Sheet1 (2)

Attachment 09 - Price Breakdown
Solicitation Number: 75H701-20-R-00037
Mescalero 2018 Scattered Housing Project
IHS Project Number AL-18-A96
No.DescriptionQtyUnitUnit CostTotal Cost
1Mobilization/demobilization1LS
2Rock excavation20CY
Holly Archilta
34-inch double clean out1EA
41250-gal. septic tank1EA
54-inch PVC gravity sewer service line35LF
6Distribution box1EA
7HDPE distribution box risers15LF
8Chamber drainfield540LF
Victoria Barrios
94-inch double clean out1EA
101250-gal. septic tank1EA
114-inch PVC gravity sewer service line22LF
12Distribution box1EA
13HDPE distribution box risers15LF
14Chamber drainfield360LF
Philbert Choneska
15Septic tank abandonment1EA
164-inch double clean out1EA
174-inch PVC gravity sewer service line32LF
181250-gal. septic tank1EA
19500-gal. pump tank1EA
201.5-inch sewer force main420LF
21Buried electrical cable40LF
22Effluent pump and controls1EA
Felicia Guerrero
234-inch double clean out1EA
241250-gal. septic tank1EA
254-inch PVC gravity sewer service line66LF
26Distribution box1EA
27HDPE distribution box risers15LF
28EZ-flow drainfield360LF
Samantha Mendez
294-inch double clean out1EA
30Septic tank retrofit1EA
314-inch PVC gravity sewer service line70LF
32Distribution box1EA
33HDPE distribution box risers15LF
34Chamber drainfield285LF
Roxanne Starr
354-inch double clean out1EA
364-inch single clean out2EA
371500-gal. septic tank1EA
384-inch PVC gravity sewer service line310LF
39Distribution box1EA
40HDPE distribution box risers15LF
41Chamber drainfield285LF
Construction subtotal =
NMGRT =
Total =