B01 - Attachment 0001 - Performance Work Statement Rigging B123 20MAY2026.pdf
PDF 81 KB Posted
- Attached to
- RIGGING SERVICES BUILDING 123
- Solicitation number
- W519TC-26-Q-B123
About this file
This is a Task Order Performance Work Statement issued on 20 May 2026 for rigging, crane, and material handling services under a Rigging Basic Ordering Agreement with Crane Army Ammunition Activity (CAAA).
The contractor shall relocate six pieces of industrial and manufacturing equipment across multiple CAAA facilities: a G&L 340 T Horizontal Boring Mill and Oven from Building 123 to Building 2000; a Chiller from Building 123 to Building 2006; and a Cincinnati CL-7 Laser and Bag House from Building 123 to Building 3331. The contractor must provide all labor, supervision, tools, materials, consumables, rigging devices, lifting equipment, and transportation resources necessary to complete the moves in compliance with OSHA 1926.251 requirements and applicable DoD and CAAA safety standards. Required services include site visits and job analysis, equipment preparation and verification of dimensions and weight, provision of cranes (rough terrain, carry deck, truck mounted), forklifts, rigging hardware (slings, chains, shackles, lifting beams), and final set, level, alignment, and reassembly at new locations. Work must commence within 10 business days of award during normal business hours with no interruptions exceeding 24 hours except for equipment procurement. The period of performance extends from Notice to Proceed until completion, with a maximum of 30 days allowed. CAAA will handle all utility disconnection and reconnection, facility access, lockout/tagout support, and identification of storage locations. Deliverables include a Customer Service Report, Lift and Rigging Plans if required, and a Completion Report confirming equipment relocation and installation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order Performance Work Statement (PWS)
20 May 2026
Rigging, Crane, and Material Handling Support Under the Rigging Basic Ordering Agreement
1.0 Purpose
This Task Order provides rigging, crane, and material handling services required to relocate, remove, and install machinery and support equipment across multiple CAAA facilities.
Work supplements in-house capabilities when internal resources are unavailable due to scheduling conflicts, insufficient capacity, lack of specialized equipment, or lack of required technical skills.
2.0 Background
CAAA must relocate several pieces of industrial and manufacturing equipment to support ongoing mission requirements, facility reconfiguration, and modernization efforts. These moves require specialized rigging, lifting, and transport capabilities beyond current in-house capacity. This Task Order authorizes the contractor to perform these equipment moves safely, efficiently, and in accordance with all applicable standards.
3.0 Scope of Work
The contractor shall provide all labor, supervision, tools, materials, consumables, rigging devices, lifting equipment, and transportation resources necessary to complete the equipment moves listed in Section 3.1. All work shall comply with the BOA PWS and applicable OSHA, DoD, and CAAA safety requirements.
3.1 Equipment to Be Moved
From Building 123 to Building 2000
• G&L 340 T Horizontal Boring Mill
• Oven
From Building 123 to 2006
• Chiller
From Building 123 to Building 3331
• Cincinnati CL-7 Laser
• Bag House
The contractor shall verify equipment dimensions, weight, center of gravity, and lifting points prior to movement.
3.2 Utility Responsibilities
Crane Army Ammunition Activity (CAAA) will be responsible for:
• Disconnecting all utilities prior to contractor movement of equipment
• Lockout/Tagout of all affected systems
• Reconnecting all utilities after equipment is placed in its new location
Utilities include, but are not limited to: electrical power, compressed air, water, steam, ventilation, exhaust, data, and any other facility service connections.
The contractor shall not perform utility disconnection or reconnection work.
3.3 Required Services
The contractor shall:
• Conduct site visits and job analysis to determine proper rigging, lifting, and transport methods
• Prepare equipment for safe movement (excluding utility disconnection)
• Provide cranes, forklifts, skates, jacks, rigging devices, and other equipment needed to lift, move, or position machinery
• Transport equipment between buildings or to designated storage locations
• Set, level, align, and reassemble equipment at the new location
• Coordinate with CAAA personnel for access, lockout/tagout, and utility reconnection scheduling
3.4 Tools, Equipment, and Materials
The contractor shall furnish all tools and equipment necessary to perform the work, including but not limited to:
• Rough terrain cranes, carry deck cranes, truck mounted cranes
• Forklifts and remote operation machinery skates
• Slings, chains, shackles, lifting eyes, spreader bars, lifting beams
• Jacks, rollers, clevises, and associated rigging hardware
All rigging devices shall meet OSHA 1926.251 requirements. All tools and equipment must be in good working order and fully compliant with OSHA safety requirements.
3.5 Execution Requirements
• Work shall commence within 10 business days of award unless otherwise approved by the COR and KO
• Work shall be performed during normal business hours unless otherwise authorized
• Work interruptions exceeding 24 hours shall only occur for procurement of replacement parts, materials, or equipment
• The contractor shall maintain continuous progress and complete the work within the timeframe agreed upon with the COR
• Subcontracting is permitted when specialized expertise or additional capacity is required
4.0 Deliverables
• Customer Service Report (CSR)
• Lift and Rigging Plans (if required)
• Completion Report confirming equipment has been relocated, installed, or stored as directed
5.0 Government Furnished Support
CAAA will provide:
• Utility disconnection and reconnection
• Facility access and escorting
• Lockout/Tagout support
• Identification of storage locations
• Any government furnished equipment identified by the COR
6.0 Period of Performance
The period of performance begins upon Notice to Proceed and continues until all work is completed and accepted by the COR. Contractor will be afforded no more than 30 days to complete the work.
File details come from the government source that posted it. Updated .