B.08 RFP_Att 12 Past Performance Information Sheet_Rev 13 Feb 2023.docx

DOCX document 43 KB Posted

Attached to
Birzai Fire and Rescue Station Reno, Lithuania
Solicitation number
W912GB25R0035
Issued by

About this file

This document is a Past Performance Information Sheet for a federal contract opportunity (Solicitation W912GB25R0035) for the Bizai Fire and Rescue Station Renovation in Lithuania. The solicitation is a design-build project issued by the Department of the Army European Command, with an estimated construction magnitude between $500,000 and $1,000,000. The procurement is a full and open competition (unrestricted) using a best value trade-off acquisition method, with contract award to be made in US Dollars.

The attachment provides a template for contractors to document their past performance, requiring detailed information about previous project experience. Contractors must specify project details such as completion date, final cost, project type (design-build or design-bid-build), scope, facility purpose, construction size, work percentages, and whether the project was for the US Department of Defense. The form distinguishes between prime contractors, subcontractors, joint ventures, and key subcontractors, with specific instructions for how each should report their project experience. The NAICS code is 236220, with a size standard of $45,000,000, and businesses will be evaluated based on their size in the System for Award Management (SAM).

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 12 (amended 13 FEB2023) W912GB25R0035, Bizai Fire and Rescue Station Renovation, Lithuania

CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO. W912GB25R0035, Bizai Fire and Rescue Station Renovation, Lithuania, Page 1

Project Name, Contract number, and Location:

Past Performance:

1. The day, month, and year work was completed: _______________

2. Is this project more than 75% complete? ____ Yes ____ No If “No” explain current percentage of completion, if yes and between 75-99% complete please explain how the percentage was calculated and what work remains.

3. The final cost of this project €_________________________

4. Do not provide a listing of existing or previous contracts, but rather provide detailed information of work for this project:

o Design- Build or Design-Bid-Build o Scope of the project, to include purpose/use of facility.

o Size of the project, differentiate square footage of new construction versus renovation if project includes both.

o Type and percentage of work that was self-performed.

o Whether the project involved new construction, renovation, or both. Clearly delineate square meters for construction and renovation.

o Whether the project was completed for the United States DoD.

(Continue typing if required to provide more information)

ATTACHMENT 2 – CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO. W912GB25R0035, Bizai Fire and Rescue Station Renovation, Lithuania Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that performed at least 15% of the work, and managed all other work for the project.

Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror may take credit for the Key Subcontractor’s past performance if it was meaningful to this procurement. Ensure you the letter of commitment is signed by both the Offeror and the Key Subcontractor.

5. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.

c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:

File details come from the government source that posted it. Updated .