B.08_Proposal Schedule and Cost Breakdown F-18 Super Hornet Procurement C Package 4.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Super Hornet Procurement C Parking Apron and Aircraft Parking Shelters
Solicitation number
W912ER22R0004
Issued by

About this file

This document contains a solicitation for construction services for a new aircraft parking apron and shelters at Al Jaber Air Base in Kuwait. The U.S. Army Corps of Engineers Transatlantic Middle East District is seeking a single contractor through a firm-fixed-price construction contract to build a new aircraft parking apron and taxiways, two enclosed aircraft parking shelters containing a total of twelve parking spaces, related site improvements, and incidental work. The estimated value of the project is between $25 million and $100 million. The NAICS code for this procurement is 236220 for commercial and industrial building construction, with a small business size standard of $39.5 million. The period of performance is 649 calendar days from notice to proceed. The solicitation will be competed fully and openly, and award will be made based on best value using a tradeoff process to the offeror determined responsible in accordance with the FAR.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal Schedule

PROPOSAL SCHEDULE
RFP:W912ER22R0004P2#480570
PROJECT:F-18 Super Hornet, Procurement C, Package 4
LOCATION:Al Jaber Air Base, Kuwait
ITEM NO.DESCRIPTIONQTYUNITAMOUNTTOTAL
Base Items
Primary Facilities
0001Mobilization and Demobilization for the entire work of the contract.1JA$
0002Construct Aircraft Shelters Enclosed. This work is further identified as Facilities I and O in Package 4.2EA$$
0003Construct Aircraft Parking Apron. This work is further Identified as Facility H in Package 4.1JA$
0004Construct Associated Sitework and Utility Infrastucture to support Package 4 Facilities I, O, and H. This work includes, but is not limited to, site preperation, fire water, potable water, AFFF, drainage, technology connection, and electrical connection to the buildings.1JA$
TOTAL BASE (ITEMS 0001 - 0004)$
Option Item

0005 Option 1 - Provide Enhanced turnover Assistance for all work completed in this Contract as described in Specification Section 01 15 00.12, Paragraph 1.11. 1 JA $

TOTAL Option (ITEMS 0005) $

TOTAL BASE and Option (ITEMS 0001 - 0005) $

Cost Breakdown

ATTACHMENT B - COST BREAKDOWN SCHEDULE
RFP:W912ER22R0004CONTRACTOR:
PROJECT:F-18 Super Hornet, Procurement C, Package 4Al Jaber Air Base, KuwaitP2#480570
ITEMDESCRIPTIONLABOR COSTSEQUIPMENT COSTSMATERIAL COSTSSUBCONTRACTOR COSTSTOTAL DIRECT COSTHOME OFFICE OVERHEAD (HOOH)JOBSITE OFFICE OVERHEAD (JOOH)BONDTOTAL OVERHEAD/INDIRECT COSTPROFITTOTAL CONSTRUCTION COSTS

Base Items

0001 Mobilization and Demobilization for the entire work of the contract.

0002 Construct Aircraft Shelters Enclosed. This work is further identified as Facilities I and O in Package 4.

0003 Construct Aircraft Parking Apron. This work is further Identified as Facility H in Package 4.

0004 Construct Associated Sitework and Utility Infrastucture to support Package 4 Facilities I, O, and H. This work includes, but is not limited to, site preperation, fire water, potable water, AFFF, drainage, technology connection, and electrical connection to the buildings.

TOTAL BASE (ITEMS 0001 - 0004)

Options

0005 Option 1 - Provide Enhanced turnover Assistance for all work completed in this Contract as described in Specification Section 01 15 00.12, Paragraph 1.11.

TOTAL Option (ITEMS 0005)
TOTAL BASE and Option (ITEMS 0001 - 0005)