About this file
This document provides details on an amendment to a federal construction contract opportunity. The Department of the Army Corps of Engineers Engineering District Charleston is seeking bids through a Design-Build/Design-Bid-Build process for construction and fire protection services at Project Fort Carson as part of Phase Two. Amendment 0005 moves the project into the second phase and refers bidders to the attached drawings and specifications for Fort Carson. The opportunity type is listed as a Special Notice and responses are due as outlined in the amendment and associated attachments for Phase Two of the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.03 Bid Schedule (1).pdf | ||
| B08.03 W912HP22R6000 Amendment 0005 Phase Two.pdf | ||
| B.08.03 Ft Carson Scope of Work.pdf | ||
| B.08.03 Attachment B - Submittal register.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10.21.2022
1. Horizontal boring is recommended under the stream bed.
2. The Hydrant needs to be located outside the dump location.
A
A
A
AA
A
A
A
AA
A
A
Stormwater Sampling Point
North Specker Avenue Ditch
W4-3
W4-2
W4-1
LF4GP4
LF4GP3
LF4GP2
LF4MW07
LF4MW05
LF4MW06
LF4MW01
LF4MW04
LF4MW03
LF4MW02A
LF4GP1
E343
E341 o 0 200 400100
Feet
Legend Landfill Cover Boundary
A Monitoring Well ? Soil Gas Probe
Fences Roads Parking Lots Surface Water Drainage Outlet B-Ditch Vegetative Soil Cover Existing Buildings
PROJECTION: NAD83 UTM ZONE 13N
Z:\ Cli en ts\
EN
V\
EC
C\
6_ Ca rso nL
F\S tud ies \G eo sp ati al\
Ar cD oc s\2
4\L
F4 \Fi g_ 1_
LF
4_ sit eM ap .m xd ; A na lys t: j cla rke ; D ate : 1
/11 /20
2:
:31
PM
U.S. ARMY
ENVIRONMENTAL COMMAND
FT. CARSON
PERFORMANCE BASED ACQUISITION
MONITORING LOCATIONS
LANDFILL NO. 4
FORT CARSON MILITARY INSTALLATION
LANDFILL 4 2014 ANNUAL MONITORING
AND MAINTENANCE REPORT
FIGURE
NUMBER
ECC
1746 Cole Blvd, Bldg 21, Suite 350 Lakewood, CO 80401
Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Do not disturb the ground inside the red box.
Field verify exact location of dump site.
File details come from the government source that posted it. Updated .