B.08.03 Attachment A - Ft Carson Drawings.pdf

PDF 15 MB Posted

Attached to
Construction/Fire Protection MATOC - Design-Build (DB)/Design-Bid-Build (DBB) Amendment 0005 Phase TWO Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of the Army Corps of Engineers Engineering District Charleston

About this file

This document provides details on an amendment to a federal construction contract opportunity. The Department of the Army Corps of Engineers Engineering District Charleston is seeking bids through a Design-Build/Design-Bid-Build process for construction and fire protection services at Project Fort Carson as part of Phase Two. Amendment 0005 moves the project into the second phase and refers bidders to the attached drawings and specifications for Fort Carson. The opportunity type is listed as a Special Notice and responses are due as outlined in the amendment and associated attachments for Phase Two of the project.

View the file

Other files for this federal contract opportunity

Other files attached to Construction/Fire Protection MATOC - Design-Build (DB)/Design-Bid-Build (DBB) Amendment 0005 Phase TWO, newest first.
File Type Posted
B.08.03 Bid Schedule (1).pdf PDF
B08.03 W912HP22R6000 Amendment 0005 Phase Two.pdf PDF
B.08.03 Ft Carson Scope of Work.pdf PDF
B.08.03 Attachment B - Submittal register.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10.21.2022

1. Horizontal boring is recommended under the stream bed.

2. The Hydrant needs to be located outside the dump location.

A

A

A

AA

A

A

A

AA

A

A

Stormwater Sampling Point

North Specker Avenue Ditch

W4-3

W4-2

W4-1

LF4GP4

LF4GP3

LF4GP2

LF4MW07

LF4MW05

LF4MW06

LF4MW01

LF4MW04

LF4MW03

LF4MW02A

LF4GP1

E343

E341 o 0 200 400100

Feet

Legend Landfill Cover Boundary

A Monitoring Well ? Soil Gas Probe

Fences Roads Parking Lots Surface Water Drainage Outlet B-Ditch Vegetative Soil Cover Existing Buildings

PROJECTION: NAD83 UTM ZONE 13N

Z:\ Cli en ts\

EN

V\

EC

C\

6_ Ca rso nL

F\S tud ies \G eo sp ati al\

Ar cD oc s\2

4\L

F4 \Fi g_ 1_

LF

4_ sit eM ap .m xd ; A na lys t: j cla rke ; D ate : 1

/11 /20

2:

:31

PM

U.S. ARMY

ENVIRONMENTAL COMMAND

FT. CARSON

PERFORMANCE BASED ACQUISITION

MONITORING LOCATIONS

LANDFILL NO. 4

FORT CARSON MILITARY INSTALLATION

LANDFILL 4 2014 ANNUAL MONITORING

AND MAINTENANCE REPORT

FIGURE

NUMBER

ECC

1746 Cole Blvd, Bldg 21, Suite 350 Lakewood, CO 80401

Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Do not disturb the ground inside the red box.

Field verify exact location of dump site.

File details come from the government source that posted it. Updated .