a) Schedule of Items Allison Erickson Base.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Nez Perce Clearwater National Forest/Allison-Ericson Dams Decommission & Restoration
Solicitation number
1240LU24R0020
Issued by

About this file

This document is a Schedule of Items for the Nez Perce Clearwater National Forest/Allison-Ericson Dams Decommission & Restoration federal contract opportunity.

The project involves decommissioning the Allison and Ericson dam complexes and restoring the area to a native wetland habitat. The contract is divided into a Base option and an Option, with the Base option covering decommissioning of the two primary dams (Allison 1 and Ericson 1) and restoration in the immediate areas. The Option covers decommissioning the remaining dams/impoundments and restoring the associated areas.

The Schedule of Items lists the various construction, earthwork, planting, seeding, and stream restoration activities required, with units and estimated quantities. Pricing is to be provided by the contractor for each item. The federal agency involved is the Department of Agriculture Forest Service.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

Schedule of Items: Allison Pond 1 & Ericson Pond 1 - Base - Deconstruction and Restoration
Item No.DescriptionQuantityUnitUnit PriceCostAssumptions and Comments
Initial Construction-
15101Mobilization and Demobilization1LS$___________$___________
15201Construction Staking and Survey1LS$___________$___________
63001Control of Water1LS$___________$___________
10508Handling of Hazardous Materials1LS$___________$___________
20101Clearing and Grubbing of Allison Pond 11,150SY$___________$___________Areas with Trees and Brush Only
20101Clearing and Grubbing of Ericson Pond 12,000SY$___________$___________Areas with Trees and Brush Only
Reclamation Earthwork
20422, 62406Allison Pond 1 Topsoil Stripping, Stockpiling, and Replacement1,550SY$___________$___________Top soil to be stripped for all distubance areas and replaced to speed up reclamation.
20422, 62406Ericson Pond 1 Topsoil Stripping, Stockpiling, and Replacement4,600SY$___________$___________
20403Embankment Removal Excavation at Allison Pond 1177CY$___________$___________
20403Embankment Removal Excavation at Ericson Pond 11,208CY$___________$___________
64805Place Embankment Material from Allison Pond 1 into Repository191CY$___________$___________Assume capping of soils is incidental to this item. A swell of 8% has been applied.
64805Place Embankment Material from Ericson Pond 1 into Repository1,305CY$___________$___________Assume capping of soils is incidental to this item. A swell of 8% has been applied.
30107Select Soil Borrow for Allison Pond 1 Restoration50CY$___________$___________Additonal soil needed for creating berms or channels.
30107Select Soil Borrow for Ericson Pond 1 Restoration50CY$___________$___________Additonal soil needed for creating berms or channels.
30106Microtopography Grading - Allison Pond 12,325SY$___________$___________Rough and Loose in areas upstream of embankments and not under water
30106Microtopography Grading - Ericson Pond 13,455SY$___________$___________Rough and Loose in areas upstream of embankments and not under water
25201Allison Pond 1 Rock Grade Control9CY$___________$___________
25201Ericson Pond 1 Rock Grade Control9CY$___________$___________
30805Allison 1 Rock Grade Control Bedding Stone3CY$___________$___________
30805Ericson 1 Rock Grade Control Bedding Stone3CY$___________$___________
Road Access Construction
30301New Temporary Road Construction - Allison Pond 10.2MI$___________$___________
30301New Temporary Road Construction - Ericson Pond 10.2MI$___________$___________
30301New Temporary Road Construction on Existing Template - Allison Pond 10MI$___________$___________
30301New Temporary Road Construction on Existing Template - Ericson Pond 10MI$___________$___________
30301Improvements to Existing Roads - Allison Pond 10.5MI$___________$___________
30301Improvements to Existing Roads - Ericson Pond 10MI$___________$___________
21103Road Obliteration - Allison Pond 10.2MI$___________$___________
21103Road Obliteration - Ericson Pond 10.2MI$___________$___________
1570624" Culvert20LF$___________$___________
Planting and Seeding
65701Harvesting and Relocating of Wetland Sod - Allison Pond 12,110SY$___________$___________
65701Harvesting and Relocating of Wetland Sod - Ericson Pond 1630SY$___________$___________
62701Harvesting and Relocating of Alders - Allison Pond 1210SY$___________$___________
62701Harvesting and Relocating of Alders - Ericson Pond 123SY$___________$___________
62501Apply Fertilizer and Seed Mixes - Allison Pond 11.6Acre$___________$___________Does not include watering or compacting the seedbed
62501Apply Fertilizer and Seed Mixes - Ericson Pond 11.5Acre$___________$___________Does not include watering or compacting the seedbed
62601Nursery Stock Trees and Planting1LS$___________$___________
63531Temporary Wildlife Fencing for Planted Areas300LF$___________$___________
62801Noxious Weed Containment and Eradication1LS$___________$___________
Stream Restoration
63101Construct BDAs12EA$___________$___________
63101Construct PALS35EA$___________$___________
63101Construct Live Tent Shade Structures6EA$___________$___________
BaseTotal$___________