B.08.03.Amendment0002-20B0007.pdf.pdf
PDF 444 KB Posted
- Attached to
- Beachfill Nourishment - Brigantine Inlet to Great Egg Harbor Inlet, Absecon Island, Atlantic County, NJ.
- Solicitation number
- W912BU20B0007-0002
About this file
This amendment to a solicitation modifies the inside page, submittal register, and Section 01 35 26 of specifications for a beach nourishment project. The project involves placing beach fill between Brigantine Inlet and Great Egg Harbor Inlet on Absecon Island in Atlantic County, New Jersey. The amendment extends the request for information due date to July 3, 2020 and revises the specified sections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract-W912BU20B0007-Absecon.pdf | ||
| W912BU20B0007_DWGS-AM0004.pdf | ||
| W912BU20B0007_SPECS-AM0004.pdf | ||
| Absecon_Inlet_Grid_Jan2020_9column.txt | TXT text file | |
| Absecon Borrow H - AD SURVEY - 3MAY2018.txt | TXT text file | |
| Absecon Island NJ - Borrow Site H Metadata.gen.txt | TXT text file | |
| W912BU20B0007_DWGS-AM0003.pdf | ||
| W912BU20B0007_SPECS-AM0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0002 is hereby issued to extend the RFI due date to 03 July 2020 at 5:00pm EST.
***************************THIS DOES NOT EXTEND THE BID OPENING DATE******************************
Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0002. Failure to acknowledge all amendments may be cause for rejection of the bid.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU20B0007
X 9B. DATED (SEE ITEM 11)
15-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jun-2020
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL:TEL:
W912BU20B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
Amendment No. 0002
IFB W912BU20B0007
14. DESCRIPTION OF AMENDMENT (continued)
a. INSIDE PAGE: Please delete the inside page in its entirety, and substitute the revised inside page, annotated Amendment No. 0002, attached hereto.
b. TECHNICAL SPECIFICATIONS:
(1) Section 01 33 00 – SUBMITTAL PROCEDURES: Please delete pages 01 33 00-17 through 25, in their entirety, and substitute the revised pages 01 33 00-17 through 26, annotated Amendment No. 0002, attached hereto.
(2) Section 01 35 26 – GOVERNMENTAL SAFETY REQUIREMENTS: Please delete pages 01 35 26-16 through 32, in their entirety, and substitute the revised pages 01 35 26-16 through 32, annotated Amendment No. 0002, attached hereto.
c. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0002. Failure to acknowledge all amendments may be cause for rejection of the bid.
This page was intentionally left blank for duplex printing.
AMENDMENT NO. 0002
15 MAY 2020
INVITATION NO. W912BU20B0007
PHILADELPHIA DISTRICT
CORPS OF ENGINEERS
INVITATION FOR BIDS
FOR
BEACH NOURISHMENT
BRIGANTINE INLET TO GREAT EGG HARBOR INLET
ABSECON ISLAND
ATLANTIC COUNTY, NEW JERSEY
I. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL OPPORTUNITY CLAUSE
WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.
II. BIDDERS ARE REQUIRED TO COMPLETE THE REPRESENTATION AND CERTIFICATIONS
PORTION OF SECTION 00 45 00 OF THIS SOLICITATION AND SUBMIT THIS WITH THEIR
BID.
III. ALL QUESTIONS PERTAINING TO THIS PROCUREMENT MUST BE RECEIVED NO LATER
THAN 05:00 P.M., ON 3 JULY 2020. RESPONSES MAY NOT BE PROVIDED TO REQUEST FOR
INFORMATION (RFI'S) RECEIVED AFTER THIS CUTOFF DATE.
IV. THERE WILL NOT BE A GOVERNMENT CONDUCTED SITE VISIT FOR THIS PROJECT.
THE PROSPECTIVE BIDDERS ARE ENCOURAGED TO VISIT THE SITE OF THE WORK AT THEIR
CONVENIENCE IN ORDER TO ACQUAINT THEMSELVES WITH THE SITE CONDITIONS AND ANY
PROBLEMS INCIDENT TO THE PROSECUTION OF THE WORK.
This page was intentionally left blank for duplex printing.
SU
BM
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
P
AG
ES
AB
SE
C O
N
IS
LA
N
D B
EA
C
H
FI
LL
; A
C ;V
EN
TN
O R
; M
AR
G
AT
E;
A
N D
L O
N G
PO
R
T
3.
G C
O R
Pr og re ss
C on st ru ct io n Ph ot og ra ph s 3.
G
C O
R Po st -C on st ru ct io n
Ph ot og ra ph s
G C
O R
Po st
-B ea ch fil l G eo
-re fe re nc ed Ae ria l I m ag er y
3.
G D
O Ae ria l O bl iq ue s
SD
-0
Pr ec on st ru ct io n Su bm itt al s
1.
G Su bm itt al R eg is te r
SD
-0
Pr ec on st ru ct io n Su bm itt al s
G D
O N am es a nd
Q ua lif ic at io ns 1.
G
C O
R Ac ci de nt P re ve nt io n Pl an (A
PP
G D
O C on tra ct or
A cc id en t P re ve nt io n
Pl an
(A
PP
) C he ck lis t 1.
7.
2.
FI
O C
O
VI
D -1
Pr ot ec tio n
Pl an
SD
-0
Te st R ep or ts 1.
FI
O M on th ly E xp os ur e
R ep or ts
1.
FI
O
N ot ifi ca tio ns a nd
R ep or ts
1.
.2 G
C O
R Ac ci de nt R ep or ts 1.
.3
FI
O
LH
E
In sp ec tio n R ep or ts 1.
G
C O
R D iv e
O pe ra tio ns P la n
SD
-0
C er tif ic at es 1.
6.
2.
FI
O
SS
H O
D ai ly In sp ec tio n ch ec kl is t 1.
6.
1.
G
D O
C ra ne O pe ra to rs
/R ig ge rs
1.
7.
2.
G C
O R
St an da rd
L ift
P la n 1.
7.
2.
G
C O
R C rit ic al L ift P la n
1.
7.
2.
G C
O R
N av al A rc hi te ct ur e
An al ys isSU
B M
IT
TA
L R
EG
IS
TE
R
C O
N
TR
AC
T
N O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
Amendment No. 0002
Section 01 33 00 Page 17
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
P
AG
ES
AB
SE
C O
N
IS
LA
N
D B
EA
C
H
FI
LL
; A
C ;V
EN
TN
O R
; M
AR
G
AT
E;
A
N D
L O
N G
PO
R
T
1.
FI
O
Ac tiv ity H az ar d An al ys is (A
H A)
1.
9.
FI
O C on fin ed S pa ce
E nt ry P er m it 1.
9.
FI
O
H ot
W or k Pe rm it
1.
.4
FI
O C er tif ic at e of
C om pl ia nc e
1.
FI
O
Li ce ns e
C er tif ic at es
1.
.1 G
C O
R Po rta bl e G au ge
O pe ra tio ns Pl an ni ng W or ks he et
G D
O Fl oa tin g Pl an t I ns pe ct io n
SD
-0
Pr ec on st ru ct io n
Su bm itt al s 1.
G
D O
M
EC
S af et y an d
W or k Pl an
SD
-0
Sa m pl es
3.
1.
G
C O
R D is ch ar ge
E nd
S cr ee ni ng D ev ic e
SD
-0
C er tif ic at es
1.
5.
G
D O
Sa fe
P ra ct ic es M an ua l 1.
5.
G D
O D iv in g O pe ra tio ns
P la n 1.
5.
G D
O Ac tiv ity
H az ar d
An al ys is
(A H
A) 1.
5.
G D
O Em er ge nc y
M an ag em en t P la n
1.
5.
G
D O
D ec om pr es si on P la n
1.
5.
G
D O
D iv e Pe rs on ne l Q ua lif ic at io ns
1.
5.
G
D O
Eq ui pm en t/A ir
Q ua lit y
C er tif ic at io ns 1.
7.
G D
O D ai ly
L og s
SD
-0
Pr ec on st ru ct io n
Su bm itt al s 3.
4.
G D
O Q ua lif ic at io ns
3.
G D
O C on tra ct or
Q ua lit y
C on tro l (
C Q
C
Pl an
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
Amendment No. 0002
Section 01 33 00 Page 18
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
P
AG
ES
AB
SE
C O
N
IS
LA
N
D B
EA
C
H
FI
LL
; A
C ;V
EN
TN
O R
; M
AR
G
AT
E;
A
N D
L O
N G
PO
R
T
SD
-0
Te st R ep or ts 3.
9.
FI
O
Ve rif ic at io n
St at em en t G
C O
R R ep or ts
SD
-0
C er tif ic at es
G D
O Fl oa tin g Pl an t I ns pe ct io n
SD
-0
Pr ec on st ru ct io n
Su bm itt al s 1.
G
C O
R C on st ru ct io n
Si te
P la n 3.
5.
G C
O R
Tr af fic C on tro l P la n 2.
2.
G C
O R
H au l R oa d Pl an
SD
-0
Pr ec on st ru ct io n
Su bm itt al s 1.
6.
FI
O
Vi su al S ur ve y 1.
G
C O
R En vi ro nm en ta l P ro te ct io n Pl an 1.
G
C O
R En vi ro nm en ta l P ro te ct io n Pl an 1.
6.
G C
O R
Em pl oy ee
T ra in in g R ec or ds
SD
-0
C er tif ic at es
3.
4.
2.
G
PL
Q ua lif ic at io ns 3.
4.
2.
FI
O R ep or ts
SD
-1
C lo se ou t S ub m itt al s
3.
4.
2.
FI
O
R ec or ds
1.
6.
G
As se m bl ed E m pl oy ee
T ra in in g R ec or ds
SD
-0
Pr ec on st ru ct io n
Su bm itt al s 1.
G
D O
Q ua lif ic at io ns 1.
7.
G D
O C er tif ie d
Li fe gu ar ds G
D O
Su rv ey in g Pr oc ed ur es a nd
Eq ui pm en t
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
Amendment No. 0002
Section 01 33 00 Page 19
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
P
AG
ES
AB
SE
C O
N
IS
LA
N
D B
EA
C
H
FI
LL
; A
C ;V
EN
TN
O R
; M
AR
G
AT
E;
A
N D
L O
N G
PO
R
T
3.
G D
O Pr e- Be ac hf ill Pr oj ec t A re a Su rv ey
SD
-0
C er tif ic at es 3.
G
D O
Sw im m in g H az ar d As se ss m en t G
D O
Pr e-
Pl ac em en t C on di tio n Su rv ey s 3.
8.
G D
O Lo ca tio ns o f S ur ve y
Li ne s 3.
9.
G D
O Lo ca tio ns o f S ur ve y
Li ne s G
D O
Be fo re -D re dg in g
Bo rro w A re a
Su rv ey s
G D
O Af te r-D re dg in g
Bo rro w A re a
Su rv ey s
G D
O Be fo re
-B ea ch fil l S ur ve ys
G D
O Af te r-B ea ch fil l S ur ve ys 3.
FI
O Su rv ey
L og s
FI
O D
G
PS
P os iti on in g
G D
O Po st -P la ce m en t C on di tio n Su rv ey s 3.
7.
FI
O
Ph ot og ra ph ic
D oc um en ta tio n of
Su rv ey s
3.
G D
O M et ad at a
SD
-0
Pr ec on st ru ct io n Su bm itt al s
G D
O Q ua lif ic at io ns
G D
O Le tte r t o O w ne rs G
D O
St ru ct ur e M on ito rin g
Pl an
SD
-0
C er tif ic at es G
D O
M on ito rin g R ep or t
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
Amendment No. 0002
Section 01 33 00 Page 20
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
P
AG
ES
AB
SE
C O
N
IS
LA
N
D B
EA
C
H
FI
LL
; A
C ;V
EN
TN
O R
; M
AR
G
AT
E;
A
N D
L O
N G
PO
R
T
SD
-1
C lo se ou t S ub m itt al s 3.
G
D O
As -B ui lt
D ra w in gs 3.
G
D O
R ec or d
D ra w in gs G
D O
R ec or d
M od el
SD
-0
Pr ec on st ru ct io n
Su bm itt al s G
D O
D et ai le d W or k
Pl an
SD
-0
Sh op D ra w in gs
G D
O In st al la tio n D ra w in gs
1.
G D
O Sp lic ed
T im be r S tru t C on ne ct io ns
SD
-0
C er tif ic at es
1.
5.
G
D O
Pr es er va tiv e
Tr ea te d
Ti m be r
1.
5.
G
D O
M
SD
S an d C
IS
1.
5.
G D
O Pe st ic id e
Ap pl ic at or G
D O
Eq ui pm en t D es cr ip tio n
2.
1.
G
D O
H ar dw ar e
SD
-1
C lo se ou t S ub m itt al s
3.
3.
G
D O
Pi le
In st al la tio n
R ec or d
1.
G D
O Pi le In st al la tio n D ra w in gs
SD
-0
Pr od uc t D at a 2.
1.
G D
O Th re ad
2.
G D
O M an uf ac tu rin g
Q ua lit y
C on tro l
Sa m pl in g an d Te st in g
SD
-0
Sa m pl es
3.
G D
O Q ua lit y As su ra nc e
Sa m pl es a nd
Te st s
SD
-0
C er tif ic at es
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
Amendment No. 0002
Section 01 33 00 Page 21
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
P
AG
ES
AB
SE
C O
N
IS
LA
N
D B
EA
C
H
FI
LL
; A
C ;V
EN
TN
O R
; M
AR
G
AT
E;
A
N D
L O
N G
PO
R
T
2.
1.
G
D O
G eo te xt ile
SD
-0
Pr ec on st ru ct io n
Su bm itt al s G
D O
W or k Pl an s
SD
-0
Pr od uc t D at a G
D O
M at er ia ls 1.
4.
FI
O
M
SD
S an d C
IS
1.
4.
FI
O
Be st
M an ag em en t P ra ct ic es
(B M
Ps
1.
4.
FI
O Pe st ic id e
Ap pl ic at or G
D O
Po st a nd
R ai l F en ce G
D O
Sp lit
R ai l F en ce 2.
FI
O
AD
A C om pl ia nt
S ec on da ry H an dr ai l S ys te m G
C O
R So ur ce fo r I
-5 M at er ia l
SD
-0
Sa m pl es G
D O
I-5 M at er ia l
SD
-0
Te st R ep or ts 1.
4.
FI
O
In sp ec tio n R ep or t G
D O
G ra in S iz e
D is tri bu tio n
C ur ve s
G D
O Te st in g R es ul ts
SD
-0
C er tif ic at es
1.
4.
FI
O C er tif ic at es o f G ra de 3.
3.
G D
O N uc le ar G au ge
SD
-0
Pr ec on st ru ct io n Su bm itt al s
G D
O C on cr et e
C ro ss ov er W or k
Pl an
SD
-0
Sh op D ra w in gs
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
Amendment No. 0002
Section 01 33 00 Page 22
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
P
AG
ES
AB
SE
C O
N
IS
LA
N
D B
EA
C
H
FI
LL
; A
C ;V
EN
TN
O R
; M
AR
G
AT
E;
A
N D
L O
N G
PO
R
T
2.
G D
O R em ov ab le
B ol la rd s
SD
-0
Pr od uc t D at a
2.
G D
O C on cr et e
2.
G D
O G eo te xt ile
G D
O D en se
G ra de d
Ag gr eg at e G
D O
Jo in t F ille r 2.
G
D O
R ei nf or ci ng
2.
9.
G
D O
D ow el s
2.
9.
G
D O
D ow el B ar A ss em bl ie s 2.
.2
G D
O H an ge rs 2.
.2
G D
O Ti e-do w ns
3.
.1 G
D O
Ti e-do w ns 2.
.3
G Bo ar dw al k
D ec k Lu m be r
SD
-0
Te st
R ep or ts
2.
G D
O C on cr et e
2.
G D
O G al va ni zi ng R ep or t 1.
4.
G D
O Ti m be r p re se rv at iv e in sp ec tio n
3.
FI
O
Fi el d Q ua lit y C on tro l
SD
-0
C er tif ic at es
1.
4.
G
D O
W el di ng
P ro ce du re s
G D
O W el de r Q ua lif ic at io n 2.
G
D O
R ei nf or ci ng
G D
O D ow el s an d Ti e Ba rs G
D O
D el iv er y Ti ck et s fo r C on cr et e 2.
G
D O
Bo lts
C er tif ic at io n 2.
.1
G D
O Ti m be r C er tif ic at io n
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
Amendment No. 0002
Section 01 33 00 Page 23
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
P
AG
ES
AB
SE
C O
N
IS
LA
N
D B
EA
C
H
FI
LL
; A
C ;V
EN
TN
O R
; M
AR
G
AT
E;
A
N D
L O
N G
PO
R
T
SD
-0
Pr od uc t D at a 2.
FI
O W oo dy
V eg et at io n
2.
2.
FI
O Fe rti liz er
SD
-0
C er tif ic at es
FI
O
Sa nd
F en ce 2.
2.
FI
O
Pl an ts 1.
4.
FI
O
N ur se ry
C er tif ic at io ns
SD
-0
Pr ec on st ru ct io n
Su bm itt al s G
D O
D et ai le d W or k
Pl an
1.
5.
G
D O
Sh or in g an d
Sh ee tin g
Pl an
1.
5.
FI
O D ew at er in g W or k
Pl an
SD
-0
Sh op D ra w in gs
G D
O O ut fa ll Pi pe M od ifi ca tio ns
SD
-0
Pr od uc t D at a
2.
1.
G
D O
D uc til e
Iro n
Pi pe a nd
F itt in gs
2.
1.
G
D O
U ni ve rs al F le xi bl e
Pi pe
C ou pl in g G
D O
El as to m er ic
S ea la nt
G D
O R ub be r G as ke ts
2.
1.
FI
O M ec ha ni ca l J oi nt R es tra in t
SD
-0
C er tif ic at es 2.
1.
G D
O D uc til e Iro n Pi pe a nd F itt in gs 2.
1.
G D
O U ni ve rs al
F le xi bl e Pi pe C ou pl in g
G D
O El as to m er ic S ea la nt G
C O
R R ub be r G as ke ts
FI
O
O ut fa ll
Pi pe
R ep ai rs
SD
-0
Pr ec on st ru ct io n Su bm itt al s
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
Amendment No. 0002
Section 01 33 00 Page 24
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
P
AG
ES
AB
SE
C O
N
IS
LA
N
D B
EA
C
H
FI
LL
; A
C ;V
EN
TN
O R
; M
AR
G
AT
E;
A
N D
L O
N G
PO
R
T
G C
O R
D re dg e
Pl an t I ns tru m en ta tio n
Pl an
R ev is io ns o r A dd en du m G
C O
R C on ta ct or
Q ua lit y
C on tro l P la n, se ct io n
3.
2.
SD
-0
Te st
R ep or ts
G C
O R
D at a Ap pr op ria te ly A rc hi ve d e-m ai l, se ct io n
3.
2.
SD
-0
C er tif ic at es
G C
O R
Le tte r o f N at io na l D re dg in g
Q ua lit y
M an ag em en t P ro gr am C er tif ic at io n
SD
-0
Pr ec on st ru ct io n Su bm itt al s
G D
O Bo rro w
A re as G
C O
R D eb ris
P re ve nt io n
Pl an
G D
O W or k
Pl an
G C
O R
Pu m po ut
P la n G
C O
R Ve ss el a nd
E qu ip m en t L is t
3.
3.
G
C O
R G ra de
S ta ke R ec ov er y
Pl an
SD
-0
Te st R ep or ts 3.
4.
G C
O R
D ai ly R ep or t o f O pe ra tio ns
FI
O
Fu el
U sa ge G
C O
R D ai ly
D re dg eh ea d
Po si tio ni ng R ec or ds G
D O
Te st
R ep or ts
SD
-0
C er tif ic at es
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
Amendment No. 0002
Section 01 33 00 Page 25
IT
TA
L
FO
R M
,J an
PR
EV
IO
U
S
ED
IT
IO
N
IS
O
BS
O
LE
TE
PA
G E
O
F
P
AG
ES
AB
SE
C O
N
IS
LA
N
D B
EA
C
H
FI
LL
; A
C ;V
EN
TN
O R
; M
AR
G
AT
E;
A
N D
L O
N G
PO
R
T
3.
3.
G
D O
Ad ju st ed
C on st ru ct io n Te m pl at e
R eq ue st
FI
O
D G
PS
P os iti on in g
FI
O D re dg e Po si tio n M ap
SU
B
M
IT
TA
L
R
EG
IS
TE
R C
O N
TR
AC
T N
O
TI
TL
E
AN
D L
O C
AT
IO
N C
O N
TR
AC
TO
R
C O
N
TR
AC
TO
R
SC
H
ED
U
LE
D
AT
ES
C O
N
TR
AC
TO
R
AC
TI
O
N
AP
PR
O
VI
N
G A
U
TH
O R
IT
Y
A C T I V I T Y N O
T R A N S M I T T A L N O
S P E C S E C T
D
ES
C R
IP
TI
O N
IT
EM
S U
BM
IT
TE
D
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T O R A / E R E V W R
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
BY
M
AT
ER
IA
L N
EE
D
ED
BY
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D
TO
A
PP
R
AU
TH
D
AT
E R
C D
FR
O
M C
O N
TR
D
AT
E
FW
D
TO
O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
FR
O
M O
TH
R
EV
IE
W
ER
A C T I O N C O D E
D
AT
E O
F
AC
TI
O
N
M
AI
LE
D
TO
C
O N
TR
D
AT
E R
C D
FR
M
A
PP
R
AU
TH
R
EM
AR
KS
(a
(b
(c
(d
(e
(f) (g
(h
(i)
(j) (k
(l)
(m
(n
(o
(p
(q
(r)
Amendment No. 0002
Section 01 33 00 Page 26
1.7.2.2 Standard Lift Plan (SLP)
Plan lifts to avoid situations where the operator cannot maintain safe control of the lift. Prepare a written SLP in accordance with EM 385-1-1, Section 16.A.03, using Form 16-2 for every lift or series of lifts (if duty cycle or routine lifts are being performed). The SLP must be developed, reviewed and accepted by all personnel involved in the lift in conjunction with the associated AHA. Signature on the AHA constitutes acceptance of the plan. Maintain the SLP on the LHE for the current lift(s) being made.
Maintain historical SLPs for a minimum of 3 months.
1.7.2.3 Critical Lift Plan - Crane or Load Handling Equipment
Provide a Critical Lift Plan as required by EM 385-1-1, Section 16.H.01, using Form 16-3. In addition, Critical Lift Plans are required for the following:
a. Lifts over 50 percent of the capacity of barge mounted mobile crane's hoist.
b. When working around energized power lines where the work will get closer than the minimum clearance distance in EM 385-1-1 Table 16-1.
c. For lifts with anticipated binding conditions.
d. When erecting cranes.
1.7.2.3.1 Critical Lift Plan Planning and Schedule
Critical lifts require detailed planning and additional or unusual safety precautions. Develop and submit a critical lift plan to the Contracting Officer 30 calendar days prior to critical lift. Comply with load testing requirements in accordance with EM 385-1-1, Section 16.F.03.
1.7.2.3.2 Lifts of Personnel
In addition to the requirements of EM 385-1-1, Section 16.H.02, for lifts of personnel, demonstrate compliance with the requirements of 29 CFR 1926.1400 and EM 385-1-1, Section 16.T.
1.7.2.4 Barge Mounted Mobile Crane Lift Plan
Provide a Naval Architecture Analysis and include an LHE Manufacturer's Floating Service Load Chart in accordance with EM 385-1-1, Section 16.L.03.
1.7.2.5 Multi-Purpose Machines, Material Handling Equipment, and Construction Equipment Lift Plan
Multi-purpose machines, material handling equipment, and construction equipment used to lift loads that are suspended by rigging gear, require proof of authorization from the machine OEM that the machine is capable of making lifts of loads suspended by rigging equipment. Written approval from a qualified registered professional engineer, after a safety analysis is performed, is allowed in lieu of the OEM's approval. Demonstrate that the operator is properly trained and that the equipment is properly configured to make such lifts and is equipped with a load chart.
Section 01 35 26 Page 15
1.7.2.6 Fall Protection and Prevention (FP&P) Plan
The plan must comply with the requirements of EM 385-1-1, Section 21.D and ASSP Z359.2, be site specific, and address all fall hazards in the work place and during different phases of construction. Address how to protect and prevent workers from falling to lower levels when they are exposed to fall hazards above 6 feet. A competent person or qualified person for fall protection must prepare and sign the plan documentation. Include fall protection and prevention systems, equipment and methods employed for every phase of work, roles and responsibilities, assisted rescue, self-rescue and evacuation procedures, training requirements, and monitoring methods.
Review and revise, as necessary, the Fall Protection and Prevention Plan documentation as conditions change, but at a minimum every six months, for lengthy projects, reflecting any changes during the course of construction due to changes in personnel, equipment, systems or work habits. Keep and maintain the accepted Fall Protection and Prevention Plan documentation at the job site for the duration of the project. Include the Fall Protection and Prevention Plan documentation in the Accident Prevention Plan (APP).
1.7.2.7 Rescue and Evacuation Plan
Provide a Rescue and Evacuation Plan in accordance with EM 385-1-1 Section 21.N and ASSP Z359.2, and include in the FP&P Plan and as part of the APP.
Include a detailed discussion of the following: methods of rescue; methods of self-rescue; equipment used; training requirement; specialized training for the rescuers; procedures for requesting rescue and medical assistance;
and transportation routes to a medical facility.
1.7.2.8 Hazardous Energy Control Program (HECP)
Develop a HECP in accordance with EM 385-1-1 Section 12, 29 CFR 1910.147, 29 CFR 1910.333, 29 CFR 1915.89, ASSP Z244.1, and ASSP A10.44. Submit this HECP as part of the Accident Prevention Plan (APP). Conduct a preparatory meeting and inspection with all effected personnel to coordinate all HECP activities. Document this meeting and inspection in accordance with EM 385-1-1, Section 12.A.02. Ensure that each employee is familiar with and complies with these procedures.
1.7.2.9 COVID-19 Protection Plan
Provide a COVID-19 Protection Plan that addresses protocols for COVID-19 Coronavirus in accordance with OSHA, CDC, and state guidelines. The plan shall include workforce education and training, PPE requirements and protocol for wearing PPE, job-related protocols (distancing whenever possible, modifying activities to reduce potential exposure, etc.), actions taken for personnel exhibiting symptoms of COVID-19, and actions taken by the Contractor for employees who fail to follow requirements.
1.8 ACTIVITY HAZARD ANALYSIS (AHA)
Before beginning each activity, task or Definable Feature of Work (DFOW) involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work, the Contractor(s) performing that work activity must prepare an AHA. AHAs must be developed by the Prime Contractor, subcontractor, or supplier performing the work, and provided for Prime Contractor review and approval before submitting to the Contracting Officer. AHAs must be signed
Section 01 35 26 Page 16 by the SSHO, Superintendent, CQCSM and the subcontractor Foreman performing the work. Format the AHA in accordance with EM 385-1-1, Section 1 or as directed by the Contracting Officer. Submit the AHA for review at least 15 working days prior to the start of each activity task, or DFOW. The Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work sequences, specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented.
AHAs must identify competent persons required for phases involving high risk activities, including confined entry, crane and rigging, excavations, trenching, electrical work, fall protection, and scaffolding.
1.8.1 AHA Management
Review the AHA list periodically (at least monthly) at the Contractor supervisory safety meeting, and update as necessary when procedures, scheduling, or hazards change. Use the AHA during daily inspections by the SSHO to ensure the implementation and effectiveness of the required safety and health controls for that work activity.
1.8.2 AHA Signature Log
Each employee performing work as part of an activity, task or DFOW must review the AHA for that work and sign a signature log specifically maintained for that AHA prior to starting work on that activity. The SSHO must maintain a signature log on site for every AHA. Provide employees whose primary language is other than English, with an interpreter to ensure a clear understanding of the AHA and its contents.
1.9 DISPLAY OF SAFETY INFORMATION
1.9.1 Safety Bulletin Board
Within 1 calendar day after commencement of work, erect a safety bulletin board at the job site. Where size, duration, or logistics of project do not facilitate a bulletin board, an alternative method, acceptable to the Contracting Officer, that is accessible and includes all mandatory information for employee and visitor review, may be deemed as meeting the requirement for a bulletin board. Include and maintain information on safety bulletin board as required by EM 385-1-1, Section 01.A.07.
Additional items required to be posted include:
a. Confined space entry permit.
b. Hot work permit.
1.9.2 Safety and Occupational Health (SOH) Deficiency Tracking System
Establish a SOH deficiency tracking system that lists and monitors the status of SOH deficiencies in chronological order. Use the tracking system to evaluate the effectiveness of the APP. A monthly evaluation of the data must be discussed in the QC or SOH meeting with everyone on the project.
The list must be posted on the project bulletin board and updated daily, and provide the following information:
a. Date deficiency identified;
b. Description of deficiency;
Section 01 35 26 Page 17
c. Name of person responsible for correcting deficiency;
d. Projected resolution date;
e. Date actually resolved.
1.10 SITE SAFETY REFERENCE MATERIALS
Maintain safety-related references applicable to the project, including those listed in paragraph REFERENCES. Maintain applicable equipment manufacturer's manuals.
1.11 EMERGENCY MEDICAL TREATMENT
Contractors must arrange for their own emergency medical treatment in accordance with EM 385-1-1. Government has no responsibility to provide emergency medical treatment.
1.12 NOTIFICATIONS and REPORTS
1.12.1 Mishap Notification
Notify the Contracting Officer as soon as practical, but no more than twenty-four hours, after any mishaps, including recordable accidents, incidents, and near misses, as defined in EM 385-1-1 Appendix Q, any report of injury, illness, or any property damage. For LHE or rigging mishaps, notify the Contracting Officer as soon as practical but not more than 4 hours after mishap. The Contractor is responsible for obtaining appropriate medical and emergency assistance and for notifying fire, law enforcement, and regulatory agencies. Immediate reporting is required for electrical mishaps, to include Arc Flash; shock; uncontrolled release of hazardous energy (includes electrical and non-electrical); load handling equipment or rigging; fall from height (any level other than same surface);
and underwater diving. These mishaps must be investigated in depth to identify all causes and to recommend hazard control measures.
Within notification include Contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (for example, type of construction equipment used and PPE used). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted. Assist and cooperate fully with the Government's investigation(s) of any mishap.
1.12.2 Accident Reports
a. Conduct an accident investigation for recordable injuries and illnesses, property damage, and near misses as defined in EM 385-1-1, to establish the root cause(s) of the accident. Complete the applicable USACE Accident Report Form 3394, and provide the report to the Contracting Officer within 5 calendar day(s) of the accident. The Contracting Officer will provide copies of any required or special forms.
b. Near Misses: Report all "Near Misses" to the GDA, using local mishap reporting procedures, within 24 hrs. The Contracting Officer will
Section 01 35 26 Page 18 provide the Contractor the required forms. Near miss reports are considered positive and proactive Contractor safety management actions.
c. Conduct an accident investigation for any load handling equipment accident (including rigging accidents) to establish the root cause(s) of the accident. Complete the LHE Accident Report (Crane and Rigging Accident Report) form and provide the report to the Contracting Officer within 30 calendar days of the accident. Do not proceed with crane operations until cause is determined and corrective actions have been implemented to the satisfaction of the Contracting Officer. The Contracting Officer will provide a blank copy of the accident report form.
1.12.3 LHE Inspection Reports
Submit LHE inspection reports required in accordance with EM 385-1-1 and as specified herein with Daily Reports of Inspections.
1.12.4 Certificate of Compliance and Pre-lift Plan/Checklist for LHE and Rigging
Provide a FORM 16-1 Certificate of Compliance for LHE entering an activity under this contract and in accordance with EM 385-1-1. Post certifications on the crane. FORM CENAP 16-1 is attached to the end of this section.
Develop a Standard Lift Plan (SLP) in accordance with EM 385-1-1, Section 16.H.03 using Form 16-2 Standard Pre-Lift Crane Plan/Checklist for each lift planned. Submit SLP to the Contracting Officer for approval within 15 calendar days in advance of planned lift.
1.13 HOT WORK
1.13.1 Permit and Personnel Requirements
Submit and obtain a written permit prior to performing "Hot Work" (i.e.
welding or cutting) or operating other flame-producing/spark producing devices, from the Contractor's designated permit authorizing individual.
Use DA Form 5383-R Hot-Work Permit, attached to this section, unless otherwise directed. A permit is required from the Explosives Safety Office for work in and around where explosives are processed, stored, or handled.
CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED.
Provide at least two 20 pound 4A:20 BC rated extinguishers for normal "Hot Work". The extinguishers must be current inspection tagged, and contain an approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch must be trained in accordance with NFPA 51B and remain on-site for a minimum of one hour after completion of the task or as specified on the hot work permit.
When starting work in the facility, require personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the emergency local Fire Department phone number. REPORT ANY FIRE, NO MATTER HOW SMALL, TO THE RESPONSIBLE LOCAL FIRE DEPARTMENT IMMEDIATELY.
1.13.2 Work Around Flammable Materials
Obtain permit approval from a NFPA Certified Marine Chemist for "HOT WORK" within or around flammable materials (such as fuel systems or welding/cutting on fuel pipes) or confined spaces (such as sewer wet wells, Section 01 35 26 Page 19 manholes, or vaults) that have the potential for flammable or explosive atmospheres.
Whenever these materials, except beryllium and chromium (VI), are encountered in indoor operations, local mechanical exhaust ventilation systems that are sufficient to reduce and maintain personal exposures to within acceptable limits must be used and maintained in accordance with manufacturer's instruction and supplemented by exceptions noted in EM 385-1-1, Section 06.H.
1.14 RADIATION SAFETY REQUIREMENTS
Submit License Certificates, employee training records, and Leak Test Reports for radiation materials and equipment to the Contracting Officer for all specialized and licensed material and equipment proposed for use on the project (excludes portable machine sources of ionizing radiation including moisture density and X-Ray Fluorescence (XRF)). Maintain on-site records whenever licensed radiological materials or ionizing equipment are on government property.
Protect workers from radiation exposure in accordance with 10 CFR 20, ensuring any personnel exposures are maintained As Low As Reasonably Achievable.
1.14.1 Radiography Operation Planning Work Sheet
For portable machine sources of ionizing radiation, including moisture density and XRF, use and submit the Portable Gauge Operations Planning Worksheet. The Contracting Officer will review the submitted worksheet and provide questions and comments.
Contractors must use primary dosimeters process by a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory.
1.14.2 Site Access and Security
Coordinate site access and security requirements with the Contracting Officer for all radiological materials and equipment containing ionizing radiation that are proposed for use. The authorized representative will meet the Contractor at a designated location, ensure safety of the materials being transported, and will escort the Contractor to the job site and return upon completion of the work.
Provide a copy of all calibration records, and utilization records for radiological operations performed on the site.
1.14.3 Loss or Release and Unplanned Personnel Exposure
Loss or release of radioactive materials, and unplanned personnel exposures must be reported immediately to the Contracting Officer.
1.14.4 Site Demarcation and Barricade
Properly demark and barricade an area surrounding radiological operations to preclude personnel entrance, in accordance with EM 385-1-1, Nuclear Regulatory Commission, and Applicable State regulations and license requirements, and in accordance with requirements established in the accepted Radiography Operation Planning Work Sheet.
Section 01 35 26 Page 20
Do not close or obstruct streets, walks, and other facilities occupied and used by the Government without written permission from the Contracting Officer.
1.14.5 Security of Material and Equipment
Properly secure the radiological material and ionizing radiation equipment at all times, including keeping the devices in a properly marked and locked container, and secondarily locking the container to a secure point in the Contractor's vehicle or other approved storage location during transportation and while not in use. While in use, maintain a continuous visual observation on the radiological material and ionizing radiation equipment. In instances where radiography is scheduled near or adjacent to buildings or areas having limited access or one-way doors, make no assumptions as to building occupancy. Where necessary, the Contracting Officer will direct the Contractor to conduct an actual building entry, search, and alert. Where removal of personnel from such a building cannot be accomplished and it is otherwise safe to proceed with the radiography, position a fully instructed employee inside the building or area to prevent exiting while external radiographic operations are in process.
1.14.6 Transportation of Material
Comply with 49 CFR 173 for Transportation of Regulated Amounts of Radioactive Material. Notify Local Fire authorities of any Radioactive Material use.
1.14.7 Schedule for Exposure or Unshielding
Actual exposure of the radiographic film or unshielding the source must not be initiated until after 5 p.m. on weekdays.
1.14.8 Transmitter Requirements
Adhere to the base policy concerning the use of transmitters, such as radios and cell phones. Obey Emissions control (EMCON) restrictions.
1.15 CONFINED SPACE ENTRY REQUIREMENTS
Confined space entry must comply with Section 34 of EM 385-1-1, OSHA 29 CFR 1926, OSHA 29 CFR 1910, OSHA 29 CFR 1910.146, and OSHA Directive CPL 2.100. Any potential for a hazard in the confined space requires a permit system to be used.
1.15.1 Entry Procedures
Prohibit entry into a confined space by personnel for any purpose, including hot work, until the qualified person has conducted appropriate tests to ensure the confined or enclosed space is safe for the work intended and that all potential hazards are controlled or eliminated and documented. Comply with EM 385-1-1, Section 34 for entry procedures.
Hazards pertaining to the space must be reviewed with each employee during review of the AHA.
1.15.2 Forced Air Ventilation
Forced air ventilation is required for all confined space entry operations and the minimum air exchange requirements must be maintained to ensure exposure to any hazardous atmosphere is kept below its action level.
Section 01 35 26 Page 21
1.15.3 Sewer Wet Wells
Sewer wet wells require continuous atmosphere monitoring with audible alarm for toxic gas detection.
1.15.4 Rescue Procedures and Coordination with Local Emergency Responders
Develop and implement an on-site rescue and recovery plan and procedures.
The rescue plan must not rely on local emergency responders for rescue from a confined space.
1.16 DIVE SAFETY REQUIREMENTS
Develop a Dive Operations Plan, AHA, emergency management plan, and personnel list that includes qualifications, for each separate diving operation. See Section 01 35 50 DIVING SERVICES for additional requirements. Submit these documents to the District Dive Coordinator (DDC) via the Contracting Officer, for review and approval at least 15 working days prior to commencement of diving operations. These documents must be at the diving location at all times. Provide each of these documents as a part of the project file.
1.17 SEVERE STORM PLAN
In the event of a severe storm warning, the Contractor must:
a. Secure outside equipment and materials and place materials that could be damaged in protected areas.
b. Check surrounding area, including roof, for loose material, equipment, debris, and other objects that could be blown away or against existing facilities.
c. Ensure that temporary erosion controls are adequate.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 CONSTRUCTION AND OTHER WORK
Comply with EM 385-1-1, NFPA 70, NFPA 70E, NFPA 241, the APP, the AHA, Federal and State OSHA regulations, and other related submittals and activity fire and safety regulations. The most stringent standard prevails.
PPE is governed in all areas by the nature of the work the employee is performing. Use personal hearing protection at all times in designated noise hazardous areas or when performing noise hazardous tasks. Safety glasses must be worn or carried/available on each person. Mandatory PPE includes:
a. Hard Hat
b. Long Pants
c. Appropriate Safety Shoes
Section 01 35 26 Page 22
d. Appropriate Class Reflective Vests or other similarly reflective jackets or clothing.
3.1.1 Worksite Communication
Employees working alone in a remote location or away from other workers must be provided an effective means of emergency communications (i.e., cellular phone, two-way radios, land-line telephones or other acceptable means). The selected communication must be readily available (easily within the immediate reach) of the employee and must be tested prior to the start of work to verify that it effectively operates in the area/environment. An employee check-in/check-out communication procedure must be developed to ensure employee safety.
3.1.2 Hazardous Material Exclusions
Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation (with the exception of radioactive material and devices used in accordance with EM 385-1-1 such as nuclear density meters for compaction testing and laboratory equipment with radioactive sources) as well as materials which contain asbestos, mercury or polychlorinated biphenyls, di-isocyanates, lead-based paint, and hexavalent chromium, are prohibited. The Contracting Officer, upon written request by the Contractor, may consider exceptions to the use of any of the above excluded materials. Low mercury lamps used within fluorescent lighting fixtures are allowed as an exception without further Contracting Officer approval. Notify the Radiation Safety Officer (RSO) prior to excepted items of radioactive material and devices being brought on base.
3.1.3 Unforeseen Hazardous Material
Contract documents identify materials such as PCB, lead paint, and friable and non-friable asbestos and other OSHA regulated chemicals (i.e. 29 CFR Part 1910.1000). If material(s) that may be hazardous to human health upon disturbance are encountered during construction operations, stop that portion of work and notify the Contracting Officer immediately. Within 14 calendar days the Government will determine if the material is hazardous.
If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to FAR 52.243-4 Changes and FAR 52.236-2 Differing Site Conditions.
3.2 UTILITY OUTAGE REQUIREMENTS
Apply for utility outages at least 14 days in advance. At a minimum, the written request must include the location of the outage, utilities being affected, duration of outage, any necessary sketches, and a description of the means to fulfill energy isolation requirements in accordance with EM 385-1-1, Section 11.A.02 (Isolation). Some examples of energy isolation devices and procedures are highlighted in EM 385-1-1, Section 12.D. In accordance with EM 385-1-1, Section 12.A.01, where outages involve Government or Utility personnel, coordinate with the Government on all activities involving the control of hazardous energy.
These activities include, but are not limited to, a review of HECP and HEC procedures, as well as applicable Activity Hazard Analyses (AHAs). In
Section 01 35 26 Page 23 accordance with EM 385-1-1, Section 11.A.02 and NFPA 70E, work on energized electrical circuits must not be performed without prior government authorization. Government permission is considered through the permit process and submission of a detailed AHA. Energized work permits are considered only when de-energizing introduces additional or increased hazard or when de-energizing is infeasible.
3.3 OUTAGE COORDINATION MEETING
After the utility outage request is approved and prior to beginning work on the utility system requiring shut-down, conduct a pre-outage coordination meeting in accordance with EM 385-1-1, Section 12.A. This meeting must include the Prime Contractor, the Prime and subcontractors performing the work, the Contracting Officer, and the Public Utilities representative.
All parties must fully coordinate HEC activities with one another. During the coordination meeting, all parties must discuss and coordinate on the scope of work, HEC procedures (specifically, the lock-out/tag-out procedures for worker and utility protection), the AHA, assurance of trade personnel qualifications, identification of competent persons, and compliance with HECP training in accordance with EM 385-1-1, Section 12.C.
Clarify when personal protective equipment is required during switching operations, inspection, and verification.
3.4 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)
Provide and operate a Hazardous Energy Control Program (HECP) in accordance with EM 385-1-1 Section 12, 29 CFR 1910.333, 29 CFR 1915.89, ASSP A10.44, NFPA 70E, and paragraph HAZARDOUS ENERGY CONTROL PROGRAM (HECP).
3.4.1 Safety Preparatory Inspection Coordination Meeting with the Government or Utility
For electrical distribution equipment that is to be operated by Government or Utility personnel, the Prime Contractor and the subcontractor performing the work must attend the safety preparatory inspection coordination meeting, which will also be attended by the Contracting Officer's Representative, and required by EM 385-1-1, Section 12.A.02. The meeting will occur immediately preceding the start of work and following the completion of the outage coordination meeting. Both the safety preparatory inspection coordination meeting and the outage coordination meeting must occur prior to conducting the outage and commencing with lockout/tagout procedures.
3.4.2 Lockout/Tagout Isolation
Where the Government or Utility performs equipment isolation and lockout/tagout, the Contractor must place their own locks and tags on each energy-isolating device and proceed in accordance with the HECP. Before any work begins, both the Contractor and the Government or Utility must perform energy isolation verification testing while wearing required PPE detailed in the Contractor's AHA and required by EM 385-1-1, Sections 05.I and 11.B. Install personal protective grounds, with tags, to eliminate the potential for induced voltage in accordance with EM 385-1-1, Section 12.E.06.
3.4.3 Lockout/Tagout Removal
Upon completion of work, conduct lockout/tagout removal procedure in accordance with the HECP. In accordance with EM 385-1-1, Section 12.E.08, Section 01 35 26 Page 24 each lock and tag must be removed from each energy isolating device by the authorized individual or systems operator who applied the device. Provide formal notification to the Government (by completing the Government form if provided by Contracting Officer's Representative), confirming that steps of de-energization and lockout/tagout removal procedure have been conducted and certified through inspection and verification. Government or Utility locks and tags used to support the Contractor's work will not be removed until the authorized Government employee receives the formal notification.
3.5 FALL PROTECTION PROGRAM
Establish a fall protection program, for the protection of all employees exposed to fall hazards. Within the program include company policy, identify roles and responsibilities, education and training requirements, fall hazard identification, prevention and control measures, inspection, storage, care and maintenance of fall protection equipment and rescue and evacuation procedures in accordance with ASSP Z359.2 and EM 385-1-1, Sections 21.A and 21.D.
3.5.1 Training
Institute a fall protection training program. As part of the Fall Protection Program, provide training for each employee who might be exposed to fall hazards. Provide training by a competent person for fall protection in accordance with EM 385-1-1, Section 21.C. Document training and practical application of the competent person in accordance with EM 385-1-1, Section 21.C.04 and ASSP Z359.2 in the AHA.
3.5.2 Fall Protection Equipment and Systems
Enforce use of personal fall protection equipment and systems designated (to include fall arrest, restraint, and positioning) for each specific work activity in the Site Specific Fall Protection and Prevention Plan and AHA at all times when an employee is exposed to a fall hazard. Protect employees from fall hazards as specified in EM 385-1-1, Section 21.
Provide…
This is the start of the file's text. The full file is on GovTribe.