A.02 SOW_Att 3_Conceptual Floor Plans.pdf
PDF 1 MB Posted
- Attached to
- Birzai Fire and Rescue Station Reno, Lithuania
- Solicitation number
- W912GB25R0035
- Issued by
-
Department of the Army European Command
About this file
The document is a set of conceptual floor plans for the renovation of a Fire and Rescue Station in Birzai, Lithuania, containing detailed architectural drawings for four levels: basement, first floor, second floor, and attic. The plans outline specific renovation requirements for each floor, including:
Basement Plan: Requires new thermal insulation and waterproofing of exterior walls, and new exterior drainage around the building perimeter. First Floor Plan: Involves converting an existing room to a new communications (COM) room, blocking an existing door, demolishing existing stairs, and providing a new interior door and steps. The plan also calls for all new windows, exterior doors, vehicle overhead doors, and EIFS (Exterior Insulation and Finish System) for all exterior walls. Second Floor and Attic Plans: Specify providing all new windows, repairing existing balconies, installing new EIFS for exterior walls, and adding new roof and attic thermal insulation, with a note to maintain the existing annex bituminous roofing.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASEMENT PLAN – RENOVATION OF FIRE AND RESCUE STATION ‐ BIRZAI, LITHUANIA – RFP, SEC. 011010, SOW, ATT. 3
‐ PROVIDE NEW THERMAIL INSULATION
AND WATERPROOFING OF BASEMENT
EXTERIOR WALLS
‐ PROVIDE NEW EXTERIOR DRAINAGE
AROUND BUILDING PERIMETER
NOTES
17.52
7.00
5.90
6.72 4.90
FIRST FLOOR PLAN – RENOVATION OF FIRE AND RESCUE STATION ‐ BIRZAI, LITHUANIA – RFP, SEC. 011010, SOW, ATT. 3
CONVERT EXISTING
ROOM TO NEW
COM ROOM
BLOCK EXISTING DOOR
AND DEMO EXIST. STAIRS
PROVIDE NEW INT. DOOR,
DOOR OPENING, AND STEPS
LEGEND
‐ PROVIDE ALL NEW WINDOWS,
EXTERIOR DOORS, AND VEHICLE
OVERHEAD DOORS
‐ PROVIDE NEW EIFS FOR
ALL EXTERIOR WALLS
NOTES
MOVE EXIST. COM BOX
TO NEW COM ROOM
6.33
9.50
6.72 5.90 4.90
7.00 9.40
7.00
5.90
6.72 4.90
7. 15 6.75
MAIN BUILDING ANNEX
SECOND FLOOR PLAN – RENOVATION OF FIRE AND RESCUE STATION ‐ BIRZAI, LITHUANIA – RFP, SEC. 011010, SOW, ATT. 3
‐ PROVIDE ALL NEW WINDOWS AND
REPAIR EXIST. BALCONIES
‐ PROVIDE NEW EIFS FOR
ALL EXTERIOR WALLS
NOTES
6.72 5.90 4.90
7.00 9.40
7.00
5.90
6.72 4.90
BALC.
BALC.
ATTIC PLAN – RENOVATION OF FIRE AND RESCUE STATION ‐ BIRZAI, LITHUANIA – RFP, SEC. 011010, SOW, ATT. 3
‐ PROVIDE ALL NEW WINDOWS AND
REPAIR EXIST. BALCONIES
‐ PROVIDE NEW EIFS FOR
ALL EXTERIOR WALLS
NOTES
‐ PROVIDE NEW ROOF AND
ATTIC THERMAL INSULATION
‐ EXISTING ANNEX BITUMINOUS
ROOFING MUST REMAIN
6.00 7.00
1.003.40 3.60
7.00
File details come from the government source that posted it. Updated .