This document is a Schedule of Items for a federal contract opportunity to decommission the Allison and Ericson dam complexes and restore the drainage to a native wetland habitat. The contract is broken into a Base option to decommission the two primary dams and restore the immediate areas, as well as an Option to decommission the remaining dams/impoundments and restore the associated areas. The Schedule of Items lists the various line items and estimated quantities for the work, including mobilization, clearing and grubbing, earthwork, road construction, planting and seeding, and stream restoration. The contract opportunity is solicitation number 1240LU24R0020 issued by the Department of Agriculture Forest Service for the Nez Perce Clearwater National Forest. The location of the work is approximately 15 miles west of Elk City, Idaho.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

Schedule of Items: Allison Ponds 2-4 & Ericson Ponds 2-7 - Option - Deconstruction and Restoration
Item No.DescriptionQuantityUnitUnit PriceCostAssumptions and Comments
Initial Construction
15101Mobilization and Demobilization1LS$___________$___________
15201Construction Staking and Survey1LS$___________$___________
63001Control of Water1LS$___________$___________
10508Handling of Hazardous Materials1LS$___________$___________
20101Clearing and Grubbing of Allison Ponds 2-42,100SY$___________$___________Areas with Trees and Brush Only
20101Clearing and Grubbing of Ericson Ponds 2-75,000SY$___________$___________Areas with Trees and Brush Only
Reclamation Earthwork
20422, 62406Allison Ponds 2-4 Topsoil Stripping, Stockpiling, and Replacement4,000SY$___________$___________Top soil to be stripped for all distubance areas and replaced to speed up reclamation.
20422, 62406Ericson Ponds 2-7 Topsoil Stripping, Stockpiling, and Replacement15,100SY$___________$___________
20403Embankment Removal Excavation - Allison Ponds 2-4827CY$___________$___________
20403Embankment Removal Excavation - Ericson Ponds 2-72,521CY$___________$___________
64805Place Embankment Material from Allison Ponds 2-4 into Repositories893CY$___________$___________Assume capping of soils is incidental to this item. A swell of 8% has been applied.
64805Place Embankment Material from Ericson Ponds 2-7 into Repositories2,723CY$___________$___________Assume capping of soils is incidental to this item. A swell of 8% has been applied.
30107Select Soil Borrow for Allison Ponds 2-4 Restoration150CY$___________$___________Additonal soil needed for creating berms or channels.
30107Select Soil Borrow for Ericson Ponds 2-7 Restoration300CY$___________$___________Additonal soil needed for creating berms or channels.
30106Microtopography Grading - Allison Ponds 2-41,695SY$___________$___________Rough and Loose in areas upstream of embankments and not under water
30106Microtopography Grading - Ericson Ponds 2-71,670SY$___________$___________Rough and Loose in areas upstream of embankments and not under water
25201Allison Ponds 2-4 Channel Grading50CY$___________$___________
25201Ericson Ponds 2-7 Channel Grading330CY$___________$___________
Road Access Construction
30301New Temporary Road Construction - Allison Ponds 2-40.3MI$___________$___________
30301New Temporary Road Construction - Ericson Pond 2-70.2MI$___________$___________
30301New Temporary Road Construction on Existing Template - Allison Pond 2-40MI$___________$___________
30301New Temporary Road Construction on Existing Template - Ericson Pond 2-70.2MI$___________$___________
30301Improvements to Existing Roads - Allison Ponds 2-40MI$___________$___________
30301Improvements to Existing Roads - Ericson Ponds 2-71.4MI$___________$___________
21103Road Obliteration - Allison Ponds0.3MI$___________$___________
21103Road Obliteration - Ericson Ponds0.4MI$___________$___________
1570624" Culvert20LF$___________$___________
Planting and Seeding
65701Harvesting and Relocating of Wetland Sod - Allison Ponds1,280SY$___________$___________
65701Harvesting and Relocating of Wetland Sod - Ericson Ponds1,540SY$___________$___________
62701Harvesting and Relocating of Alders - Allison Ponds1,550SY$___________$___________
62701Harvesting and Relocating of Alders - Ericson Ponds22SY$___________$___________
62501Apply Fertilizer and Seed Mixes - Allison Ponds2.7Acre$___________$___________Does not include watering or compacting the seedbed
62501Apply Fertilizer and Seed Mixes - Ericson Ponds2.7Acre$___________$___________Does not include watering or compacting the seedbed
62601Nursery Stock Trees and Planting1LS$___________$___________
63531Temporary Wildlife Fencing for Planted Areas300LF$___________$___________
62801Noxious Weed Containment and Eradication1LS$___________$___________
Stream Restoration
63101Construct BDAs13EA$___________$___________
63101Construct PALS94EA$___________$___________
63101Construct Live Tent Shade Structures3EA$___________$___________
Total$___________