B-Specifications.pdf
PDF 2 MB Posted
- Attached to
- Chestnut Grove Cemetery Development Project
- Solicitation number
- IFB-131116
- Issued by
- Fairfax County, Virginia
About this file
This is a detailed specifications document for the Chestnut Grove Cemetery Development Project issued by the Town of Herndon, Virginia, covering site improvements for approximately 3.7 acres located at 831 Dranesville Road in Herndon. The project encompasses comprehensive site development work including clearing and grubbing of approximately 3.7 acres, excavation and grading for burial areas, construction of an initial burial area with a minimum capacity of 100 burial plots, storm drainage piping installation, stormwater management facilities, paved cemetery access roads with a cul-de-sac, three uncovered landscape material storage bins, landscape plantings, and erosion and sediment control measures. The specifications detail compliance requirements with Virginia Department of Transportation (VDOT) standards, Virginia Erosion and Sediment Control Handbook regulations, Northern Long-Eared Bat protection requirements, and local Town of Herndon regulations. The contractor must coordinate with the Owner to sequence work and make the initial burial area available for cemetery use as early as practicable, with all clearing and grubbing to be performed in accordance with applicable environmental and regulatory requirements.
The contract is structured as a lump sum bid for all work, with the contractor responsible for all costs including labor, materials, equipment, testing, inspections, certifications, and administrative effort. The contractor must employ a geotechnical testing company at no additional cost to the Town to perform acceptance testing, field density tests, and inspections throughout construction, with testing services subject to approval by the Department of Public Works. Concrete shall be 4000 psi strength in all applications, and compaction requirements vary by application: 95 percent of maximum dry density for engineered fill, 90 percent for utilities, and compliance with VDOT specifications for roadways and parking areas. The contractor must obtain coverage under the Virginia Department of Environmental Quality (DEQ) General VPDES Permit for Discharges of Stormwater from Construction Activities before commencing land-disturbing activities, maintain a Stormwater Pollution Prevention Plan (SWPPP), and coordinate with the Owner regarding permit responsibility. All rock excavation and hard material removal costs are included in the bid price with no additional compensation provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D-StormTrap Installation Guide.pdf | ||
| A - Project Drawings_Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION 1-GENERAL REQUIREMENTS
1 - 01010
SECTION 01010 - SUMMARY OF WORK
PART 1 – GENERAL
1.01 WORK SUMMARY
A. Work generally consists of, but is not limited to, the site improvements necessary for the development of approximately 3.7 acres at the northwest corner of
Chestnut Grove Cemetery, located at 831 Dranesville Road.
B. The Following is a brief, but not all-inclusive, description of the Work.
1. Clear and grub approximately 3.7 acres within the designated limits of disturbance, including removal and disposal of trees, stumps, brush, vegetation, roots, debris, unsuitable materials, and other obstructions.
Perform clearing and removal outside the designated limits where specifically indicated on the Plans or otherwise required by the Contract
Documents.
All clearing and grubbing shall be performed in accordance with applicable environmental and regulatory requirements. Tree cutting shall comply with the requirements for protection of the Northern Long-Eared
Bat and the restrictions established in the Special Conditions.
2. Perform all excavation, embankment, grading, filling, hauling, stockpiling, disposal, topsoil placement, moisture conditioning, compaction, and related earthwork necessary to establish the proposed burial areas, access roads, drainage facilities, landscape areas, and other improvements shown on the Plans.
Earthwork and engineered fill shall be performed in accordance with the recommendations of the Geotechnical Report.
Unless otherwise specified, engineered fill, including fill slopes, shall be placed in controlled lifts and compacted to a minimum of 95 percent of maximum dry density as determined by the applicable ASTM test method.
The Contractor shall furnish suitable fill materials and shall provide all moisture conditioning, compaction, testing, and other measures necessary to achieve the specified requirements.
3. Construct an initial burial area capable of accommodating at least 100 burial plots at the location generally shown on the Plans.
The Work shall include all clearing, grubbing, excavation, grading, filling, compaction, drainage, topsoil placement, stabilization, and related improvements necessary to provide suitable and stable areas for burial operations.
2 - 01010
The Contractor shall coordinate the construction and completion of the initial burial area with the Owner and shall sequence the Work to make the area available for cemetery use as early as practicable.
4. Construct storm drainage piping of various diameters, together with all associated structures, inlets, outlets, connections, fittings, bedding, backfill, testing, and appurtenances shown on the Plans.
Provide all excavation, shoring, dewatering, pipe installation, backfill, compaction, restoration, and incidental Work necessary for a complete and functional storm drainage system.
5. Construct the stormwater management facilities shown on the Plans, including all required excavation, embankment, grading, drainage structures, piping, outlet structures, stabilization, erosion and sediment control measures, and related improvements.
Complete all facilities in accordance with the Plans, Specifications, applicable permits, and requirements of the authorities having jurisdiction.
6. Construct the proposed paved cemetery access roads, including the proposed cul-de-sac, in accordance with the Plans and Specifications.
The Work shall include excavation, subgrade preparation, aggregate base, pavement, drainage, curbing or edge treatments, transitions, tie-ins, and all associated roadway improvements.
The Contractor shall provide suitable subgrade preparation and compaction and shall construct pavement sections in accordance with the
Plans and applicable specifications.
7. Design and construct three (3) uncovered landscape material storage bins as shown on the Plans.
The Contractor shall provide complete design, layout, materials, foundations, structural components, drainage, and construction necessary to provide complete and functional storage bins.
All design and construction shall comply with the Contract Documents and applicable codes and requirements.
8. Furnish and install all trees, shrubs, groundcover, and other landscape plantings shown on the approved Plans.
The Work shall include soil preparation, planting, staking or stabilization, watering, mulching, maintenance, replacement of unsuccessful plantings, and other Work necessary for proper establishment.
9. Furnish, install, maintain, inspect, repair, and remove erosion and sediment control measures required by the Contract Documents and applicable permits.
3 - 01010
Erosion and sediment control measures shall be installed and stabilized prior to commencement of associated clearing, grading, and earthwork activities.
The Contractor shall maintain effective erosion and sediment controls throughout construction and shall promptly repair or replace damaged or ineffective measures.
10. Coordinate all Work with existing utilities and facilities. Protect existing utilities, structures, roads, landscaping, cemetery facilities, monuments, graves, and other improvements designated to remain.
The Contractor shall verify existing conditions and shall coordinate utility locations and connections prior to excavation or construction activities that may affect existing facilities.
11. Restore all areas disturbed by construction that are not incorporated into permanent improvements.
Restoration shall include grading, topsoil placement, seeding, landscaping, stabilization, removal of temporary facilities, and other Work necessary to provide a complete and acceptable finished site.
12. Provide all required testing, inspections, certifications, and documentation necessary to demonstrate compliance with the Contract Documents.
The Contractor shall coordinate required inspections with the Owner and applicable authorities and shall provide sufficient advance notice to allow inspections to be scheduled without delaying the Work.
13. Furnish and perform all incidental Work necessary for complete execution of the project, whether specifically identified in the Contract Documents or reasonably necessary to construct and deliver the improvements shown on the Plans.
Such Work includes, but is not limited to, temporary facilities, construction access, protection of existing improvements, traffic and pedestrian control, temporary drainage, dewatering, site cleanup, removal of construction debris, final cleanup, and restoration.
14. The contractor’s baseline schedule must account for long lead times, as extended durations of inactivity will not be acceptable.
15. Provide all other items and appurtenances as indicated in the Contract
Documents.
PART 2 – PRODUCTS (Not Used)
PART 3 – EXECUTION (Not Used)
END OF SECTION
DIVISION 1 – GENERAL REQUIREMENTS
015600-1
SECTION 015600
TEMPORARY BARRICADRES
1.1 RELATED DOCUMENTS
Drawings and General Provisions of the Contract, including General and Special Conditions and General Requirements apply to the work in this section.
The latest edition of the Virginia Work Zone Area Protection Manual (WPAM) The latest edition of the Manual on Uniform Traffic Control Devices (MUTCD) The latest edition of the Northern Virginia Regional Park Authority (NVRPA)
1.2 DESCRIPTION OF WORK
This section shall include items indicated on the plans that relate to the temporary barricades, pedestrian and patron controls and all non-vehicular temporary controls to assist in the navigation around the work zone
1.3 QUALITY ASSURANCE
Comply with the latest edition of the Virginia Work Area Protection Manual:
Standards and Guidelines for Temporary Traffic Control, Manual on Traffic Control Devices and all Federal Regulations and Laws.
1.4 SUBMITTALS
Within 30 calendar days after receiving NOTICE OF AWARD, CONTRACTOR shall submit to the Department of Public Works a schedule for maintenance of traffic control plan.
1.5 SITE CONDITIONS
Comply with the submitted Maintenance of Traffic Plan (MOT) and Work Zone Safety Plan (submitted and approved prior to permits issued). Necessary changes to controls may be made by Town Staff as necessary.
PART 2 – PRODUCTS
Comply with VDOT approved manufacturer specifications.
015600-2
PART 3 – EXECUTION
Prior to beginning construction and preparing the work zone site, necessary barricades shall be placed along the W&OD trail and along the right-of-way. Upon the barricade placement, the superintendent of the job shall inspect the location of the barricades.
Traffic controls shall include barrels that are lighted along the trail for detours of pedestrians and non-motorized vehicles. Traffic control for the trail shall be in conformance with the Northern Virginia Regional Park Authority (NVRPA) Standards and Specifications.
Additional follow up placement and replacement of the barricades may be necessary if the environmental conditions change the construction zone changes and/or any unforeseen changes.
PART 4 – MEASUREMENT AND PAYMENT
Devices shall be included as part of the lump sum.
015639-1
SECTION 015639
TEMPORARY TREE AND PLANT PROTECTION
This section shall include items indicated on the plans that relate to the temporary tree and plant protection around the work zone.
Comply with the latest editions of the Virginia Erosion and Sediment Control Regulations, Fairfax County Public Facilities Manual, Town of Herndon Regulations and all other Federal Regulations and Laws. No damage to trees and plants located in these protected areas shall occur.
N/A
A. Brush Barrier – Std. & Spec 3.06
B. Tree Protection - Std. & Spec. III-393
C. Soil Stabilization & Matting – Std. & Spec. III-393
Comply with approved Virginia Erosion and Sediment Control manufacturer specifications and per the construction plans.
Prior to beginning construction and preparing the work zone site, necessary tree and plant protection shall be placed. Upon the tree and plant protection placement, the superintendent of the job shall inspect the location of the protection.
015639-2
Periodic maintenance on controls shall occur on a weekly basis and/or as required to keep the protection devices operating correctly.
Additional follow up placement and replacement of the tree and plant protection may be necessary if the environmental conditions change the construction zone changes and/or any unforeseen changes.
015713-1
SECTION 015713
TEMPORARY EROSION AND SEDIMENT CONTROLS
This section shall include items indicated on the plans that relate to the temporary erosion and sediment controls around the work zone.
Comply with the latest editions of the Virginia Erosion and Sediment Control Regulations and all other Federal, State, and Local Regulations and Laws.
The implementation of the ESPC measures and the construction, performance monitoring, maintenance, replacement, and upgrading of the ESPC measures are the responsibility of the Contractor until all construction is completed and accepted and vegetation/landscaping is established.
N/A
1.5 SITE CONDITIONS:
The following erosion and sediment controls are recommended:
A. Inlet Protection - Std. & Spec. 3.07
B. Temporary Soil Stabilization – Std. & Spec. 3.31
1. Temporarily stabilize all areas, not permanently constructed upon within 7 calendar days, after completion of clearing and earthwork operations.
C. Permanent Soil Stabilization – Std. & Spec. 3.32
015713-2
All materials shall comply with the Virginia Erosion and Sediment Control Handbook, latest edition. Additional erosion and sediment controls may be required to accommodate field conditions during construction. CONTRACTOR shall accommodate modifications to the erosion and sediment controls as necessary, at no additional cost to the contract.
3.1 SEQUENCING
A. Install inlet protection on existing structures, silt fence & perimeter controls, and tree and plant protection before beginning any construction activities.
B. Install temporary seeding as required, in accordance with Virginia E & S Std.
& Spec. 3.31
C. Install permanent soil stabilization as required, and in accordance with Section 02900.
3.2 MAINTENANCE:
A. Maintain soil erosion and sediment controls and tree protection devices, until authorized by the Town of Herndon to remove the controls, at no increase to the Contract Sum.
B. Maintain adjoining streets in a clean and mud-free condition. Maintain project area in a dust-free condition.
C. Maintain devices as directed in the Virginia Erosion and Sediment Control
Handbook, latest edition.
3.3 REMOVAL
A. General
1. Obtain written authorization from the Town of Herndon Erosion
Control Inspector before removing soil erosion and sediment controls.
2. Grade areas affected by removal operations to existing or finish grades indicated, and seed and mulch.
PART 4 - MEASUREMENT AND PAYMENT:
015713-3
015723-1
SECTION 015723 - STORMWATER POLLUTION PREVENTION AND CONSTRUCTION
STORMWATER PERMIT COMPLIANCE
1. GENERAL REQUIREMENTS
The Owner has included the project Stormwater Pollution Prevention Plan (SWPPP), prepared as part of the project design, in the Contract Documents. The Contractor shall review the SWPPP and all applicable erosion and sediment control plans, stormwater management plans, permit conditions, and related environmental requirements before commencing construction.
The Contractor shall be responsible for implementing, maintaining, inspecting, documenting, and updating the SWPPP as required by the Contract Documents and applicable federal, Commonwealth of Virginia, and local regulations.
2. GENERAL VPDES PERMIT COVERAGE
The Contractor shall be responsible for obtaining coverage under the applicable Virginia
Department of Environmental Quality (DEQ) General VPDES Permit for Discharges of
Stormwater from Construction Activities, including submission of the required registration statement and supporting documentation to the appropriate Virginia Stormwater Management
Program (VSMP) authority or DEQ, as applicable.
Before commencing any land-disturbing activity requiring permit coverage, the Contractor shall provide the Owner with documentation demonstrating that the required permit coverage has been obtained and accepted. The Contractor shall comply with all applicable permit conditions for which it is the responsible operator and shall maintain such coverage for the duration of its regulated construction activities, until properly terminated or transferred in accordance with applicable requirements.
The Contractor shall coordinate with the Owner and the Owner's designated representative to establish the appropriate permittee/operator arrangement and complete any required permit application, transfer, modification, or other regulatory documentation. No transfer or change of permit responsibility shall be considered effective solely by execution of the construction
Contract.
3. SWPPP IMPLEMENTATION AND MAINTENANCE
The Contractor shall maintain a current copy of the project SWPPP, the applicable General
VPDES Permit, the permit registration and coverage documentation, and all required inspection and corrective-action records at the construction site or at another location permitted by applicable regulations.
The Contractor shall review the design SWPPP and revise or supplement it as necessary to reflect actual construction activities, sequencing, site conditions, pollutant sources, temporary facilities, and changes in erosion and sediment controls. All revisions shall comply with
015723-2 applicable permit requirements and shall be coordinated with the Owner and the appropriate regulatory authority when required.
The Contractor shall not implement a material change to the approved erosion and sediment control or stormwater management measures without obtaining the required review and approval.
4. INSPECTIONS, DAILY LOGS, AND CORRECTIVE ACTIONS
The Contractor shall designate qualified personnel to perform the inspections required by the applicable General VPDES Permit and the Contract Documents. Inspections shall be performed at the frequency and in the manner prescribed by the applicable permit and shall be documented in the SWPPP inspection records.
In addition, the Contractor shall maintain a daily construction stormwater log documenting, at a minimum, construction activities affecting stormwater controls, significant rainfall or runoff events when relevant, the condition of erosion and sediment controls, deficiencies observed, corrective actions taken, and any other information required by the Owner or applicable permit.
The Contractor shall promptly correct deficiencies in erosion and sediment controls and implement corrective actions within the timeframes required by the applicable permit. Inspection reports, daily logs, corrective-action records, SWPPP revisions, and other required documentation shall be made available to the Owner and regulatory authorities upon request.
5. COOPERATION AND CLOSEOUT
The Contractor shall cooperate with the Owner, the Owner's designated representative, the
VSMP authority, and DEQ in all matters relating to construction stormwater compliance. The
Contractor shall promptly notify the Owner of any notice of violation, inspection finding, discharge incident, permit noncompliance, or other material stormwater compliance issue relating to the Work.
Before final acceptance, the Contractor shall submit to the Owner copies of the final SWPPP, required inspection and daily log records, corrective-action documentation, permit correspondence, and any other required closeout documents. The Contractor shall complete all required permit termination or transfer documentation for which it is responsible and shall coordinate such actions with the Owner. Permit termination shall not occur until the applicable regulatory requirements have been satisfied and the appropriate authority has accepted the termination, where required.
6. COST OF COMPLIANCE
The Contractor shall include in its Contract Price all labor, materials, equipment, administrative effort, inspections, documentation, permit application and maintenance fees, and other costs necessary to fulfill its obligations under this Section, except for costs expressly identified elsewhere in the Contract Documents as the Owner's responsibility.
015723-3
Failure to comply with this Section shall constitute a failure to perform the Contract requirements and shall be subject to the applicable Contract remedies, without limiting any independent regulatory obligations or liabilities imposed by law.
DIVISION 2 – EXISTING CONDITIONS
024100-1
SECTION 024100
DEMOLITION
PART 1 - GENERAL
Contractor shall demolish, remove and dispose offsite at his expense, the following:
existing asphalt pavement and concrete; existing driveway aprons; existing curb and gutter; existing sidewalk; and other demolished items, all to the extent shown on the contract drawings. Items to be removed and replaced or relocated shall be protected and stored by Contractor during construction.
Perform demolition work in compliance with applicable requirements of Town of Herndon and Virginia Department of Transportation Road and Bridge Specifications (VDOT Specifications).
Within 30 calendar days after receiving NOTICE OF AWARD, CONTRACTOR shall submit to the Department of Public Works a schedule for demolition and relocation work.
1.5 EXISTING CONDITIONS
A. Conduct demolition to minimize interference with adjacent structures, building areas, traffic on adjacent streets and work by others.
B. Provide, erect, and maintain temporary barriers, security devices, and tree protection.
C. Conduct operations with minimum interference to public or private thoroughfares.
Maintain protected egress and access to residences/businesses at all times.
D. Do not close or obstruct roadways, driveways, trails or sidewalks without permits.
PART 2 - PRODUCTS
Not used.
DIVISION 2 – EXISTING CONDITIONS
024100-2
PART 3 - EXECUTION
3.1 PREPARATION
A. Notify adjacent property owners of work which may affect their property or could cause potential noise or disruption.
B. Prevent movement or settlement of adjacent structures. Provide bracing and shoring.
C. Protect existing plant life and structures.
D. Protect existing items which are not indicated to be removed.
3.2 EXECUTION
A. Remove existing asphalt pavement as required to install proposed water systems as shown on the plans, and as required for the reconstruction of the roadway.
B. Demolish indicated components in an orderly and careful manner, as shown on the plans.
C. Cease operations and notify the DPW immediately if adjacent structures appear to be in danger. Do not resume operations until corrective measures have been taken.
D. Backfill excavations, open pits and holes that are a result of demolition. Use soil types and compact as specified in Section 310100.
E. Rough grade and compact areas affected by demolition to maintain site grades and contours.
3.3 EXECUTION - SELECTIVE DEMOLITION
A. Demolish and remove components in an orderly and careful manner.
3.4 CLEAN UP
A. Remove demolished materials from site as work progresses.
B. Upon completion of work, leave areas in clean condition.
PART 4 - MEASUREMENT AND PAYMENT
A. Demolition work shall be included as part of the lump sum.
DIVISION 3 – CONCRETE
033000-1
SECTION 033000
CAST-IN-PLACE CONCRETE
1.2 RELATED DOCUMENTS
1.3 DESCRIPTION OF WORK
A. Contractor shall place cast-in place concrete as indicated per the construction plans and as denoted in the General Provisions of the Contract, including General and Special Conditions and General Requirements apply to the work in this section.
B. Concrete shall be 4000 psi strength in all applications
1.4 QUALITY ASSURANCE
A. Perform demolition work in compliance with applicable requirements of the latest edition of the Virginia Department of Transportation Road and Bridge Specifications (VDOT Specifications), Sections 217, Section 223, and Section 502
B. Perform demolition work in compliance with applicable requirements of the latest edition of the Virginia Department of Transportation Road and Bridge Specifications (VDOT Specifications), Volume I and II.
C. Perform demolition work in compliance with applicable requirements of the latest edition of ACI 301
D. Testing – CONTRACTOR shall employ, at no additional cost to the Town, an adequate geotechnical testing company to perform acceptance tests, including but not limited to minimum compressive strength (28 day cylinder break for regular portland cement, 7 day cylinder break for high-early cement), maximum water-cement ratio, and air content. Geotechnical field inspections and testing shall be conducted during concrete placement operations, at frequencies and intervals specified in the contract documents. Selected geotechnical company shall be acceptable to the Department of Public Works. In accordance with General Terms Section 5.14.4, the CONTRACTOR shall pay for all inspections, tests and certifications which the Contract specifically requires him to perform or pay. The CONTRACTOR is hereby specifically required to obtain and pay for said testing services.
1.5 SUBMITTALS
A. The CONTRACTOR shall provide a design mixture for the concrete (from the plant)
033000-2 that is within the specifications of Virginia Department of Transportation Road and Bridge Specifications (VDOT Specifications), prior to the pour of the concrete.
B. The CONTRACTOR shall provide shop drawings and/or product data sheets for reinforcing that is to be placed within the concrete. This information is not limited to, but can include, detail fabrication, bending, placement of reinforcement, mechanical conditions, supports, etc.
C. Material Certificates – Provide copies of material certificates signed by material producer and contractor, certifying that each material item complies with, or exceeds, specified requirements.
D. Field reports for acceptance testing in accordance with ASTM C 172, ASTM C 143, ASTM C 31, ASTM C 39, and ASTM D 231, except that certificates, signed by the concrete producer and CONTRACTOR may be submitted in lieu of material testing for air content and water content, when acceptable by Owner.
A. Materials used under this section shall conform to VDOT Road and Bridge Specifications Section 217, Section 223, and Section 502.
B. All concrete material shall be ready-mix, or from mobile production plants, as permitted in VDOT Specification Section 217. Hand mixing and small batch mixing on job site will not be accepted.
3.1 EXAMINATION AND PREPARATION
A. Verify that subgrade, granular subbase, or surface areas are ready to support concrete placement. Compaction testing shall be performed in accordance with Section 02200.
B. Moisten surface to minimize water absorption from new concrete.
C. Verify proper placement of forms or guides to ensure uniform installation of new concrete
D. Install reinforcing materials and expansion materials as required
3.2 INSTALLATION OF CONCRETE
A. Method of execution under this section shall conform to VDOT Road and Bridge Standard Specification, Sections 302 for cast-in-place storm drain structures, Section 316 for driveway aprons, Section 502 for Curb and Gutter, and Section 504 for sidewalk.
B. Do not allow concrete to drop freely from heights greater than 3 feet for exposed
033000-3 concrete and not greater than 5 feet for unexposed work (buried work). Concrete shall not be placed on frost, mud, loose, unsound, or other detrimental surfaces.
C. Contractor shall ensure that excess concrete does not splash or run onto adjoining property. Any excess spillage shall be cleaned up promptly and properly disposed of.
D. Contractor shall ensure that concrete trucks do not wash excess concrete from chutes or delivery equipment into the public right-of-way or onto private property.
Contractor shall provide an adequate area for the cleaning of concrete trucks, and shall remove any excess concrete as necessary and dispose of properly.
Cast-In-Place Concrete shall be included as part of the lump sum for each of the bid items, as appropriate.
033100-1
SECTION 033100
CONCRETE FORMS AND FORMWORK
Contractor shall place, install, adjust and remove all forms and formwork as necessary for cast-in place concrete a as indicated per the construction plans and as denoted in the General Provisions of the Contract, including General and Special Conditions and General Requirements apply to the work in this section. Forms shall be either wood of steel designed to meet the conditions specified herein.
A. The formwork shall be designed for the loads, lateral pressure, and allowable stresses outlined in "Recommended Practice for Concrete Formwork", ACI 347 and for design considerations, wind loads, allowable stresses and other applicable requirements of the local building code. The design and construction of the formwork shall be the responsibility of the Contractor. Form design shall be certified by a Registered Structural Engineer.
B. The formwork shall be true in every respect to produce hardened concrete to the required shape, size, grade, and alignment as indicated on the Construction Drawings, and of sufficient strength, bracing, and rigidity to maintain their position and shape under the loads incidental to placing and curing the concrete, as well as other forces resulting from the movement of the forms. The forms shall be mortar-tight at the time concrete is placed in them and shall be so constructed that the surfaces of the finished concrete will be reasonably free from ridges, fins, offsets, or similar defects. Adequate and suitable means for removing the forms without injury to the surfaces or edges of the finished concrete shall be provided.
C. Formwork shall be constructed such that the hardened surfaces shall conform to the tolerance limits of ACI 347.
FORMS AND ACCESSORIES
A. Plywood forms will be grade marked Exterior Grade, B-B Concrete Form or High
Density Overlay (HDO) Concrete Form B-B, conforming to the requirements of the NIST Voluntary
033100-2
Product Standard PS-1, Plywood.
B. Metal Forms will use smooth metal plate free of surface irregularities.
C. Hardboard forms will be tempered, smooth one side, not less than 3/16 inch thick conforming to the requirements of ANSI 135.4, Basic Hardboard.
D. Form ties will be factory fabricated, snap-off metal type of adequate design to minimize form deflection and preclude concrete spalling upon removal.
E. Form ties will be fabricated so that set back in the concrete is such that the portion of the tie remaining after snap-off and removal of the exterior portions is at least 1-1/2 inches back from the concrete surface.
F. Form coating will be non-grain-raising and non-staining resin or polymer type that will not leave residual matter on the surface of the concrete or adversely affect bonding to concrete of paint, plaster, mortar, protective coatings, waterproofing or other applied materials. Coatings containing mineral oils, paraffin, and other non-drying ingredients are not permitted. For concrete surfaces contacting potable stored water, the coatings and form release agents shall be completely non-toxic and approved by the EPA for the intended use.
PRODUCT DELIVERY, STORAGE AND HANDLING
Store and handle form coating to prevent contamination of coating in accordance with manufacturer's recommendation.
Field verification and inspection notes will verify the correct forms and formwork
Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.
1. Plywood, metal or other approved panel materials.
2. Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows:
a. High-density overlay, Class 1 or better.
b. Medium-density overlay, Class 1 or better; mill-release agent treated and edge sealed.
c. Structural 1, B-B or better; mill oiled and edge sealed.
d. B-B (Concrete Form), Class 1 or better; mill oiled and edge sealed
033100-3
3.1 FABRICATION
A. Use forms that conform to ACI 347. Fabricate with facing materials that produce the specified tolerance requirements of ACI Special Publication No. 4, Formwork for Concrete, produce true surfaces, sharp corners and true lines and are free of offsets, ridges, bulging, waves and concave or convex areas.
B. Use regular and uniform pattern; long dimension of panels vertical; joints horizontal, vertical and aligned; form ties uniformly spaced and aligned in horizontal and vertical rows.
3.2 PREPARATION
A. Forms shall not be reused if there is any evidence of surface wear and tear or defects which would impair the quality of the surface. All surfaces of forms and embedded materials shall be cleaned of any mortar from previous concreting and of all other foreign material or water before coating is placed on them.
B. Forms shall be coated in accordance with manufacturer's recommendations before the form or reinforcement is placed in final position. Surplus coating on form surfaces, or any coating on reinforcing steel and construction joints shall be removed before placing concrete.
3.3 INSTALLATION, REMOVAL AND SHORING
A. Installation of forms will comply with the following requirements:
1. Forms shall be sufficiently tight to prevent loss of mortar from the concrete, set true to the lines and elevations indicated on the Drawings, tied, and braced to remain true during and after concrete placement within tolerances of Part 2.1 of this Specification.
The Project Manager may at any time condemn any section or sections of forms found deficient in any respect, and such form shall be promptly removed and replaced.
2. No wooden spreaders shall be allowed to remain in the concrete.
3. Place chamfer strips in forms to bevel all corners, edges, joints and other structural elements exposed to views, including use of dummy chamfer and false joints to provide neat and uniform appearance. Exposed corners and edges shall have 1-inch x 1-inch - 45 degree chamfers, unless otherwise indicated on the Construction Drawings.
4. Provide temporary openings at the base of wall forms and at the other points when necessary to facilitate cleaning and inspection immediately before depositing concrete.
5. Secure in position wedges used for final alignment and items to be embedded in
033100-4 concrete.
6. Forms for keyways shall be prepared in advance of pouring concrete. Keyway forms in slab edges and vertical wall joints shall be rigidly secured in place before the concrete is poured. Forms for keyways for horizontal joints in walls may be placed at the conclusion of the pour, but proper provision shall be made for obtaining and holding the full depth and form of the keyway.
B. Adjustment of forms will comply with the following requirements:
1. Positive means of adjustment should be provided to permit realignment or readjustment of shores if excessive settlement occurs.
2. A pair of wedges may be used at the top or bottom of shores, but not at both ends, to facilitate vertical adjustment, to correct uneven settlements, or to facilitate dismantling of the formwork.
3. Screw jacks for pipe shores or scaffold-type shoring may be used both top and bottom so long as they are secured by the shore or scaffold leg against loosening or falling out, to avoid lateral deflections.
4. During and after concreting, but before initial set of the concrete, the elevations, camber, and plumbness of formwork systems shall be checked, using telltale devices.
Appropriate adjustments shall be promptly made where necessary. If, during construction, any weakness develops and the formwork shows any undue settlement or distortion, the Work shall be stopped, the affected construction removed if permanently damaged, and the formwork strengthened.
3.4 EMBEDDED ITEMS
A. Items to be embedded in concrete shall be free from oil or foreign matter that would weaken the bonding of the concrete to these items.
C. Install in the formwork requisite inserts, anchors, sleeves, and other items specified under other sections of these Specifications. Close ends of conduits, piping, and sleeves embedded in concrete with caps or plugs.
D. Concrete pads, curbs, pedestals, and similar means devised by the Contractor to support the forms will be subject to review by the Project Engineer.
E. Before depositing concrete, check the location and support of items which are to be wholly or partially embedded.
E. Place reinforcement so that there will be a clear distance of at least 2 inches between the reinforcement and any anchor bolts or other embedded metal work.
3.5 FIELD QUALITY CONTROL
033100-5
A. Construct elements to meet the allowable tolerances of the dimensions, elevations, and positions specified in Specification 033000.
B. Deposit concrete only when the forms and placement of the reinforcement has been checked and approved by the Project Manager. The Contractor shall provide notice to the Project Engineer at least 24 hours in advance of any contemplated concrete pour.
3.6 JOINTS
A. Unless otherwise directed, make contraction, expansion, and construction joints only where shown.
B. Continue reinforcing steel and wire fabric across construction joints which are not indicated as being free to move.
3.7 REMOVAL OF FORMS, FALSE WORK AND CENTERING
Maintain forms, false work, and centering in place until the concrete has attained the minimum percentage of specified design strength for the structural members to carry their own weight and any loads to which they will be subjected without exceeding the permissible stresses and without deforming.
Concrete Forms and Formwork shall be included as part of the lump sum for each of the bid items, as appropriate.
033500-1
SECTION 033500
CONCRETE FINISHING
Concrete shall be finished in accordance with the latest Virginia Department of Transportation Specifications and Standards and all Federal Regulations and Laws.
Were applicable, CG-12 detectible warnings surfaces shall be installed as depicted on the construction plans and in accordance with Section 321700.
A. Comply with the latest VDOT Road and Bridge Specifications:
1. Exposed Aggregate Finish C504C00-0708
2. CG-12 Detectable Warning Surface S504B00
3. Patching Hydraulic Cement Concrete Pavement S509B01
4. Driveway Aprons Section 316
5. Curb and Gutter Section 502
6. Sidewalk Section 504
B. Comply with the latest edition of the VDOT Road and Bridge Standards, Volume I and II.
Material Certificates – Provide copies of material certificates signed by material producer and contractor, certifying that each material item complies with, or exceed, specified requirements.
A. Concrete finishing to be completed after Cast-In-Place Concrete (Section 033000) has been completed.
B. CG-12 Detectable Warning surface to be installed per the directions of the manufacturer and Section 321700.
033500-2
C. CG-12 Detectable Warning surface domes to be pointed towards the direction of travel
Comply with VDOT approved manufacturer specifications and Drawings and General Provisions of the Contract, including General and Special Conditions and General Requirements apply to the work in this section.
A. Repair of Surface Defects (repair of improperly placed or finished concrete):
1. Surface defects, unless otherwise specified by the CONTRACT DOCUMENTS, shall be repaired immediately after form removal, but not before review by ENGINEER.
The surface temperature of the concrete shall be fifty degrees Fahrenheit (50oF) and rising. CONTRACTOR shall measure surface temperatures when requested by OWNER. If necessary, CONTRACTOR shall enclose and heat the area to be repaired to bring the surface temperature of the concrete and air temperature to acceptable levels, and to permit proper curing.
2. All honeycombed and other defective concrete shall be removed down to sound concrete. If chipping is necessary, the edges shall be perpendicular to the surface or slightly undercut. Feathered edges shall not be permitted. The area to be patched and an area at least six (6) inches wide surrounding it shall be dampened to prevent absorption of water from the patching mortar. A bonding grout shall be prepared, mixed to the consistency of thick cream, and after surface water has evaporated from the area to be patched, well brushed into the surface.
3. When the bond coat begins to lose the water sheen, the premixed patching mortar shall be applied. The mortar shall be thoroughly consolidated into place and struck off so as to leave the patch slightly higher than the surrounding surface. To permit initial shrinkage, it shall be left undisturbed for at least one (1) hour before being finally finished. The patched area shall be kept damp for seven (7) days. Metal tools shall not be used in finishing a patch in a formed wall that shall be exposed.
B. Finishing of Unformed Surfaces: Unless otherwise shown on the DRAWINGS unformed surfaces shall be finished as follows:
1. No wetting of concrete surfaces during slab finishing operations shall be permitted.
Further, no concrete finishing operation shall be permitted while there is water on the surface of slabs and other flatwork.
2. Finishes that are exposed and subject to foot traffic shall receive a broom finish with a texture of plus or minus one-sixteenth (± 1/16) inch or as designated on the construction plans and/or per VDOT Specifications.
033500-3
3. Finishes shall promote positive drainage along the cross slope of the concrete.
4. Stairways and Sidewalks: Strike smooth tops of stairs and sidewalks and finish with a light broom providing a texture of plus or minus one-sixteenth (±1/16) inch or as designated on the construction plans and/or per VDOT Specifications.
C. CG-12 Detectable Warning Devices. Install per manufacturer specifications and recommendations and per Section 321700.
Concrete finishing shall be included as part of the lump sum.
DIVISION 31 –EARTHWORK
311100-1
SECTION 311100
CLEARING AND GRUBBING
1.1 DESCRIPTION OF WORK
A. Remove surface debris from site (e.g. designated plant life, including stumps, grass areas, and miscellaneous debris) as shown on the plans and necessary to construct the proposed improvements.
B. Grading of disturbed areas shall be provided to match final grading as shown on contract drawings.
1.2 REGULATORY REQUIREMENTS
Comply with all applicable requirements of the Town of Herndon Department of Public
Works (DPW) and Virginia Department of Transportation (VDOT) Road and Bridge Specifications.
Not used.
3.1 PROTECTION
A. Protect utilities from damage including electric/power poles as labled in plans.
B. Protect private property including but not limited to: mailboxes, landscaping, shrubbs, roof drains, yard lighting, fences, etc.
C. Protect trees, plant growth, and existing structures. Notify the Department of Public Works immediately if adjacent trees, plants or structures appear to be in danger. Do not resume work until corrective measures have been taken. Any fences required to be temporarily removed must be reinstalled to the satisfaction of the Department of Public Works.
D. Protect survey benchmarks. Mark and reference points from displacement or damage.
3.2 CLEARING
A. Clear areas required for access to site and execution of Work.
B. Remove items shown on the plans and as necessary to construct the proposed
311100-2 improvements.
C. Temporarily remove any fences required to install proposed improvements.
3.3 CLEAN UP
A. Remove debris and extracted plant life from site.
B. Burning of debris and extracted plant life on site is prohibited.
A. Site clearing and grubbing work shall be included as part of the lump sum.
311300-1
SECTION 311300
SELECTIVE TREE AND SHRUB REMOVAL AND TRIMMING
GENERAL
RELATED DOCUMENTS
Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
The contractor to contact the Town of Herndon Community Forester prior to making any selective tree, shrub removal and/or trimming.
SUMMARY
This Section includes the protection and trimming of trees that interfere with, or are affected by, execution of the Work, whether temporary or new construction.
Related Sections include the following:
Section "Clearing and Grubbing" for removal limits of trees, shrubs, and other plantings affected by new construction.
Section "Earthwork" for structures and utility trench excavation, backfilling, compacting and grading requirements, and soil materials.
Section "Planting" for tree and shrub planting and transplanting, tree support systems, and soil materials.
SUBMITTALS
Product Data: For each type of product indicated.
Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.
Certification: From a qualified arborist that trees indicated to remain have been protected during construction according to recognized standards and that trees were promptly and properly treated and repaired when damaged.
Maintenance Recommendations: From a qualified arborist – Town of Herndon Community Forester will make a recommendation for care and protection of trees affected by construction during and after completing the Work.
311300-2
QUALITY ASSURANCE
Tree Service Qualifications: An experienced tree service firm that has successfully completed tree protection and trimming work similar to that required for this Project and that will assign an experienced, qualified arborist to Project site on a full-time basis during execution of the Work.
Arborist Qualifications: An arborist certified by the International Society of Arboricultural or licensed in the jurisdiction where Project is located.
Tree Pruning Standards: Comply with ANSI A300, "Trees, Shrubs, and Other Woody Plant Maintenance--Standard Practices," unless more stringent requirements are indicated.
Preinstallation Conference: Conduct conference at Project site.
Before starting tree protection and trimming, meet with representatives of authorities having jurisdiction, Owner, Architect, consultants, and other concerned entities.
Review tree protection and trimming procedures and responsibilities. Notify participants at least three working days before convening conference. Record discussions and agreements and furnish a copy to each participant.
PRODUCTS
MATERIALS
Drainage Fill: Selected crushed stone, or crushed or uncrushed gravel, washed, ASTM D 448, Size 24, with 90 to 100 percent passing a 2-1/2-inch sieve and not more than 10 percent passing a 3/4-inch sieve.
Topsoil: Fertile, friable, surface soil, containing natural loam and complying with ASTM D 5268. Provide topsoil that is free of stones larger than 1 inch in any dimension, free of other extraneous or toxic matter harmful to plant growth, and free of invasive or noxious weed plants or seed. Obtain topsoil only from well-drained sites where soil occurs in depth of 4 inches or more; do not obtain from bogs or marshes.
Filter Fabric: Manufacturer's standard, nonwoven, pervious, geotextile fabric of polypropylene, nylon, or polyester fibers.
Chain Link Fence: Metallic-coated steel chain link fence fabric, 0.120-inch-diameter wire size; 48 inches high, minimum; line posts, 1.9 inches in diameter; terminal and corner posts, 2-3/8 inches in diameter; top rail, 1-5/8 inches in diameter; bottom tension wire,
0.177 inch in diameter; with tie wires, hog ring ties, and other accessories for a complete fence system.
EXECUTION
PREPARATION
311300-3
Temporary Fencing: Install temporary fencing located as indicated or outside the drip line of trees to protect remaining vegetation from construction damage.
Install chain link fence according to ASTM F 567 and manufacturer's written instructions.
Protect tree root systems from damage due to noxious materials caused by runoff or spillage while mixing, placing, or storing construction materials. Protect root systems from flooding, eroding, or excessive wetting caused by dewatering operations.
Do not store construction materials, debris, or excavated material within the drip line of remaining trees. Do not permit vehicles or foot traffic within the drip line; prevent soil compaction over root systems.
Do not allow fires under or adjacent to remaining trees or other plants.
EXCAVATION
Install shoring or other protective support systems to minimize sloping or benching of excavations.
Do not excavate within drip line of trees, unless otherwise indicated.
Where excavation for new construction is required within drip line of trees, hand clear and excavate to minimize damage to root systems. Use narrow-tine spading forks and comb soil to expose roots.
Relocate roots in backfill areas where possible. If encountering large, main lateral roots, expose roots beyond excavation limits as required to bend and relocate them without breaking. If encountered immediately adjacent to location of new construction and relocation is not practical, cut roots approximately 3 inches back from new construction.
Do not allow exposed roots to dry out before placing permanent backfill. Provide temporary earth cover or pack with peat moss and wrap with burlap. Water and maintain in a moist condition. Temporarily support and protect roots from damage until they are permanently relocated and covered with soil.
Where utility trenches are required within drip line of trees, tunnel under or around roots by drilling, auger boring, pipe jacking, or digging by hand.
Root Pruning: Do not cut main lateral roots or taproots; cut only smaller roots that interfere with installation of utilities. Cut roots with sharp pruning instruments;
do not break or chop.
REGRADING
Grade Lowering: Where new finish grade is indicated below existing grade around trees, slope grade beyond drip line of trees. Maintain existing grades within drip line of trees or as recommended by qualified arborist.
311300-4
Root Pruning: Prune tree roots exposed during grade lowering. Do not cut main lateral roots or taproots; cut only smaller roots. Cut roots with sharp pruning instruments; do not break or chop.
Minor Fill: Where existing grade is 6 inches or less below elevation of finish grade, fill with topsoil. Place topsoil in a single uncompacted layer and hand grade to required finish elevations.
Moderate Fill: Where existing grade is more than 6 inches, but less than 12 inches, below elevation of finish grade, place drainage fill, filter fabric, and topsoil on existing grade as follows:
Carefully place drainage fill against tree trunk approximately 2 inches above elevation of finish grade and extend not less than 18 inches from tree trunk on all sides. For balance of area within drip-line perimeter, place drainage fill up to 6 inches below elevation of grade.
Place filter fabric with edges overlapping 6 inches minimum.
Place fill layer of topsoil to finish grade. Do not compact drainage fill or topsoil. Hand grade to required finish elevations.
TREE PRUNING
Prune remaining trees affected by temporary and new construction.
Prune remaining trees to compensate for root loss caused by damaging or cutting root system.
Provide subsequent maintenance during Contract period as recommended by qualified arborist.
Pruning Standards: Prune trees according to ANSI A300:
Type of Pruning: Crown cleaning.
Cut branches with sharp pruning instruments; do not break or chop.
Chip branches removed from trees. Spread chips where indicated or as directed by the Town of Herndon.
TREE REPAIR AND REPLACEMENT
Promptly repair trees damaged by construction operations within 24 hours. Treat damaged trunks, limbs, and roots according to written instructions of the qualified arborist.
Remove and replace dead and damaged trees that the qualified arborist determines to be incapable of restoring to normal growth due to damage caused by the construction activity. Coordinate with the Town Urban Forester for determination.
Aerate surface soil, compacted during construction, 10 feet beyond drip line and no closer than 36 inches to tree trunk. Drill 2-inch- diameter holes a minimum of 12 inches deep at 24 inches o.c. Backfill holes with an equal mix of augured soil and sand.
DISPOSAL OF WASTE MATERIALS
311300-5
Burning is not permitted.
Disposal: Logs, stumps, roots, brush, rotten wood, and other refuse from the clearing and grubbing operations, which shall also include…
This is the start of the file's text. The full file is on GovTribe.