUCT
RETURN AIR DUCT
OUTSIDE AIR DUCT
ELECTRICAL EQUIPMENT
MS1
MS1
AH-10
(E) UPS_LAB
(E) AH-10 VFD
2"2"
6"
4"
(E) AHU 9
Disconnect
(E)
AHU-9_ISO_TRANS
(E)
AHU-10_ISO_TRANS
(E) JCI CP AHU
(E) JCI CNRL
PANEL
(E) JCI CP AHU
(E) JCI CP NAE
(E) UPS
Disconnect
(E) AH-10
Disconnect
Sa ni ta ry
(E) AH-9 VFD
32"x22"
23-26
72X24
23-09
54X28
72X24 UP TO
OA LOUVER
Ve nt
2"
EXISTING LIGHT
TO REMAIN
SCALE:
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
www.ihs.gov
CONSULTANT COMPANY NAME
ADDRESS
PHONE NUMBER
EMAIL ADDRESS
Consultant Website
TASK ORDER NO:
CONTRACT NO:
DIVISION OF FACILITIES MANAGEMENT
115 4TH AVENUE SE, RM 309
ABERDEEN, SD 57401
(605) 226-7451 FAX (605) 226-7580
GREAT PLAINS AREA INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL
HEALTH & ENGINEERING
As indicated
8/ 3/
:5
9:
P M
MECHANICAL
ROOM
SECTIONS
MS1
PI
N
E R
ID
G
E A
IR
H
A N
D
LE
R
A N
D
U
PG
R
A D
ES
A
SH
R A
E
PFISTER
8-3-2022
129163
No. Description Date
1/4" = 1'-0"2 SOUTH SECTION VIEW
1/4" = 1'-0"1 NORTH SECTION VIEW
NTS4 LEGEND
GENERAL NOTES:
• CONTRACTOR SHALL PLAN TO WORK OUTSIDE THE NORMAML BUSINESS HOURS FROM 8AM -
5PM MST FOR ANY WORK THAT REQUIRES AN AIR HANDLER TO BE SHUT DOWN FOR MORE
THAN 1 HOUR AT A TIME. CONTRACTOR SHALL BID WORK ACCORDINGLY FOR THIS PROVISION
IN ORDER TO WORK AT NIGHT OR ON WEEKENDS.
• TEMPERATURE CONTROL CONTRACTOR SCOPE OF WORK IS SHOWN ON VARIOUS MEP
SHEETS. TEMPERATURE CONTROL CONTRACTOR SHALL REVIEW ALL SHEETS CAREFULLY TO
CAPTURE AND FULLY UNDERSTAND ALL REQUIRED WORK UNDER THIS CONTRACT.
KEYNOTE LEGEND
VALUE TEXT
23-06 PROVIDE AND INSTALL A NEW MODULATING ECONOMIZER DAMPER WITH DDC
ACTUATOR MOTOR AND ALL ACCESSORIES. TIE INTO EXISTING BAS AND
PROVIDE ALL GRAPHICS, SEQUENCING, POINTS, AND PROGRAMMING
ACCORDING TO SHEET MD2 OR MS1. FIELD VERIFY EXACT DUCT DIMENSIONS
BEFORE SUBMITTING AND ORDERING NEW DAMPER AND ACCESSORIES.
23-08 PROVIDE AND INSTALL NEW AH-10 STRUCTURAL STEEL SUPPLY FAN MOTOR
MOUNT ASSEMBLY AND ALL ACCESSORIES. COORDINATE WITH IHS STAFF FOR
SHUTDOWN OF UNIT. SEE SHEET MF1 FOR NEW FABRICATED MOTOR
ASSEMBLY INSTRUCTION AND DETAILS.
23-09 CONNECT NEW 48/24 OUTSIDE AIR DUCT TO EXISTING RETURN MAIN AT
APPROXIMATELY 8 FT AFF AND NEW 22/38 OUTSIDE AIR DUCT TO EXISTING 72/24
VERTICAL OUTSIDE AIR MAIN DUCT AT APPROXIMATELY 13.5 FT AFF. PROVIDE
AND FABRICATE PROPER CONNECTIONS FOR JOINING BOTH DUCTS OR SIZE TO
MAINTAIN MAXIMUM CROSS SECTION TO PROVIDE ENOUGH FREE AREA TO
FLOW A FULL 10,500 ECONOMIZER CFM WITH A 0.08" WC DUCT PRESSURE DROP
PER 100 FEET OR LESS. COORDINATE WITH IHS STAFF FOR FINAL DUCT
FABRICATION SIZES AND CONNECTIONS TO MAXIMIZE FLOW AND MINIMIZE
PRESSURE LOSS DURING FULL ECONOMIZER MODE. COORDINATE WITH IHS
STAFF FOR ANY REQUIRED UNIT SHUTDOWN OR DUCT CONNECTION TIE IN.
23-10 PROVIDE AND INSTALL A NEW 1 INCH, 3 WAY, HEATING WATER, MODULATING
DDC BALL VALVE AND ALL ACCESSORIES FOR A 100% OPERATIONAL SYSTEM.
TIE INTO THE EXISTING BAS AND UPDATE GRAPHICS, POINTS, AND SEQUENCE
OF OPERATION PROGRAMMING AS REQUIRED. PROVIDE AND INSTALL NEW
PIPING INSULATION TO MATCH EXISTING MATERIAL AND THICKNESS FOR ANY
DISTURBED PIPING.
23-11 PROVIDE AND INSTALL A NEW 3 INCH, 2 WAY, CHILLED WATER, MODULATING
DDC BALL VALVE AND ALL ACCESSORIES FOR A 100% OPERATIONAL SYSTEM.
CONTROL VALVE SHALL BE SIZED FOR 76 GPM WITH A CV RATING IN THE RANGE
OF 40-85 AND/OR A PRESSURE DROP OF 0.8-3 PSI OR APPROXIMATELY HALF OF
THE CHILLED WATER COOLING COIL PRESSURE DROP OF 9.1 FEET OF HEAD (3.9
PSI). ALSO PROVIDE AND INSTALL A 3 INCH AUTOMATIC FLOW CONTROL
BALANCING VALVE WITH A CARTRIDGE RATED FOR 76 GPM ON THE BRANCH
RETURN CHILLED WATER PIPE. A MANUAL BALANCING VALVE WILL NOT BE
ALLOWED. RE-INSULATE ALL DISTURBED PIPING TO MATCH EXISTING MATERIAL
AND THICKNESS.
23-12 PROVIDE AND INSTALL A NEW 3 INCH, 2 WAY, CHILLED WATER, MODULATING
DDC BALL VALVE AND ALL ACCESSORIES FOR A 100% OPERATIONAL SYSTEM.
CONTROL VALVE SHALL BE SIZED FOR 115 GPM WITH A CV RATING IN THE
RANGE OF 66-125 AND/OR A PRESSURE DROP OF 0.8-3.0 PSI OR
APPROXIMATELY HALF OF THE CHILLED WATER COOLING COIL PRESSURE
DROP OF 10.7 FEET OF HEAD (4.6 PSI). ALSO PROVIDE AND INSTALL A 2-1\2 INCH
AUTOMATIC FLOW CONTROL BALANCING VALVE WITH A CARTRIDGE RATED FOR
115 GPM ON THE BRANCH RETURN CHILLED WATER PIPE. A MANUAL
BALANCING VALVE WILL NOT BE ALLOWED. RE-INSULATE ALL DISTURBED
PIPING TO MATCH EXISTING MATERIAL AND THICKNESS.
23-19 PROVIDE AND INSTALL NEW DUCT SUPPLY AIR AND RETURN AIR TEMPERATURE
AND HUMIDITY SENSORS IN SAME LOCATION. FIELD VERIFY EXACT LOCATION.
LOCATION SHOWN HERE FOR CAPTURING SCOPE OF WORK ONLY. ENSURE ALL
TEMPERATURE AND HUMIDITY SENSORS ARE CALIBRATED AND 100%
ACCURATE. TIE INTO EXISTING BUILDING AUTOMATION SYSTEM GRAPHIC,
POINTS, SEQUENCE, AND RE-PROGRAM AS REQUIRED.
23-20 PROVIDE AND INSTALL NEW MIXED AIR TEMPERATURE SENSOR. ENSURE
SENSOR IS CALIBRATED AND 100% ACCURATE. FIELD VERIFY EXACT LOCATION.
LOCATION SHOWN HERE FOR CAPTURING SCOPE OF WORK ONLY. TIE INTO
EXISTING BUILDING AUTOMATION SYSTEM GRAPHIC, POINTS, SEQUENCE, AND
RE-PROGRAM AS REQUIRED.
23-23 SHUT DOWN AIR HANDLER UNIT. COORDINATE WITH IHS STAFF FOR SHUTDOWN
TIME AND DURATION. CAREFULLY, THOROUGHLY, AND PROPERLY CLEAN BOTH
HEATING WATER AND CHILLED WATER COILS OF AIR HANDLING UNIT. FOLLOW
COIL CLEANING REQUIREMENTS CALLED OUT ON THIS SHEET.
23-25 INSTALL OWNER PROVIDED UV-C LIGHT SYSTEM DOWNSTREAM OF COOLING
COIL AND IN A POSITION TO PROVIDE ADEQUATE SURFACE CLEANING OF THE
COOLING COIL. COORDINATE WITH FACILITY MANAGER ON SHUTDOWN OF UNIT
AND INSTALLATION OF IHS PROVIDED UV-C SYSTEM. COORDINATE WITH
ELECTRICAL FOR POWER AND WIRING REQUIREMENTS. PROVIDE EVERYTHING
FOR A 100% OPERATIONAL SYSTEM.
23-26 CAP DEMOLISHED HEATING WATER PIPING AT ISOLATION VALVE(S).
AIR HANDLER HEATING AND COOLING COIL CLEANING REQUIREMENTS:
1. CONTRACTOR SHALL COORDINATE WITH THE COR, DESIGNATED PM, AND SERVICE UNIT
STAFF FOR SCHEDULING AND SHUT DOWN OF HTE AIR HANDLING SYSTEM BEFORE CLEANING
ANY AIR HANDLER COILS. CONTRACTOR SHALL PLAN T OPERFORM WORK OUTSIDE NORMAL
BUSINESS HOURS AT NIGHT OR ON WEEKENDS.
2. CONTRACTOR SHALL CAREFULLY VACUUM AND/OR USED COMPRESSED AIR TO SUCK OR
BLOW OUT ANY DRY DIRT, DEBRIS, OR DUCT FROM COILS AND FINS OF EACH HEATING AND
COOLING COIL WITHOUT DAMAGING THEM. CONTRACTOR SHALL REMOVE ALL DRY DIRT,
DEBRIS, AND DUCT BEFORE UTILZING ANY WET CLEANING SYSTEMS.
3. CONTRACTOR SHALL CHECK ALL DRAIN PANS AND CONDENSATE LINES FOR BLOCKAGES. ALL
CONDENSATE SYSTEMS SHALL BE COMPLETELY CLEANED AND CLEAR OF BLOCKAGES
BEFORE PERFORMING ANY WET CLEANING WORK.
4. CONTRACTOR SHALL USE A PRE-COIL CLEANING AGENT AND COMPLETELY COVER THE
ENTIRE COOLING AND HEATING COIL SURFACES . CONTRACTOR SHALL USE THE PRODUCT
ACCORDING TO THE MANUFACTURE WRITTEN INSTRUCTIONS.
5. CONTRACTOR SHALL PERFORM CLEANING OF EACH HEATING AND COOLING COIL USING A
GOODAY PRESSURIZED WET SPRAY SYSTEM OR EQUAL AFTER COIL CLEANER HAS BEEN
UTILIZED ACCORDING TO THE MANUFACTURE WRITTEN INSTRUCTIONS. THE PRESSURIZED
CLEANING PROCESS SHALL BE POWERFUL ENOUGH TO ADEQUATELY CLEAN BOTH HEATING
AND COOLING COILS, YET DELICATE ENOUGH TO NOT DAMAGE FINS OR ANY OTHER PORTION
OF THE EXISTING COIL.
6. CONTRACTOR SHALL PROVIDE A FINAL NON-CAUSTIC CLEANER THAT WILL NOT BE WASHED
FROM THE COIL BUT LEFT IN PLACE TO CLEAN AND PROTECT EACH HEATING AND COOLING
COIL FROM COROSION, MOLD, MILDEW, AND ELIMINATE ODORS.
7. ALL PRE-CLEAN, CLEANING, AND FINAL CLEANING AGENTS OR PRODUCTS SHALL BE
SUBMITTED TO THE COR FOR APPROVAL PER THE WRITTEN STATEMENT OF WORK FOR THIS
CONTRACT.
ECONOMIZER SEQUENCE, POINTS, AND GRAPHICS REQUIREMENTS:
• CONTRACTOR SHALL ALTER THE EXISTING ECONOMIZER SEQUENCE, POINTS, AND GRAPHICS
IN ORDER TO REFLECT THE NEW AIR HANDLER UNIT UPGRADES AND/OR CHANGES AS A
RESULT OF THIS CONTRACT.
• CONTRACTOR SHALL ENSURE ALL NEW TEMPERATURE AND HUMIDITY SENSORS READ
CORRECTLY AND ACCURATELY ON EACH EXISTING AND CORRESPONDING AIR HANDLER
GRAPHIC.
• CONRACTOR SHALL DELETE THE EXISTING SMOKE DAMPER GRAPHIC(S) AND IMPLEMENT THE
NEW AND PROPER ECONOMIZER DAMPER GRAPHICS AND POINTS ON EACH OF THE EXISTING
AIR HANDLER SCREENS WITHIN THE BAS.
• CONTRACTOR SHALL ENSURE ALL NEW DUCT STATIC PRESSURE SENSORS READ CORRECTLY
AND ACCURATELY ON EACH EXISTING AND CORRESPONDING AIR HANDLER GRAPHIC.
• CONTRACTOR SHALL ENSURE THAT BOTH THE MINIMUM OUTDOOR AIR DAMPER POSITION
SET POINTS ARE AVAILABLE AND ADJUSTABLE ON EACH OF THE EXISTING AIR HANDLER
GRAPHICS AS WELL AS THE ECONOMIZER LOCK OUT SETPOINTS. ALL SYSTEM SEQUENCE,
POINTS, AND GRAPHICS SHALL BE 100% READABLE AND OPERATIONAL IN THE EXISTING BAS
AS A PART OF THIS CONTRACT. 1/4" = 1'-0"3 EAST SECTION VIEW
CONFERENCE
H105 H106
STORAGE
H101
JANITOR
H404
STAIR
H405
ELEVATOR
H411
ELEV EQUIP
H411
H401
TOILET
H301
CONFERENCE
H103
CORRIDOR
H409
CORRIDOR
H407
CORRIDOR
G712
MECHANICAL
H406
(E) NLH2 (E) CLH1
(E) NHH1
(E) NLH1
26-02
26-01
26-01
(E) TNHH
TRANSFORMER
(E) AH-9 VFD
(E) AH-10 VFD
(E)
AHU-10_ISO_TRANS
(E)
AHU-9_ISO_TRANS
(E) JCI CP AHU
(E) JCI CP AHU
(E) JCI CNRL
PANEL
(E) AHU 9
Disconnect
(E) AH-10
Disconnect
(E) UPS_LAB
AH-9
AH-10EXISTING LIGHT
TO REMAIN
SCALE:
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
www.ihs.gov
CONSULTANT COMPANY NAME
ADDRESS
PHONE NUMBER
EMAIL ADDRESS
Consultant Website
TASK ORDER NO:
CONTRACT NO:
DIVISION OF FACILITIES MANAGEMENT
115 4TH AVENUE SE, RM 309
ABERDEEN, SD 57401
(605) 226-7451 FAX (605) 226-7580
GREAT PLAINS AREA INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL
HEALTH & ENGINEERING
1/4" = 1'-0"
8/ 3/
:5
8:
P M
ELECTRICAL
DEMOLITION
AND NEW PLAN
E1
PI
N
E R
ID
G
E A
IR
H
A N
D
LE
R
A N
D
U
PG
R
A D
ES
A
SH
R A
E
PFISTER
8-3-2022
129163
No. Description Date
GENERAL NOTES:
• DUCTWORK AND PIPING LOCATED
ABOVE IS HIDDEN FOR CLARITY ON
THIS SHEET.
• CONTRACTOR SHALL PLAN TO
WORK OUTSIDE THE NORMAML
BUSINESS HOURS FROM 8AM - 5PM
MST FOR ANY WORK THAT
REQUIRES AN AIR HANDLER TO BE
SHUT DOWN FOR MORE THAN 1
HOUR AT A TIME. CONTRACTOR
SHALL BID WORK ACCORDINGLY
FOR THIS PROVISION IN ORDER TO
WORK AT NIGHT OR ON WEEKENDS.
1/4" = 1'-0"1 ELECTRICAL DEMO AND NEW PLAN
KEYNOTE LEGEND
VALUE TEXT
26-01 PROVIDE 120V, SINGLE PHASE POWER TO NEW UV-C LIGHT
SYSTEM SERVING EXISTING AIR HANDLING UNIT.
COORDINATE WITH MECHANICAL CONTRACTOR FOR EXACT
REQUIREMENTS. ELECTRICAL CONTRACTOR RESPONSIBLE
FOR PROVIDING A 100% OEPRATIONAL SYSTEM INCLUDING
BUT NOT LIMITED TO INSTALLATION OF CONDUIT,
RACEWAYS, WIRING, BREAKERS, AND TERMINATIONS ALL
ACCORDING TO THE LATEST NEC.
26-02 PROVIDE 120V, SINGLE PHASE POWER CIRCUIT TO EACH
NEW UV-C LIGHT SYSTEM SERVING BOTH EXISTING AIR
HANDLERS 9 & 10. PROVIDE A 100% OPERATIONAL POWER
CIRCUIT ACCORDING TO THE NEC FROM EXISTING 20 AMP
BREAKER #9 OF EXISTING PANEL NLH1 LOCATED IN
ELEVATOR EQUIPMENT ROOM H411.
| Sheets |
| E1 - ELECTRICAL DEMOLITION AND NEW PLAN |
| MD1 - MECHANICAL DUCT DEMOLITION PLAN |
| MD2 - MECHANICAL DUCT AND CONTROLS NEW PLAN |
| MEP1 - MECHANICAL ROOM EXISTING AS BUILT PLAN |
| MF1 - MECHANICAL FABRICATION PLAN - NEW AH-10 MOTOR MOUNT ASSBLY |
| MP1 - MECHANICAL PIPING DEMOLITION PLAN |
| MP2 - MECHANICAL PIPING NEW PLAN |
| MS1 - MECHANICAL ROOM SECTIONS |
| MF1.pdf |
| Sheets |
| MF1 - MECHANICAL FABRICATION PLAN - NEW AH-10 MOTOR MOUNT ASSBLY |
File details come from the government source that posted it. Updated .