About this file

This document is a draft contract between Brookhaven Science Associates, LLC (BSA) and an unnamed contractor for custom training courses for the Data Science & Systems Integration (DSSI) Program at Brookhaven National Laboratory. The contract covers virtual training and project development courses across six different training levels (100-400), including individual training, core skills training, skills survey training, motion study training, advanced skills training, and project-based/enrichment training. The contract includes a base year and four additional option years, with all training to be completed by August 14, 2026, and potentially extending to August 14, 2030 if all option years are exercised.

The training program requires developing and delivering customized curriculum focused on Python programming, software development tools, system administration, APIs, web technologies, and specific scientific software like Bluesky, Ophyd, and Tiled. The contractor will provide various training formats including small-group interactive classes, one-on-one study sessions, a weeklong onsite professional development event, and ongoing staff professional development. The contract also includes monthly feedback to DSSI management, dedicated scheduling support, and on-demand access to over 100 hours of supplementary training materials. The specific pricing details are marked as "TBD" in the document, with payment to be made upon receipt and approval of properly certified invoices.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev. 5.2 Feb 2018 1

BSA’s Contractual Representative

Overall Value Amount

Contract Type Contract Number

Yanice Kirkendall TBD Firm-fixed Price 462869

BROOKHAVEN NATIONAL LABORATORY

BROOKHAVEN SCIENCE ASSOCIATES, LLC

P. O. Box 5000

UPTON, L.I., N.Y. 11973-5000

Vendor name & Address

CONTRACT

This Contract (the “Contract”) is between the party named above (the “Contractor”), and Brookhaven Science Associates, LLC (“BSA”), the latter acting under a Prime Contract DE-SC0012704 with the United States of America (the “Government”) represented by the United States Department of Energy (“DOE”):

I. Scope of Work: The Contractor shall assist BSA by providing training and project development per the statement of work noted in Attachment A.

All work shall be conducted in accordance with the attached BSA Statement of Work entitled “Custom Training Courses for the Data Science & Systems Integration Program”.

II. Period of Performance: This Contract shall be effective as of the date executed by BSA provided that the Contractor executes the Contract without exception or alteration. Timing of sessions will be coordinated with the BSA Technical Representative. All work shall be completed no later than 08/14/2026.

There are four additional option years that are exercisable in one (1) year increments at the unilateral discretion of BSA. The options, if exercised, will be executed by written Modification at unit pricing agreed to at time of award. If all option years are exercised, the period of performance will end 08/14/2030.

III. FIRM FIXED PRICE AND PAYMENT

A. Firm Fixed Price: In full consideration of the Contractor's performance hereunder BSA shall pay the Contractor the firm fixed price XX US Dollars ($XX). The said sum shall constitute full compensation for all services and materials furnished hereunder.

B. Payment: Payment will be made upon receipt and approval of properly certified invoices.

Rev. 5.2 Feb 2018 2

Item Milestone Amount Cumulative Amount

Receipt and acceptance by BSA of custom leveled training course.

onsite weeklong professional development.

ongoing staff professional

Option Year 1

Receipt and acceptance by BSA of

Receipt and acceptance by BSA of

Option Year 2

Receipt and acceptance by BSA of

Receipt and acceptance by BSA of

Option Year 3

Receipt and acceptance by BSA of

Receipt and acceptance by BSA of

Rev. 5.2 Feb 2018 3

Item Milestone Amount Cumulative Amount

Option Year 4

Option Year 4

Receipt and acceptance by BSA of

Option Year 4

Receipt and acceptance by BSA of

Total:

Payment terms are TBD.

Invoices shall be directed to BSA’s Accounts Payable Section via electronic or regular mail.

Electronic invoice submittal is preferred by BSA. The Contractor shall make every effort to have systems in place that allow for electronic invoice transmittal. Invoices shall be submitted in PDF format, via e-mail, to apinvoices@bnl.gov.

The Contractor shall indicate the final invoice by clearly marking such invoice as "FINAL". A copy of the final invoice must be submitted to BSA’s Contractual Representative.

IV. Authorized Representatives:

A. BSA’s Technical Representative: Dan Allan is BSA’s Technical Representative, hereunder. He shall act as liaison between BSA and the Contractor in technical matters only.

He can be reached at 631.344.3281 (phone), dallan@bnl.gov (e-mail).

B. BSA’s Contractual Representative: Yanice Kirkendall, telephone no. 631-344-2241, ykirkenda@bnl.gov (e-mail), is BSA's Contractual Representative. Any change or modification in the terms and conditions of this contract shall require the written approval of BSA's Procurement and Property Management Division’s Manager, or his designee.

C. Contractor’s Representative: xx is the Contractor’s authorized representative, hereunder.

He shall act as point of contact between BSA and the Contractor in all matters.

V. Additional Terms:

The provisions of Brookhaven Science Associates, LLC General Terms and Conditions for Commercial Items and Services, (Rev. 23.0, May 2025) are incorporated herein and made a part hereof.

mailto:dallan@bnl.gov mailto:ykirkenda@bnl.gov

Rev. 5.2 Feb 2018 4

The provisions of Brookhaven Science Associates, LLC Supplemental Terms and Conditions for Work by Contractors on Site at Brookhaven National Laboratory (Rev. 23.0, May 2025) are incorporated herein and made a part hereof.

This Contract is issued pursuant to Brookhaven Science Associates General and/or Supplemental terms and conditions listed above which are incorporated herein by reference. The complete text of these terms and conditions can be viewed via the internet at: http://www.bnl.gov/ppm/terms-and-conditions.php. Should the Contractor have any questions and/or not have access to these terms and conditions, contact the buyer or contracts specialist immediately.

The following documents attached hereto and made a part hereof, contain additional provisions of this contract:

- Attachment A - Statement of Work

- Attachment B - BNL-QA-101

This Contract does not bind nor purport to bind the Government of the United States.

ACCEPTED:

VENDOR BROOKHAVEN SCIENCE ASSOCIATES, LLC.

By: By:

Title: Title: Contracts Specialist

Date: Date:

Two copies of this Contract, executed by Brookhaven have been provided. Should you accept this Contract without exception or alteration, one copy of the Contract executed by both parties shall be returned to Brookhaven's Contractual Representative. Should you take any exceptions or attempt to alter the Contract in any manner, Brookhaven's execution thereof shall be null and void. Should you wish to take exception(s)/alteration(s), you shall notify Brookhaven's Contractual Representative. Brookhaven will consider the requested exception(s)/alteration(s) and notify you accordingly. No Contract shall exist unless and until such differences are resolved.

http://www.bnl.gov/ppm/terms-and-conditions.php http://www.bnl.gov/ppm/terms-and-conditions.php

Brookhaven Science Associates, LLC

Statement of Work for

Custom Training Courses for the Data Science & Systems Integration Program

Overview

Brookhaven Science Associates, LLC (BSA) requires a Contractor to develop and deliver virtual training courses in support of the Data Science & Systems Integration Program (DSSI) for Brookhaven National Laboratory, Upton, New York (BNL). This training program must include small-group interactive classes, one-on-one study sessions, a weeklong onsite professional development event, and could include additional training formats as detailed below.

The curricula, format, schedule, and attendance will be developed and determined in close collaboration with DSSI Group Leads. The program includes regular reporting to Group Leads, plus the possibility of adjusting the curricula midstream given new organizational focuses, etc.

Course content will cover library and framework development in the Python programming language, collaborative software development tooling and communication practices, effective use of basic system administration and command-line tools for Linux, Application Programming Interfaces (APIs), web technologies including REST, and JSON, and the data acquisition software Bluesky and Ophyd and data access software Tiled. The intended result of this training is improved technical expertise among the training course participants. No formal certification is required.

Scope of Work / Deliverables

The Contractor will furnish all personnel, labor, equipment, software, supplies, and materials to deliver to following:

1. Training Courses

Virtual training and project development courses, as exemplified in the table below.

Course Level

Description Attendees

Per Course

Attendee:

Instructor ratio

(Minimum) Hours Per

Course

Number of

Courses

100 Individual training 2 2:1 5 25

200 Core Skills training 12 10:1 15 5

210 Skills Survey training 25 25:2 15 2

220 Motion Study training 5 1:1 6 1

300 Advanced Skills training 10 10:1 15 4

400 Project-based/Enrichment training 8 10:1 15 3

Instructional hours will be distributed across session types including goal setting; interactive discussion;

hands-on project work; lecture with Q&A; moderated study halls; independent and group project work;

one-on-one coaching; project review, feedback, and enhancements. A detailed course schedule will be approved in writing, in advance by the authorized BSA Technical Representative.

Attendees for the courses and custom enrichment training will be selected by the Group Leads in the National Synchrotron Light Source II (NSLS-II) Data Science and Systems Integration (DSSI) Program, in coordination with the authorized BSA Technical Representative for this effort.

The Contractor will adapt course content to meet course participant level and job role, as assessed throughout the training period which shall be approved in writing, in advance by the authorized BSA Technical Representative.

The Contractor will provide the following at the request of the BSA Technical Representative:

• Curriculum completely customized around DSSI software packages; the topics and timing of delivery will be deeply integrated into DSSI project planning, to Group Lead requirements specifications, in coordination with the authorized BSA Technical Representative for this effort

• Hands-on sessions with examples derived from actual work-samples (developed in collaboration with key stakeholders)

• Individualized learning plans based on assessed attendee requirements

• Makeup sessions as needed

• Ad-hoc review or study hall sessions upon request

• Asynchronous coaching of individual attendees upon Group Leader recommendation

• On-Demand access to over 100 hours’ worth of proprietary, supplementary training materials

• Dedicated facilitator for attendee scheduling, logistical support, and program administration

The Contractor will provide monthly feedback to DSSI management including the authorized BSA Technical Representative regarding progress in training sessions. This feedback will be provided through virtual meetings, scheduled at times approved by the authorized BSA Technical Representative.

2. Onsite Workshop

On-site, Division-wide Professional Development Program 3 days of in-person workshops, lectures and instruction open to all members of DSSI Sessions planned and delivered in close collaboration with Group Leads, focusing on topics of immediate use regardless of attendee role Examples of past topics delivered at this session include: Code Review, Command-Line Tooling, Setup/Configuration Workshops, Presentation Skills, and addresses from DSSI leadership.

Schedule

All training specified under this Statement of Work is to be completed one year from the start of the contract.

BROOKHAVEN NATIONAL LABORATORY

SUPPLIER QUALITY ASSURANCE REQUIREMENTS

(BNL-QA-101)

5.2/2d01e011.docx Page 1 of 6 (04/2025)

PO/Contract No.: __________462869_____________________

1.0 PURPOSE & SCOPE

1.1 This document establishes quality assurance requirements to which Suppliers to Brookhaven Science Associates (BSA) must conform when specified in the procurement documentation.

1.2 This document contains two main sections. Section 3.0 covers the general requirements that are applicable to all Suppliers.

Section 4.0 contains special quality requirements that are applicable only when specifically invoked in the procurement documentation.

2.0 DEFINITIONS

2.1 The term Procurement documentation means the purchase order

(PO), contract, subcontract, Request for Proposal (RFP), Request for Quotation (RFQ) or other written agreement with the Supplier (seller) in which the requirements of BSA are incorporated.

2.2 The term Buyer means BSA operating Brookhaven National

Laboratory, acting by and through its Procurement & Property Management Division (PPM) issuing the PO/contract.

2.3 The term Supplier (seller) means the legal entity, which is the contracting party, with the Buyer with respect to the procurement documentation.

2.4 The term article or item means a product and/or a service.

3.0 GENERAL REQUIREMENTS

Unless otherwise specified in the procurement documentation, the following General Requirements apply:

3.1 Supplier’s Quality System and Quality Requirements

The Supplier must have and maintain an effective quality system that will, as a minimum, comply with all of the requirements as designated by the following:

3.1.1 A quality system certified/registered to the ISO

9001 standard: (latest revision as of the date of issuing the procurement documentation).

3.1.2 A quality system that meets the requirements of the

ISO 9001 standard: “Quality Management Systems – Requirements” (latest revision as of the date of issuing the procurement documentation).

3.1.3 Conformance to Supplier’s/Manufacturer’s quality

program or system.

3.1.4 Other: Refer to procurement documentation, (e.g. PO, Statement of Work [SOW], specifications, drawings) for quality requirements.

NOTE: Clauses 3.2 through 3.22 apply to all POs and will be included collectively in other procurement documentation when required/specified.

3.2 Assessment by Buyer

The Supplier’s quality system is subject to assessments by the Buyer’s Representative(s) for conformance with the requirements of the PO. Supplier or Distributor must allow BSA representatives, BSA customers, and regulatory agencies right of entry into the Supplier’s facilities to determine and verify product, processes, records, personnel, material, procedures, and systems.

3.3 Change Approval

No change(s) are permitted to be made to any Buyer requirements, (e.g. part number, model number, etc.) without the prior written approval of the Buyer.

3.4 Responsibility for Subcontractors

It is the responsibility of the Supplier to impose applicable requirements from this document upon their subcontractors.

Additionally, the Buyer reserves the right to disapprove, in writing, any subcontractor. For nuclear facility requirements per NQA-1, the Supplier must incorporate NQA-1 requirements in sub-tier procurement documents.

3.5 Responsibility for Conformance

The Supplier is responsible to provide items that conform to the requirements of the PO regardless of any assessments, surveillances, inspections and/or tests by the Buyer or its representatives at either the Supplier’ or Buyer’s facility. The Buyer reserves the right to request failure analysis and corrective action for non-conforming articles or items submitted or supplied to the Buyer. The Supplier is responsible for notifying the Buyer of any recalls or alerts associated with this

PO.

When NQA-1 requirements are imposed, prior to shipment, the Supplier must report any nonconformance that cannot be corrected to full conformance and obtain approval from BNL for possible Use-As-Is or Repair dispositions. Additionally, for commercial grade services, a service performance record must be provided that documents the adequacy of the service performed to the identified critical characteristics documented in the PO/contract.

3.6 Protection of Material and Equipment

The Supplier must employ procedures that assure adequate protection of material and equipment during shipment and while in storage. Such protection must include special environmental packaging, as necessary. All items shipped (originally packaged or repackaged) to BNL or other locations cited in the PO or contract, must comply with the requirements for preservation, packaging and marking as stated in the latest revision of ASTM Standard D 3951 Standard Practice for Commercial Packaging.

3.7 Measuring and Test Equipment (M&TE) Calibration

The Supplier must calibrate any M&TE used in the fulfillment of the PO requirements against certified standards that are traceable to the National Institute of Standards and Technology (NIST), or some other recognized national or international standard, or physical constant. The Supplier must notify the Buyer of any condition found during the calibration, servicing or repair of measuring and test equipment that can affect the end item requirements.

3.8 Suspect Counterfeit Parts

SUPPLIER QUALITY ASSURANCE REQUIREMENTS BNL-QA-101

5.2/2d01e011.docx Page 2 of 6 (04/2025)

The Supplier shall verify the procurement source and associated documentation certifying authenticity.

Appropriate incoming inspection and / or test methods shall be used to detect potential suspect counterfeit items.

The Supplier shall flow this requirement down to all sub-tier suppliers to prevent the inadvertent use of suspect counterfeit items.

Distributors shall not modify, rework or repair any items shipped on this order.

For reference only, a list of authorized/franchised distributors for electronic components can be found at:

https://www.trustedparts.com/

* For more information refer to the following Department of Energy website: https://www.energy.gov/ehss/corporate-reporting-analysis/databases/suspectcounterfeit-and-defective-items

3.9 Electrostatic Discharge Control

Items that are susceptible/sensitive to electrostatic discharge (ESDS) must be handled and packaged to protect them from damage. Items and/or packages must be labeled to indicate the susceptibility to electrostatic discharge.

3.10 Electrical or Fire Protection Equipment, Material, and

Systems All electrical or fire protection equipment, material, and systems delivered to BNL must be certified, listed, or labeled by a Nationally Recognized Testing Laboratory (NRTL). The CE mark is NOT a recognized NRTL certification mark. (For a listing of OSHA-recognized NRTLs, refer to http://www.osha.gov/)

For electrical or fire protection equipment, material, and systems which no NRTL accepts, certifies, lists, labels, or otherwise determined to be safe, the Supplier must determine the equipment to be safe for its intended use. The determination must be made on the basis of test data. The determination and test data documents must be made available to BSA prior to or upon delivery for review and acceptance by the applicable BSA Authority Having Jurisdiction

(AHJ).

In accordance with 29 CFR 1910.147(c)(2)(iii) whenever new machines or equipment are provided with energy isolating devices, those devices must be designed to accept a lockout device.

3.11 Hoisting & Rigging Equipment

All hoisting & rigging equipment used at BNL must meet the requirements of the latest applicable OSHA Regulations and ASME B30 Series standards for design, construction, markings, and proof load testing.

When proof load testing is required by the standards, a certificate must be provided upon delivery documenting the proof test.

3.12 Deleted – requirements were added to each Purchase Order as the “Advance Notification of Delivery.”

3.13 Powered Machine Shop Equipment

All powered machine shop equipment (e.g., lathe) delivered to BNL must meet the requirements of the latest applicable OSHA 1910 Regulations (e.g., part subpart O). Equipment purchased must include an integrated NFPA 79 compliant emergency stop and an anti-restart device.

3.14 Vehicle-Mounted Elevating and Rotating Aerial Devices

All vehicle-mounted and rotating aerial devices equipment used at BNL must meet the requirements of ANSI A92.2.

3.15 Self-propelled Elevating Work Platform Equipment

All self-propelled elevating work platform equipment (e.g., scissor lift) used at BNL must meet the requirements of ANSI A92.6.

3.16 Manually Propelled Elevating Aerial Platform Equipment

All manually propelled elevating aerial platform equipment used at BNL must meet the requirements of ANSI 92.3.

3.17 Boom Supported Elevating Work Platform Equipment

All boom supported elevating work platform equipment used at BNL must meet the requirements of ANSI 92.5.

3.18 Powered Industrial Trucks and Attachments

Powered industrial trucks (e.g. forklifts, hi-lows) must meet the requirements of the ANSI/ITSDF B56 series for design, construction, markings, and test loading. Industrial truck attachments must be approved by the truck manufacturer and supplied with an attachment data plate indicating the new truck capacities.

3.19 Used Industrial Equipment

For used industrial equipment (e.g. scissor lifts, forklifts, etc.), a Certificate of Conformance as defined in clause 4.16 must be provided as objective evidence and must additionally state that all maintenance and manufacturing alerts have been screened and all required repairs and improvements have been completed. The Supplier must provide records of the last year of maintenance.

3.20 Global Harmonized System Compliance

The supplier of chemicals must deliver the chemical in full compliance with the Department of Labor, Occupational Safety & Health Administration (OSHA)’s Globally Harmonized System (GHS) Hazard Communication Standard (29CFR1910.1200), available at:

https://www.osha.gov/dsg/hazcom/HCSFinalRegTxt.html

All hazardous chemicals delivered to BNL must be accompanied by an GHS Safety Data Sheets (SDS) with the format and content specified in 29CFR1910.1200. For information on the GHS SDS see OSHA Brief- Hazard Communication Standard: Safety Data Sheets Publication 3514 available at:

https://www.osha.gov/Publications/OSHA3514.pdf

All hazardous chemicals delivered to BNL after 12/01/2015 must have a label with the elements specified in 29CFR1910.1200 [product identifier; pictograms; signal words; hazard statement(s);

precautionary statement(s); and manufacturer, importer, or distributor’s name, address, and telephone number]. For information on the GHS label, see OSHA Brief- Hazard Communication Standard: Labels and Pictograms Publication 3636 available at:

https://www.osha.gov/Publications/OSHA3636.pdf

3.21 Age/Shelf Life and Storage Control

The Supplier must have an effective storage and age control system for items where acceptability is limited by the age or manner of storage of the item. The system must include a method of identifying the expiration date on the containers in which material is delivered to the Buyer. Special handling conditions must be recorded on certifications and shipping documents covering the material delivered to the Buyer. At the time of receipt, the material must not have less than three-quarters of its shelf life remaining, without prior written approval from the Buyer for each shipment.

3.22 Product Recalls/Product Bulletins/Safety Alerts

Any and all product recall alerts, product bulletins, or safety alerts must be communicated by email directly to ProductRecallAlert@BNL.gov. Provide the Purchase Order https://www.energy.gov/ehss/corporate-reporting-analysis/databases/suspectcounterfeit-and-defective-items https://www.energy.gov/ehss/corporate-reporting-analysis/databases/suspectcounterfeit-and-defective-items http://www.osha.gov/ https://www.osha.gov/dsg/hazcom/HCSFinalRegTxt.html https://www.osha.gov/Publications/OSHA3514.pdf https://www.osha.gov/Publications/OSHA3636.pdf mailto:ProductRecallAlert@BNL.gov

5.2/2d01e011.docx Page 3 of 6 (04/2025)

Number(s) and names of purchasers with notification to assist BNL in locating and identifying the subject material.

4.0 SPECIAL REQUIREMENTS

The following Special Requirements are applicable only when specified in the procurement documentation or as indicated by check mark hereon. These Requirements can be modified as required.

INSTRUCTIONS: Since sub-clauses (e.g., 4.4.1) are tied to the main clause (e.g., 4.4), the requirements of the main clause will apply by default whenever any sub-clause is selected (regardless of whether the main clause was selected/checked).

4.1 Quality Assurance Program or Manual

The Supplier must submit a copy of their Quality Assurance Program or Manual with their proposal for review and evaluation.

Suppliers providing A1/A2 but without a quality system compliant with NQA-1, i.e., Commercial Grade Supplier, must follow applicable Commercial Grade Dedication Instructions as defined in the SOW.

OR

Supplier must utilize the QA Program audited and approved by BNL.

4.2 Configuration Control System

The Supplier must establish and maintain a system to assure that all end items (including spares) are of the proper configuration, and that all approved configuration changes are incorporated at the specified effectivity points. Records must be maintained to verify the configuration of each item.

4.3 Process Sheets, Travelers, etc.

The Supplier must maintain a system of process sheets, shop travelers, or equivalent means to define the sequence of manufacturing, inspection, installation and test activities to be performed. Flow sheets, or equivalent, must be provided for sign-off by designated inspection personnel at specified inspection and test points, including, as required, re-inspection and re-test points, to assure completion as well as proper sequencing of required operations.

4.4 Manufacturing/Inspection/Test Plan

Sixty (60) calendar days prior to performance of work, the Supplier must submit for the Buyer’s approval a Manufacturing/Inspection/ Test Plan for the item(s) to be produced. Once approved, changes/ revisions must be approved by the Buyer prior to implementation.

The Plan must satisfy one or more of the following as selected:

4.4.1 Identification of parts and subassemblies showing

integrated flow into end item(s).

4.4.2 Identification of critical manufacturing operations, as well as inspection and test checkpoints.

4.4.3 The Plan may be a single document, or may make use

of existing “travelers,” or other suitable planning and control documents.

4.5 “Witness” Points

The Buyer reserves the right to designate selected manufacturing, inspection, and/or test operations as “witness” points. The Supplier must provide the Buyer with five (5) working days’ notice in advance of reaching such witness points during the manufacturing and test cycle of each item. For nuclear facility applications (NQA-1), witness points are required when Source Inspection is invoked. (see Clause 4.14)

4.6 Test and Inspection Procedures

Test and inspection procedures required to demonstrate satisfactory completion of requirements must be prepared by the Supplier and submitted to the Buyer for approval sixty (60) calendar days prior to use of such procedures. Once approved, changes/revisions must be approved in writing by the Buyer prior to implementation.

4.7 Special Processes

Processes (e.g., welding, brazing, bonding, plating, chemical machining, chemical coating, chemical cleaning, precision cleaning, heat treating, or waste processing) that either cannot be verified non-destructively or require a unique (special) non-destructive test/inspection (e.g., radiographic inspection, ultrasonic testing, pressure leak testing) must be performed in accordance with detailed written procedures. These procedures must specifically describe the exact manner in which the processes are to be performed.

Additionally, the following requirements apply as selected:

4.7.1 Copies of special process procedures must be made

available on request for review by the Buyer’s representative.

4.7.2 At least sixty (60) calendar days prior to use on items deliverable to the Buyer, the Supplier must submit to the Buyer copies of all applicable process procedures for review and approval. Revisions or changes to Buyer-approved special process procedures must be submitted to the Buyer for review and approval prior to implementation.

4.7.3 Qualification of Procedures, Facilities, Equipment

and Personnel The Supplier must, prior to use, qualify the procedures/specifications, facilities, equipment and personnel that will be used for the performance of special processes. Only those personnel who have been qualified to perform a specific special process must be used to perform that process. Records of such qualification must be available to the Buyer’s representative upon request.

4.8 Qualification of Procedures, Facilities, Equipment

Superseded by Sub-clause 4.7.3

4.9 Qualification of Special Process Personnel

Superseded by Sub-clause 4.7.3

4.10 End-Item Documentation Package

The Supplier must provide a documentation package for each shipment of the item(s) supplied, which consists of objective evidence of compliance with PO requirements. This documentation package must be complete, legible, indexed, and traceable to the item supplied. Additionally, the following requirements apply as selected:

4.10.1 Copies of reports of all required or necessary

inspections, examinations and tests, properly validated by the Supplier’s authorized personnel.

4.10.2 A listing of the as-built configuration of

each delivered item; this may be defined by the use of drawing numbers and revisions, unique parts lists or other such means of positive identification.

4.10.3 Copies of nonconformance reports dispositioned as

“rework/repair” or “use-as-is”, and all BSA approved deviation/waivers.

5.2/2d01e011.docx Page 4 of 6 (04/2025)

4.10.4 Copies of material test certificates for specified

materials, showing physical and chemical properties.

4.10.5 – Superseded by Clause 4.16

4.11 Release for Shipment

The documentation package required in Clause 4.10 must be approved by the Buyer’s representative prior to release of the item for shipment.

4.12 Shipment of Documentation Package to Buyer

Three (3) copies of the documentation package required in Clause

4.10 must be shipped to the Buyer with or prior to each shipment of the purchased items.

4.13 Failure Reporting, Analysis and Corrective Action

The Supplier must maintain a failure reporting, analysis and corrective action system that must, at a minimum, evaluate, analyze and correct failures occurring during qualification, first article and end-item acceptance testing and inspection. The results of all failure evaluations and analyses must be documented and available for review by the Buyer.

4.14 Source Inspection/Verification

Items to be delivered require inspection, tests or surveillance by the Buyer’s representative at the Supplier’s facility. Five (5) working days advance notice, for acceptance inspections and tests, must be provided by the Supplier to the Buyer to permit scheduling of source inspection. For nuclear facility applications (NQA-1), source verification must be conducted in accordance with a Verification Plan to inspect, test, or examine at predetermined/Witness points (see Clause 4.5). Documented evidence of acceptance must be provided upon completion of all verifications.

4.15 Chemical and Physical Test Report

One copy of the actual chemical and physical test report(s) for each heat, batch or lot must accompany each shipment. Test reports must list the actual parameters tested, the acceptable limits for each parameter, and must contain the actual readings taken during test.

4.16 Certificate of Conformance (C of C)

With each shipment, per the procurement documentation, the Supplier must submit a Certificate of Conformance (C of C). In case of drop shipment, a copy of the certificate must be submitted to the Buyer at the time of shipment. The certificate must identify the purchased item/material/equipment by PO number and quantity, include the title of and be signed by an authorized representative of the company, and must constitute a representation by the Supplier that:

A. Materials used are those which have been specified by the Buyer, and that the items delivered were produced from materials for which the Supplier has on file, reports of chemical or physical analysis, or any other equivalent evidence of conformance of such items to applicable specifications;

B. Processes used in the fabrication of items delivered were in compliance with applicable specifications included as part of the PO/contract, or Buyer-approved procedures or specifications;

C. The items as delivered comply with all applicable drawings, specifications, deviations/waivers and other requirements of the procurement documentation; and-

D. When specified, cleaning and cleanliness requirements have been completely satisfied. The C of C must reference the Supplier’s applicable cleaning procedures.

4.16.1 Additional C of C Requirements for Nuclear

(NQA-1) Purchases

A. The certificate must be signed by the person responsible for the quality function and whose function and position is described by the supplier’s QA program/system.

B. The Supplier’s Certification system must be described in their QA Program/system documentation and include the process for completing the C of C along with the review and Approval of the C of C prior to delivery.

C. The Buyer reserves the right to verify the validity of Supplier’s certificates and the effectiveness of the Supplier’s certification system. This verification will be commensurate with the Supplier’s quality performance/history.

4.17 Report with Each Shipment

Superseded by Clause 4.10

4.18 First Article Acceptance

Buyer acceptance of first article(s) is required prior to the production run. The first article(s) must be identified as such, including the PO number/contract, part number, and part name. The Supplier is required to:

4.18.1 Submit the first article(s) to the Buyer’s

representative for test/inspection to be conducted at the Supplier’s facility by the Buyer’s representative.

4.18.2 Submit the first article(s) to the Buyer for test /

inspection by the Buyer at the Buyer’s facility.

4.18.3 Submit the first article(s) to the Buyer together

with documents showing data representing results of the Supplier’s first article(s) test/inspection, including the actual dimension or value for each specified characteristic.

4.18.4 After Buyer acceptance of first article(s), all of the remaining units required by the PO/contract must be produced by the Supplier and the Supplier’s suppliers using the same design, materials, processes, methods and tooling that were used to manufacture the approved first article(s). Any changes must have prior written approval from the Buyer.

4.19 Notification of Change to Design, Methods, or Processes

The Supplier must immediately notify the Buyer of any significant changes (those that may affect form, fit, function, reliability, safety, or interchangeability) in product design, fabrication methods, materials, or processing from those used by the Supplier at time of Supplier’s quotation or offer to the Buyer, which resulted in the PO.

4.20 Age/Shelf Life and Storage Control

Superseded by Clause 3.21

4.21 Serial Numbers

The Supplier must assign/mark a separate and distinct serial number to each end-item in accordance with the procurement documentation.

A record of the serial number, for each part number, must be maintained by the Supplier.

4.22 Lot or Batch Numbers

For items furnished in accordance with the procurement documentation, the manufacturing lot or batch number must be indicated on the packing list, certifications and other applicable documents. Where impractical to mark individual parts due to size or shape, the lot or batch number must be marked on identifying tags or the smallest unit package.

5.2/2d01e011.docx Page 5 of 6 (04/2025)

4.23 Material Traceability

Materials used must be identified by material type, applicable specification and revision number, and be traceable to their lot and/or heat number(s). Traceability records must be available for review by the Buyer’s representative.

4.24 Shipment Destination Other than BNL

The material ordered is to be shipped to other than the Buyer’s facilities. Copies of the data required in accordance with the procurement documentation must accompany the shipment; in addition, one copy of such data must be mailed to the Buyer on the same day that shipment is made.

4.25 Heat Treat Bars

Superseded by Clause 4.7

4.26 Burn-in

Burn-in must be performed on each completed item, per the procurement specification or Supplier’s Burn-In process approved by the Buyer. Records of burn-in testing, repairs and test results must be maintained and must be available to the Buyer’s representative upon request.

4.27 Welding Procedures

Superseded by Clause 4.7

4.28 Weld/Braze Inspection Report

A report(s) must be submitted that indicates the complete inspection of welds or brazes from the initial fit-up stage through final inspection. Inspection reports must be accompanied by all radiographic films, filler metal reports etc. The reports must contain the signature or stamp, and title of an authorized Supplier representative.

4.29 Radiographic Quality Requirements

Items requiring radiographic inspection must be radiographed and processed in accordance with the Supplier’s special process procedures that satisfy design specifications, standards or other procurement documentation requirements. Personnel reading and interpreting film must have been examined and certified.

Responsibility for this certification must rest with the Supplier, whether the Supplier does the work or subcontracts to a specialized laboratory. A report of the findings must include the name of the reader and the signature and title of a responsible representative. The radiographic film and a reproducible copy of the report must accompany each shipment. An adequate method of identifying and cross-referencing each film exposure, report, and item must be provided. When parts are serialized, serial numbers must appear on the report and the film.

4.30 Nondestructive Test Reports

All nondestructive testing must be conducted in compliance with the Supplier’s special process procedures that satisfy the applicable provisions of the design specifications, or other procurement documentation requirements. Personnel and equipment utilized in performance of such tests must be qualified for the type of test performed. The Supplier must furnish with, or prior to, each shipment reports of such nondestructive examination of material or items furnished. These reports must be identifiable to the respective item or material including the specific section, joints or views of the item furnished. These reports must contain the signature and title of an authorized Supplier representative. When items are serialized, the serial numbers must appear on the reports.

4.31 Pressure or Leak Test Reports

Test reports must be prepared for all pressure and leak tests. Such reports must state the requirement, the Supplier’s test procedure number, and the observed result for each item, joint or connection tested. When items are serialized, the serial numbers must appear on the report. Reports must contain the signature/title of an authorized Supplier representative and must accompany each shipment.

4.32 Cleaning Certification

Superseded by Clause 4.16 D

4.33 Calibration Certification

The Supplier must submit with each instrument/system a certification that the instrument/system has been calibrated and is ready for use.

The certification must contain, at a minimum, the identity of the instrument/system, identification of the calibration procedure used, identification of the standards and/or equipment utilized for the calibration, and a statement that the calibration of the standards and/or equipment used is traceable to the NIST or some other recognized national or international standard, or physical constant.

Unless otherwise specified, detailed support data must remain on file for minimum of three (3) years with the Supplier and must be available for review by the Buyer. The certification must also contain the signature and title of an authorized Supplier representative.

4.33.1 The Supplier will provide “As Found” (i.e., before)

and “As Left” (i.e., after) measurements with the certification.

4.33.2 Additional NQA-1 Calibration Certification

Requirements The Calibration Certificate must be signed by the person responsible for the quality function and whose function and position is described by the supplier’s QA program/system.

The Supplier’s Certification system must be described in their QA Program/system documentation and include the process for completing the Calibration Certificate along with the review and Approval of the Certificate prior to delivery.

The Buyer reserves the right to verify the validity of Supplier’s Certificates and the effectiveness of the Supplier’s certification system. This verification will be commensurate with the Supplier’s quality performance/history.

The Certificate must include the following:

• M&TE ID or Asset number

• The Supplier’s calibration procedure

• The recommended frequency of calibration

• The calibration date

• The next calibration due date

• As-found calibration data must be reported in the

Calibration Certificate when calibrated items are found to be out-of-tolerance.

• The standards used for calibration

• The PO number

• Any additional technical and quality requirements, as necessary.

On the Certificate, the supplier must also attest that the contracted calibration or test service has been performed in accordance with their ISO/IEC-17025 program, has been performed within their scope of accreditation, is traceable to NIST, the PO’s requirements are met, and identify all nonconforming conditions.

5.2/2d01e011.docx Page 6 of 6 (04/2025)

4.34 Operating-Maintenance Manual

Documentation containing operating procedures, maintenance instructions, spare parts lists, and handling procedures must be submitted with the shipment of the first item.

4.35 Computer Software Configuration Management

The Supplier must have and maintain an effective software configuration management system. The Supplier’s system must establish requirements for placing software under configuration control, provide for the positive identification of software, and the control of all software baseline changes.

4.35.1 The Supplier must submit a copy of their software

configuration management procedure(s) with their proposal for review and evaluation, and specifications for software features, including requirements for safety, security, functions, and performance.

4.35.2 Superseded by Sub-clause 4.35.1

4.36 Computer Software Verification and Validation (V&V)

The Supplier must develop written procedures describing the controls applied to the design of software and the validation of the design through independent technical review. The procedures must provide for documentation of review activities, including requirements for documenting comments and resolution of comments. Supplier software designs and review documentation must be subject to review and approval by the Buyer.

The Supplier must test and verify computer software developed or modified to fulfill the requirements in the procurement documentation. The verification testing must be accomplished by a comparison of test results with those from other verified software, or by a comparison with results from analytical solutions or Buyer-approved alternatives.

4.37 Computer Software Notification of defects, new releases

or other issues For Safety Software, the Supplier must provide a process to (a) notify users of defects, new releases, or other issues that impact the operation and (b) mechanisms for the users of the software to report defects and request assistance in operating software.

4.38 Computer Software User Training

The Supplier must provide formal on-site, off-site or on-line training for users.

4.39 Records

The Supplier must retain objective evidence, including records, of the inspections and tests performed in the course of manufacturing, testing, inspecting, preserving, packaging, and preparation for shipment of procured items. These records must be made available to the Buyer’s representative for review upon request. These records must be maintained for a minimum of three (3) years, unless otherwise specified in the procurement documentation, after the completion of the PO/contract.

4.40 Electrical, Fire Protection, or Scaffolding Equipment, Material, and Systems Superseded by Clause 3.10

4.41 Hoisting & Rigging Equipment

Superseded by Clause 3.11

4.41.1 Powered Industrial Truck Attachments

Superseded by Clause 3.18

4.41.2 Custom-made Equipment

Superseded by Clause 3.11

4.41.3 Critical Lifts

Superseded by Clause 3.11

4.42 Marking of Outer Package and Hoisting & Rigging Services Superseded by Clause 3.12

4.43 Franchised/Licensed “Distributor” Traceability

Products that are not purchased directly from the Original Equipment Manufacturer (OEM)/Original Component Manufacturer (OCM) must be purchased only from a franchised/licensed distributor of the product being offered. The distributor must provide documentation that the distributor is contractually authorized by the manufacturer as a franchised / licensed distributor along with the geographic region(s) covered by the authorization. The distributor must not use brokers (any company, person, or entity who is not an OEM/OCM or authorized by the OEM/OCM) for the purchase of items, unless pre-approval has been granted by Brookhaven Science Associates (BSA).

For reference only, a list of authorized/franchised distributors for electronic components can be found at:

https://www.trustedparts.com/

4.43.1 The distributor must ensure traceability of all products to the Original Equipment Manufacturer (OEM)/Original Component Manufacturer (OCM) by identifying the Original Equipment Manufacturer (OEM)/Original Component Manufacturer (OCM) for each lot and / or date code on the Certificate of Conformance. The distributor must provide a copy of the Manufacturer’s certificate for the lot number being supplied, along with their franchised distributor documentation.

4.44 Power Machine Shop Equipment

Superseded by Clause 3.13

4.45 Aerial Lifts Equipment

Superseded by Clause 3.14

4.46 Self-propelled Elevating Work Platform Equipment

Superseded by Clause 3.15

4.47 Nuclear (NQA-1) Calibration Services

The service must be provided in accordance with the supplier’s accredited ISO/IEC-17025 program and scope of accreditation. As-found calibration data must be reported in the certificate of calibration when calibrated items are found to be out-of-tolerance.

The equipment and standards used to perform the calibration must be identified in the certificate of calibration. Subcontracting of these accredited services is prohibited. BNL must be notified of any condition that adversely impacts the supplier’s ability to maintain the scope of accreditation. Performance of the services listed on this order is contingent on the Supplier’s accreditation having been achieved through an on-site accreditation assessment by the accreditation body within the past 48 months. Any additional technical and quality requirements, as necessary.

4.48 Nuclear (NQA-1) Right of Access

BNL or designated representative may enter the premises of Supplier (or its sub-tier supplier) and review records for the purpose of inspection, surveillance, or quality assurance audit.

4.49 Nuclear (NQA-1) Partial Orders

Supplier may not ship partial orders without prior written approval from BNL.

https://www.trustedparts.com/

BROOKHAVEN NATIONAL LABORATORY
BROOKHAVEN SCIENCE ASSOCIATES, LLC
P. O. Box 5000
UPTON, L.I., N.Y. 11973-5000
CONTRACT
This Contract does not bind nor purport to bind the Government of the United States.
Title: Title: Contracts Specialist
A.4 BNL-QA-101 462869.pdf
1.0 PURPOSE & SCOPE
2.0 DEFINITIONS
3.0 GENERAL REQUIREMENTS
3.1 Supplier’s Quality System and Quality Requirements
3.4 Responsibility for Subcontractors
It is the responsibility of the Supplier to impose applicable requirements from this document upon their subcontractors. Additionally, the Buyer reserves the right to disapprove, in writing, any subcontractor. For nuclear facility requirements per NQA...
3.5 Responsibility for Conformance
3.6 Protection of Material and Equipment
3.7 Measuring and Test Equipment (M&TE) Calibration
A.4 BNL-QA-101 462869.pdf
1.0 PURPOSE & SCOPE
2.0 DEFINITIONS
3.0 GENERAL REQUIREMENTS
3.1 Supplier’s Quality System and Quality Requirements
3.4 Responsibility for Subcontractors
It is the responsibility of the Supplier to impose applicable requirements from this document upon their subcontractors. Additionally, the Buyer reserves the right to disapprove, in writing, any subcontractor. For nuclear facility requirements per NQA...
3.5 Responsibility for Conformance
3.6 Protection of Material and Equipment
3.7 Measuring and Test Equipment (M&TE) Calibration

File details come from the government source that posted it. Updated .