This document is a Schedule of Items for a federal contract opportunity to decommission the Allison and Ericson dam complexes and restore the drainage to a native wetland habitat. The contract is broken into a Base option to decommission the two primary dams and restore the immediate areas, as well as an Option to decommission the remaining dams/impoundments and restore the associated areas. The Schedule of Items lists the various line items and estimated quantities for the work, including mobilization, clearing and grubbing, earthwork, road construction, planting and seeding, and stream restoration. The contract opportunity is solicitation number 1240LU24R0020 issued by the Department of Agriculture Forest Service for the Nez Perce Clearwater National Forest. The location of the work is approximately 15 miles west of Elk City, Idaho.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| Schedule of Items: Allison Ponds 2-4 & Ericson Ponds 2-7 - Option - Deconstruction and Restoration | ||||||
| Item No. | Description | Quantity | Unit | Unit Price | Cost | Assumptions and Comments |
| Initial Construction | ||||||
| 15101 | Mobilization and Demobilization | 1 | LS | $___________ | $___________ | |
| 15201 | Construction Staking and Survey | 1 | LS | $___________ | $___________ | |
| 63001 | Control of Water | 1 | LS | $___________ | $___________ | |
| 10508 | Handling of Hazardous Materials | 1 | LS | $___________ | $___________ | |
| 20101 | Clearing and Grubbing of Allison Ponds 2-4 | 2,100 | SY | $___________ | $___________ | Areas with Trees and Brush Only |
| 20101 | Clearing and Grubbing of Ericson Ponds 2-7 | 5,000 | SY | $___________ | $___________ | Areas with Trees and Brush Only |
| Reclamation Earthwork | ||||||
| 20422, 62406 | Allison Ponds 2-4 Topsoil Stripping, Stockpiling, and Replacement | 4,000 | SY | $___________ | $___________ | Top soil to be stripped for all distubance areas and replaced to speed up reclamation. |
| 20422, 62406 | Ericson Ponds 2-7 Topsoil Stripping, Stockpiling, and Replacement | 15,100 | SY | $___________ | $___________ | |
| 20403 | Embankment Removal Excavation - Allison Ponds 2-4 | 827 | CY | $___________ | $___________ | |
| 20403 | Embankment Removal Excavation - Ericson Ponds 2-7 | 2,521 | CY | $___________ | $___________ | |
| 64805 | Place Embankment Material from Allison Ponds 2-4 into Repositories | 893 | CY | $___________ | $___________ | Assume capping of soils is incidental to this item. A swell of 8% has been applied. |
| 64805 | Place Embankment Material from Ericson Ponds 2-7 into Repositories | 2,723 | CY | $___________ | $___________ | Assume capping of soils is incidental to this item. A swell of 8% has been applied. |
| 30107 | Select Soil Borrow for Allison Ponds 2-4 Restoration | 150 | CY | $___________ | $___________ | Additonal soil needed for creating berms or channels. |
| 30107 | Select Soil Borrow for Ericson Ponds 2-7 Restoration | 300 | CY | $___________ | $___________ | Additonal soil needed for creating berms or channels. |
| 30106 | Microtopography Grading - Allison Ponds 2-4 | 1,695 | SY | $___________ | $___________ | Rough and Loose in areas upstream of embankments and not under water |
| 30106 | Microtopography Grading - Ericson Ponds 2-7 | 1,670 | SY | $___________ | $___________ | Rough and Loose in areas upstream of embankments and not under water |
| 25201 | Allison Ponds 2-4 Channel Grading | 50 | CY | $___________ | $___________ | |
| 25201 | Ericson Ponds 2-7 Channel Grading | 330 | CY | $___________ | $___________ | |
| Road Access Construction | ||||||
| 30301 | New Temporary Road Construction - Allison Ponds 2-4 | 0.3 | MI | $___________ | $___________ | |
| 30301 | New Temporary Road Construction - Ericson Pond 2-7 | 0.2 | MI | $___________ | $___________ | |
| 30301 | New Temporary Road Construction on Existing Template - Allison Pond 2-4 | 0 | MI | $___________ | $___________ | |
| 30301 | New Temporary Road Construction on Existing Template - Ericson Pond 2-7 | 0.2 | MI | $___________ | $___________ | |
| 30301 | Improvements to Existing Roads - Allison Ponds 2-4 | 0 | MI | $___________ | $___________ | |
| 30301 | Improvements to Existing Roads - Ericson Ponds 2-7 | 1.4 | MI | $___________ | $___________ | |
| 21103 | Road Obliteration - Allison Ponds | 0.3 | MI | $___________ | $___________ | |
| 21103 | Road Obliteration - Ericson Ponds | 0.4 | MI | $___________ | $___________ | |
| 15706 | 24" Culvert | 20 | LF | $___________ | $___________ | |
| Planting and Seeding | ||||||
| 65701 | Harvesting and Relocating of Wetland Sod - Allison Ponds | 1,280 | SY | $___________ | $___________ | |
| 65701 | Harvesting and Relocating of Wetland Sod - Ericson Ponds | 1,540 | SY | $___________ | $___________ | |
| 62701 | Harvesting and Relocating of Alders - Allison Ponds | 1,550 | SY | $___________ | $___________ | |
| 62701 | Harvesting and Relocating of Alders - Ericson Ponds | 22 | SY | $___________ | $___________ | |
| 62501 | Apply Fertilizer and Seed Mixes - Allison Ponds | 2.7 | Acre | $___________ | $___________ | Does not include watering or compacting the seedbed |
| 62501 | Apply Fertilizer and Seed Mixes - Ericson Ponds | 2.7 | Acre | $___________ | $___________ | Does not include watering or compacting the seedbed |
| 62601 | Nursery Stock Trees and Planting | 1 | LS | $___________ | $___________ | |
| 63531 | Temporary Wildlife Fencing for Planted Areas | 300 | LF | $___________ | $___________ | |
| 62801 | Noxious Weed Containment and Eradication | 1 | LS | $___________ | $___________ | |
| Stream Restoration | ||||||
| 63101 | Construct BDAs | 13 | EA | $___________ | $___________ | |
| 63101 | Construct PALS | 94 | EA | $___________ | $___________ | |
| 63101 | Construct Live Tent Shade Structures | 3 | EA | $___________ | $___________ | |
| Total | $___________ |