B.08.02 Statement of Work.pdf
PDF 194 KB Posted
- Attached to
- IAF-23-0011 Mauritania _ Aouinatt Health Clinic
- Solicitation number
- IAF-23-0011
- Issued by
-
Department of the Army European Command
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers Europe District
APO AE 09049
ar183
Statement of Work
OHASIS ID# 66626
Fiscal Year: 2023
Aouintt Health Clinic Aouintt, Mauritania
Prepared by:
Design Section
Engineering Branch 17 March 2023 [BCOES Review]
01 10 10 Statement of Work Aouintt Health Clinic – Aouintt, Mauritania
18-Mar-23 Page 2 of 38
SECTION 01 10 10
STATEMENT OF WORK
SECTION TABLE OF CONTENTS:
1 GENERAL
2 CIVIL & GEOTECHNICAL
3 ARCHITECTURAL
4 STRUCTURAL
5 ELECTRICAL
6 MECHANICAL & PLUMBING
ATTACHMENTS
Attachment #1 Project Location Map Attachment #2 Conceptual Site Plan Attachment #3 Dedication Plaque Attachment #4 Existing Conditions Photographs Attachment #5 Construction Drawings (Previous contract, for reference only) Attachment #6 Structural Calculations Guidelines Attachment #7 TAG13 The Design of VIP Latrines
1.0 GENERAL
1.1 PROJECT DESCRIPTION
The Request for Proposal (RFP) provides parameters for a design-build project for renovation of a facility in Aouintt, Mauritania; Latitude 16°09'17.4"N, Longitude 9°56'44.1"W (Refer to the attached Location Map.)
The existing Health Clinic was original executed as a Humanitarian Assistance (HA) project by the US Department of Navy’s Naval Facilities Engineering Systems Command (NAVFAC). The previous contractor began construction of the health clinic around late 2016 and completed about 85% of the construction work, before the contract was terminated for unknown reasons. The Contractor had completed construction of majority of primary (health clinic) and secondary (waiting area, latrines, perimeter wall, etc) facilities required per the contract, The specific details of the contract termination is not known. Since then, the Health Clinic had been locked and was never used. The intent of this project is to complete the unfinished construction work of the NAVFAC’s project and turn-over finished and operational Health Clinic facility to the local community.
The project includes the following general items of work, detailed requirements are contained elsewhere in this Statement of Work:
a. Completion of remaining construction work; mainly finishes, furnishings, patch/ paint, and replacement of interior and exterior doors.
b. Redo the existing roof gutter/ drainage for functionality.
c. Provide photo-voltaic (PV) power system for on-site electricity generation to meet the facility demand. Electrical furnishing work.
d. Re-screed the damaged walkway and re-screed the clinic roofing to provide better drainage.
e. Verify operability of the water and sanitary sewer/septic system.
f. Clear and grub vegetation in the compound.
g. Provide a 20 Liter portable hot-water boiler.
h. Provide (2) Wall-mounted split units to provide air conditioning in the delivery room and pharmacy (one unit each).
18-Mar-23 Page 3 of 38
1.2 GENERAL REQUIREMENTS
The Contractor must deliver fully functional, turnkey type facilities (without mobile furniture) as described in this document. The work includes - but is not limited to - design, demolition, fabrication, delivery, installation, construction, and site work.
The facility in this project must be complete and usable to meet codes and technical and functional requirements per this Statement of Work (SOW). The proposal price must include all design, calculations, approvals, certificates, fees, labor, material, equipment, direct overhead, indirect overhead, general and administrative expenses (G&A) and general conditions to complete this project as described in the SOW.
These design and product requirements are minimum requisites. Compliance with the provisions of this section by subcontractors is the responsibility of the Contractor.
1.2.1 BASE ITEMS AND OPTIONAL ITEMS
This Statement of Work addresses the technical requirements necessary to complete all work associated with this project. For information and requirements regarding the allocation of pricing between elements of the work, refer to Specification Section 01 22 00 PRICE AND PAYMENT PROCEDURES. The Schedule of Items identifies the breakdown between the individual base items and optional items for all work identified in this Statement of Work, associated drawings, and attachments. All work as described in these documents is included in either the Base or Optional Items. Consider all items not specifically identified in the Optional Items as part of the Base Items.
1.3 FUNCTIONAL AREAS
Refer to the attached drawings for information about the existing buildings.
1.4 SUBMITTALS
Designer of Record approval is required for submittals with a “DA” designation.
Government approval is required for submittals with a “G” or “GA” designation.
Submittals having an “FIO” designation are for Contractor Quality Control approval. Submit the following to the Contracting Officer (KO) in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Inspection Plan; G
Demolition Plan; G
SD-05 Design Data
65% Pre-Final Design; DA/GA
95% Final Design; DA/GA
100% Corrected Final Design; DA/GA
SD-06 Test Reports
Test Results and Reports; FIO
1.4.1 DESIGN SUBMITTALS
Provide a complete design package at each milestone, as described in RFP Section 01 33 16-DESIGN AFTER AWARD. The milestones for this project are indicated above
18-Mar-23 Page 4 of 38 in Section 1.4 SUBMITTALS. The specific requirements of each milestone are described in each discipline-specific section of this Specification.
Submit all documents in electronic format (.pdf for text and calculations, .pdf and .dwg (AutoCAD, latest version) for drawings). See Specification 01 33 00 SUBMITTAL PROCEDURES for additional information.
1.4.2 TEST REPORTS
Provide all test results and reports identified in this SOW to the Government as a submittal in accordance with RFP Section 01 33 00-SUBMITTAL PROCEDURES. Submittals will be considered for information only (FIO) submittals unless specifically identified as a submittal requiring government approval. Coordinate with the KO after award for the specific items to be included in the submittal register.
1.5 MATERIALS AND EQUIPMENT
Materials and products used must be durable, heavy duty, industry standard. The equipment must be the manufacturer’s standard quality and must be compatible with all other equipment and materials within the system or assembly. Equipment and materials must include all connections and accessories necessary to ensure operability and correct installation according to manufacturer’s requirements.
Provide a nameplate secured to each major piece of equipment. Each nameplate must have the manufacturer’s name, address, contact information, type or style, model or serial number, and catalog number. The definition of a “major piece of equipment” is at the discretion of the KO.
1.5.1 LIFE-SPAN
The facility and the installed equipment must be permanent construction with an expected lifespan of more than 25 years.
1.5.2 MAINTAINABILITY
Provide low maintenance materials and systems appropriate for the project climate and location.
1.5.3 OPERABILITY
Systems (including but not limited to architectural, electrical, communications, water and mechanical systems) must be simple to operate and easy to maintain.
1.5.4 STANDARDIZATION
Provide standardized materials, products, equipment, and systems to minimize the requirements for replacement parts, storage facilities, and service requirements.
1.6 DESIGN DIMENSIONS
Develop the design using the metric system.
1.7 DESIGN CRITERIA
Project design, site facilities, utility systems and material standards must be in accordance with Host Nation building codes (current versions as of the date of RFP, unless otherwise indicated). In the absence of Host Nation building codes, use the International Building Code (IBC) and the codes, technical standards, and regulations referenced in this RFP.
While this RFP references various source standards and specifications, all design documents must meet Host Nation codes and requirements. It is the designer's responsibility to demonstrate that the Host Nation standard is equal to the cited standard or specifications being supplanted. Apply the more restrictive standards when conflicts arise between the requirements of this RFP and any referenced or other applicable codes, standards, or regulations. If equivalency cannot be met, use the more stringent requirement and quote both codes verbatim in correspondence
18-Mar-23 Page 5 of 38 to the KO. The designer is responsible to determine the required material and execution standards where specific standards are not indicated.
Provide an electronic copy of the local Host Nation standards and building codes in their original language as related to facility design and construction.
1.8 SPECIAL CONSTRUCTION REQUIREMENTS
1.8.1 DEMOLITION
The Contractor is responsible for all required demolition as indicated in this scope.
Submit a Demolition Plan to be tracked via the submittal register indicating all demolition, abatement, and disposal methods.
1.8.1.1 ABATEMENT AND DISPOSAL
All demolished materials, including hazardous materials identified below, must be abated, and disposed of in accordance with local laws, codes and regulations. The Contractor is responsible for all required testing before, during and after demolitions as well as for all required compliance with safety standards.
1.8.1.2 LOCATION OF HAZARDOUS MATERIAL
The Contractor is responsible to survey the site and determine if hazardous materials exist. If hazardous materials are found to exist, immediately notify the KO and provide the results of the relevant sampling and testing. Provide the hazardous material report no later than 30 days after Notice to Proceed (NTP) for information and approval.
1.8.2 Pre-Award Site Visit
An optional Pre-Award site visit will be conducted to view on-site conditions prior to bidding. The date and time of the site visit is to be determined.
END OF SECTION
18-Mar-23 Page 6 of 38
2.0 CIVIL AND GEOTECHNICAL
Provide and perform civil engineering design and construction services as required to provide a complete, functional, and usable project. The Contractor is required to extensively coordinate civil design and construction work with the scope of the other disciplines described in this SOW.
2.1 SCOPE SUMMARY
Civil works for this project includes but is not limited to:
a. Clear and grub the entire site
b. Connect the existing facility to the existing water-well
c. Verify that the existing VIP latrines are constructed properly
d. Repair the existing walkways by patch repair and re-screeding the surface
Extensive coordination is required between the civil work and the work of other disciplines described in this SOW.
2.2 EXISTING CONDITIONS
The proposed project is in Aouinatt, Mauritania. The GPS coordinates are Latitude 16° 9'17.36"N and Longitude 9°56'44.10"W. The site is approximately 675 km to the West of Nouakchott, the capital and largest city of Mauritania. See Att. #1 – Location Map
2.2.1 TOPOGRAPHY
The existing site contains buildings, tanks, latrines, pavement, boundary wall, and vegetation as shown on the attached Conceptual Site Plan. The existing information shown on Attachment #2 - Conceptual Site Plan was compiled from as-builts dating from 2015, Google Earth, and site photos.
2.2.2 UTILITIES
There are no public utilities serviced by the municipality in this village.
The existing rainwater catchment system is not functional. Site drainage system for rainwater runoff includes a drainage ditch to the east of site and culverts under the boundary wall and walkway.
A water well is located within a few hundred meters from the site. There is an underground tank which is connected to an overhead tank through a pump on site.
The elevated tank is assumed to be connected to the plumbing system of the health facility. It is not known if the underground tank is connected to the existing water well.
There is a dry Ventilated Improved Pit (VIP) latrine facility on site which requires solid removal on a 2-to-3-year interval.
Contractor must verify all utility locations (surface and subsurface) in the field prior to the first design submittal.
2.2.3 GEOTECHNICAL
There is no geotechnical information available for the project site.
2.2.4 ENVIRONMENTAL
There are no known environmental protection areas or archeological preservation areas on the project site. There is no prior knowledge of any hazardous or contaminated materials in the site’s soil.
2.2.5 EXISTING CONDITIONS INVESTIGATION
Prior to bid, investigate the general and local conditions which can affect the work and/or its cost, including but not limited to:
a. Weather or similar physical conditions at the site.
18-Mar-23 Page 7 of 38
b. Surface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site and due diligence research of publicly available information on the site.
c. Mobilization and staging constraints.
2.3 DESIGN SUBMITTALS
Provide civil design submittals in accordance with RFP Section 01 33 16-DESIGN AFTER AWARD and in compliance with SOW Section 1.0 – GENERAL. Below are the contents required for each submittal:
65% Design Submittal:
a. Pre-Final Design Analysis of Civil features.
b. Final Existing Conditions Plan.
c. Pre-Final Site Layout, Grading, and Utility Plans – Indicate existing and proposed Civil features. Include other disciplines’ features (faded back) that affect the Civil Design (buildings, drainage patterns, latrines, etc.).
Include contours, finish floor elevations, spot grades, and slopes in the Plans. Provide Profiles, Cross Sections, and Details. Include erosion control design.
d. Pre-Final Civil Specifications.
95% Design Submittal:
Update all items from the 65% Design Submittal to 95% (Final) Design. Incorporate all 65% design comments.
100% Submittal:
The 100% Submittal provides a complete and final set of contract documents ready for construction. Update all Final submittals from 95% to a corrected Final submittal. Address all previous government review comments before submitting.
2.3.1 DESIGN ANALYSIS
Provide a Design Analysis for all Civil features that documents significant design choices and substantiates design compliance with contract requirements, applicable codes, and standards. Documentation includes narrative, calculations, photographs, sketches, and catalog cut sheets. Reference all applicable regulations, standards, and criteria for the design. Reference sources are subject to Government approval.
Provide design assumptions. For design choices, discuss alternative systems considered, and provide rationale for the selected alternative.
The Design Analysis includes but is not limited to:
a. Discussion of Site Layout constraints and design decisions, including but not limited to, land use, vehicle and pedestrian access, orientation of features on-site, setbacks from site features, minimizing utility lengths, minimizing earthwork and tree removal, and future expansion.
b. Discussion of Earthwork and Site Grading constraints and design decisions.
Provide cut and fill calculations. Include pertinent geotechnical information that affects earthwork.
c. Site Survey as an appendix.
2.3.2 DESIGN DRAWINGS
Provide Civil design drawings of sufficient detail to address the requirements of each design submittal. Civil drawings include plans, profiles, cross sections, and details of Civil features for the project. Design drawings include all necessary information (labeling, dimensioning, legend, details, notes, etc.) to allow for complete understanding and constructability of all proposed features. Provide comprehensible differentiation between features that are proposed and existing by use of appropriate choice of line styles, line weights, and/or colors. In the absence of the Host Nation’s drafting requirements, reference USACE A/E/C Graphics Standard for graphic requirements.
18-Mar-23 Page 8 of 38
2.3.3 SPECIFICATIONS
Provide Civil specifications of sufficient detail to address the requirements of each design submittal. Specifications, when combined with the design drawings, allow for complete understanding and constructability of all proposed Civil features. Specifications may be notes on the Civil design drawings as an alternative to a separate specifications document.
2.4 DESIGN CRITERIA
Provide civil design in accordance with Host Nation codes. In the absence of Host Nation codes, use the latest release of the International Building Code (IBC) and the following codes and technical standards:
a. United Nations Development Program TAG13 The Design of Ventilated Improved Pit Latrines (Att. #6)
The TAG13 standard is used to verify that the VIP latrines are constructed properly.
2.5 GEOTECHNICAL INVESTIGATION AND REPORT
Not Required
2.6 BOUNDARY AND TOPOGRAPHIC SURVEY
Provide a topographic survey from a licensed surveyor that includes all existing site information needed to design and construct the project. Include x, y, and z coordinates to the nearest 0.005 meters, dimensions, material, and basic characteristics of all features within the project site limits, as well as all features outside of the project site limits that will affect the design and construction of the project. Research record drawings to obtain utility and pavement information that is not visible from the surface. Provide notes indicating the sources and any limitations or assumptions of the data. Provide a copy of the survey in CAD, in addition to the paper/electronic requirements of the Design Analysis. Locate and show on the topographic survey the following information:
a. Property boundary, public right of way, and easements. Include the address numbers, street names, and easement records.
b. Survey monuments and benchmarks. Include description.
c. Spot elevations covering the entire survey limits showing high points, low points, grade changes, and at sufficient intervals to represent the general character of the terrain.
d. Contours in intervals of 0.2 meters.
e. Buildings and other miscellaneous structures. Provide finish floor elevation.
f. Pavements. Include pavement type and thicknesses.
g. Surface Drainage Features.
h. Boundary wall. Include height, material, direction of outrigger, gate locations and types.
i. Signs. Include sign text.
j. Trees: Locate trees over 150 millimeter diameter at chest height, and include tree species, diameter at chest height, and dripline diameter.
k. Locate environmentally sensitive areas (determined and marked by others).
l. North arrow and scale of drawing.
m. Legend depicting the symbols and abbreviations used on the drawing.
n. Horizontal and vertical coordinate systems, date of survey, licensed surveyor name and license number.
Site information provided to the Contractor by the Government is not to be considered accurate Site Survey information. Utility field locates and as-built research are the responsibility of the Contractor.
18-Mar-23 Page 9 of 38
Upon completion of construction, update the original survey with an As-built survey of the site as constructed, including underground utility locations and depths. Submit the As-built survey to the KO for approval.
In the absence of the Host Nation’s horizontal and vertical coordinate system, use the Universal Transverse Mercator (UTM) coordinate system and base vertical coordinates on sea level.
2.6.1 BOUNDARY STAKE OUT
Provide permanent survey monuments for all property corners of the project site’s boundary.
2.7 SITE LAYOUT
Locate the proposed changes and other improvements as indicated on Att. #2 – Conceptual Site Plan. Amend the site layout as determined by the site-specific constraints, code requirements, the owner’s preferences, and future expansion.
The Contractor is responsible for all aspects of the project whether they are shown on the conceptual plan or not.
2.8 DEMOLITION
Minor clearing and grubbing of the vegetation on site is required.
2.8.1 CONSTRUCTION LIMITS
Do not disturb any areas past the site’s property line. Show limits of disturbance in the drawings. Stake-out the limits of disturbance on-site with temporary fencing before beginning construction.
2.8.2 ITEMS TO REMAIN IN PLACE WITHIN CONSTRUCTION LIMITS
Take necessary precautions to avoid damage to existing items to remain in place.
Repair or replace damaged items as required by the KO.
2.8.3 TREES
Mitigate for tree removal per Host Nation requirements. The Contractor is responsible for permitting, environmental studies, and coordination with local authorities related to tree and vegetation demolition.
2.8.4 DUST, DEBRIS, AND EROSION CONTROL
Prevent the spread of dust, debris, and erosion from the project site. Install erosion control measures before beginning construction. Do not create hazardous or objectionable conditions such as, but not limited to, flooding, erosion, or pollution. Apply Host Nation regulations regarding hauling and disposal.
2.9 EARTHWORK
Perform all earth work necessary for the installation of the proposed improvements.
2.9.1 PLANS AND SPECIFICATIONS
Define earthwork requirements in the plans and specifications. Include requirements for satisfactory material, borrow material, structural fill, utility trenches, replacement and improvement of on-site soils, soil compaction (for subgrades of structures), maximum lift depths, density testing frequency, maximum temporary and permanent slopes, and engineered support systems. The earthwork requirements must not conflict with the recommendations in the Contractor-provided Geotechnical Report.
2.9.2 CONTAMINATED SOIL
18-Mar-23 Page 10 of 38
Inspect and test all soil according to Host Nation requirements. If hazardous materials are discovered, cease excavation, secure the area, and notify the KO for further guidance.
2.9.3 SATISFACTORY MATERIAL
Excavated material, if satisfactory for reuse per the Contractor’s Geotechnical Engineer, may be used on the project site where fill is required. Unsatisfactory material, and surplus excavated material not required for fill, must be disposed of offsite, and is the responsibility of the Contractor. Borrow material may be required for construction from sources off site. Borrow materials are to be free of hazardous materials and contaminants. Any soil brought in from off-site sources must be certified clean by the off-site borrow source or by on-site inspection.
2.9.4 FILL AND BACKFILL COMPACTION
In the absence of Host Nation requirements and geotechnical recommendations, fill and backfill must be placed in lifts of 20 centimeters loose thickness and compacted to a minimum 95% of the maximum dry density as determined by Host Nation test method equivalent to ASTM D-1557 (Modified Proctor test). Provide density tests on all lifts at a frequency of 1 test per 40 square meters for foundations, and 1 test per lift of subsurface structure (latrine foundations, drywell pit vault, etc.) backfill. Round up to nearest whole number (i.e., a 25 square meter foundation requires one test). The location of all tests must be selected by the Contractor’s geotechnical engineer, and copies of all test results must be furnished to the KO. All structure foundation excavations must be inspected and approved by the Contractor’s Geotechnical Engineer prior to placing concrete.
Repair earthwork areas as recommended by the Contractor’s Geotechnical Engineer and approved by the KO.
2.9.5 ENGINEERED SOIL SUPPORT SYSTEMS
Not Used
2.9.6 SITE GRADING
Verify that site grading directs storm water runoff away from buildings and structures either by drainage systems or by grading as follows:
a. Finished grades of earth/grass/gravel surfaces adjacent to buildings and structures must slope away from all exterior edges with a minimum slope of 5% for the first 2 meters.
b. Finished grades of paved surfaces adjacent to buildings and structures must slope away from all exterior edges with a minimum slope of 2% for the first 2 meters.
c. Finished grades must not create stagnating water or ponding anywhere on the project site, nor create ponding on adjacent properties.
d. Finished grades shall generally grade towards the drainage ditch west of site to eliminate ponding along site boundary.
Site grading around the building must meet Host Nation accessibility guidelines.
The Contractor must limit proposed landscape slopes to a maximum 2H:1V, which require non-erodible surface (i.e., rock, shrubs with mulch).
2.10 UTILITIES
This section applies to all project utilities located outside the building including, but not limited to, latrines. See Sections 5.0-ELECTRICAL and Section 6.0-MECHNICAL for additional utility requirements.
In the absence of Host Nation requirements, design utilities per the IBC. Provide utility materials per IBC requirements.
Coordinate all required installation, relocation, improvement, and protection of utilities held by third party (e.g., public, or private utility). This includes
18-Mar-23 Page 11 of 38 coordination of any work to be performed by the utility owner. Choice of materials and products for utility installation must be coordinated with the utility owner (customer or third party) to ensure proper integration and compliance with existing systems and allow for easy maintenance and repair of the utilities in the future.
Provide corrosion protection for utilities that provides the minimum life expectancy specified in GENERAL Section 1.0. Any piping or equipment exposed to sunlight must be coated with protective coatings suitable for UV exposure with a minimum expected coating life of 10 years before recoating.
2.10.1 STORM SYSTEM
Verify that the existing storm drainage system directs runoff away from improvements and eliminates ponding. Verify the drainage features are protected against erosion. Verify the connections from the building roof gutters and downspouts to rainwater tank. Provide system to divert first flush from the roofs that may be contaminated with dust, animal droppings and dirt so that it does enter the tank.
Test storm lines and structures for leakage and deflection per local codes.
Provide test results to the KO. Locate and repair any sections failing to pass the required tests. Repeat the specified tests and inspections on the repaired sections.
2.10.2 SANITARY SYSTEM
The contractor should verify that the existing VIP latrines are operational. Test latrine for leakage and deflection per local codes. Provide test results to the KO. Locate and repair any sections failing to pass the required tests. Repeat the specified tests and inspections on the repaired sections.
2.11 LANDSCAPING
Clear and grub site.
2.12 PAVEMENT
The contractor to verify that the existing pedestrian paving on site are functional and safe. Damaged pavement around the health facility must be repaired and the surface re-screeded.
18-Mar-23 Page 12 of 38
3.0 ARCHITECTURAL
3.1 PROJECT DESCRIPTION
Provide and perform architectural design and construction services to provide a complete, accessible, functional, and usable clinic facility.
Provide interior and exterior renovations to the single story, solid masonry / concrete clinic facility. Renovations to include, but not limited to:
a. Replacing the interior and exterior doors
b. Repairing plaster finishes throughout the facility, the latrine, and perimeter walls
c. Replacing damaged tile
d. Repairing/replacing roof drainage systems
Extensive coordination is required between the architectural work and the work of other disciplines described in this SOW.
3.1.1 DESIGN
Provide a design and construction package that uses the space allocations, functional adjacencies, design details, and features given or referenced in this RFP. The design must incorporate all referenced codes and regulations. The Contractor is responsible for creating additional details as required to complete a full design. All details must conform to the requirements of this RFP and are subject to the approval of the KO. A previous set of construction drawings has been attached for reference. The Contractor is responsible for providing a design that meets all requirements of the User and the codes and criteria referenced in this Statement or Work.
3.1.2 DESIGN SUBMITTALS
Provide all architectural submittals after contract award in accordance with RFP Section 01 33 16-DESIGN AFTER AWARD and 01 33 00-SUBMITTAL PROCEDURES. Prepare and submit the documents listed below at the submittals indicated.
3.1.2.2 65% DESIGN SUBMISSION
Include the following drawings and reports as applicable to the project:
a. Code Summary – Provide a tabular code compliance summary indicating Host Nation and/or IBC life safety requirements for all new facilities.
b. Life Safety Plans – Provide plans depicting smoke/fire resistance ratings, egress routes, dead-end corridors, exits, and other aspects of life safety pertaining to the design.
c. Floor Plans – Provide all floor plans, indicating room names, areas, and basic dimensions, scale 1:50.
d. Ceiling Plans – Provide reflected ceiling plans for all rooms, indicating ceiling materials and fixtures, scale 1:50.
e. Building Elevations – Provide all building elevations indicating all exterior materials.
f. Roof Plan – Provide a plan of all roof areas, indicating direction of slope and method of drainage.
g. Building Section – Indicate heights of critical building elements.
h. Wall Section - Provide a typical interior and exterior wall section for each building – describe wall materials.
i. Pre-Final Design Analysis – Provide a narrative explaining the design and indicating how the design and materials meet the requirements of this SOW.
j. Pre-Final Specifications – Provide detailed explanations of requirements for all performed work or provide product specific manufacturer information (brochures, technical information, cut sheets) for all materials and products to be provided/installed.
3.1.2.3 95% DESIGN SUBMISSION
The 95% Submittal provides a complete and final set of contract documents
18-Mar-23 Page 13 of 38 essentially ready for construction by the D/B Contractor. All previous government review comments must have been addressed. Include the following drawings and reports as applicable to the project:
a. All documents from the 65% submittal updated to incorporate 65% review comments.
b. Floor Plans – Provide all floor plans, indicating room names, areas, and dimensions, scale 1:50.
c. Building Elevations – Provide all building elevations indicating all exterior materials.
d. Roof Plan – Provide a plan of all roof areas, indicating direction of slope and method of drainage.
e. Building Section – Indicate heights.
f. Wall Sections – Provide sufficient wall section(s) to indicate all materials and different conditions.
g. Section and Plan Details – Provide details of critical building intersections.
h. Door Schedule – Provide a schedule of all windows and doors, indicating sizes, hardware, and operation.
i. Finish Schedule – Indicate all proposed finishes.
j. Final Design Analysis – Provide a finalized narrative describing all work to be performed on the project and how it meets the functional and code requirements of the project. Provide product specific manufacturer information (brochures, technical information, cut sheets) for all materials and products to be provided/installed.
k. Final Specifications – Provide line items and detailed descriptions of all work to be performed.
3.1.2.4 100% DESIGN SUBMISSION
The 100% Submittal provides a complete and final set of contract documents ready for construction by the D/B Contractor. All previous government review comments must have been addressed. Include all drawings, specifications, and calculations from the 95% Submittal updated to incorporate all previous review comments.
3.2 TECHNICAL CRITERIA AND STANDARDS
Design and construct the project in accordance with the requirements outlined in Section 1.7 DESIGN CRITERIA.
3.2.1 LIFE SAFETY REQUIREMENTS
The Design must meet all Host Nation and local Fire Suppression System codes and requirements. All new structures must have exits and means of egress that comply with current Host Nation codes and standards. In the absence of Host Nation codes and standards, for individual concerns of Life Safety the Contractor must follow the International Building Code (IBC).
3.2.2 HANDICAPPED ACCESSIBILITY REQUIREMENTS
All facilities must meet applicable Host Nation handicapped accessibility requirements.
3.3 GENERAL SCOPE OF WORK
Design the architectural elements of this facility to withstand all site-specific environmental conditions such as wide seasonal temperature swings, local wind, rain, snow, and earthquake conditions. All architectural features must be appropriately braced for anticipated seismic activity. The Contractor may propose alternate building materials to meet the facility’s requirements, but final selection of materials is subject to the approval of the KO. Consider economics not only in the initial acquisition, but also in the future maintenance of the materials, when selecting materials and building systems to be incorporated into the project. When requested, the Contractor must provide documentation demonstrating that a chosen alternative material is life cycle cost effective.
18-Mar-23 Page 14 of 38
3.4 DETAILED SCOPE OF WORK
The Contractor is responsible for the following specific tasks required for the construction of this facility.
3.4.1 DEMOLITION
Demolition work includes, but is not limited to, the following items:
a. Demolish and remove existing exterior entrance door,
b. Demolish and remove existing interior doors, and
c. Demolish and remove broken tiles from the facility.
3.4.2 BUILDING SYSTEM AND MATERIALS
The intent of this RFP is to allow the Contractor the maximum flexibility to design and construct this facility in an economical manner without sacrificing good engineering practices, quality materials and systems. The Government requires low or no maintenance finish materials to the greatest extent possible. Provide a design informed by the modular size of selected materials. Building materials as described herein are minimum requirements and may require revision based on code compliance and criteria.
3.4.2.1 FIRE PROTECTION RATINGS OF INTERIOR FINISHES
All interior finishes must conform to Host Nation fire protection standards/requirements or equivalent US standards/requirements.
3.4.2.2 ACOUSTICAL DESIGN
New doors must meet the minimum sound protection per Host Nation requirements.
3.4.2.3 CORROSION PREVENTION
All exterior materials and finishes must be appropriate for continuous exterior exposure. All materials susceptible to UV degradation must contain UV inhibitors.
Provide corrosion resistant coatings on all materials susceptible to corrosion.
Coatings must be applied in the factory prior to delivery to the maximum extent practicable. Physically separate dissimilar metals with non-conductive hardware.
Do not install aluminum in direct contact with concrete. Treat all wood with preservatives where it is contact with concrete or exposed to the exterior. Cover all exterior wood with metal flashing or exterior grade paint. Do not install wood in contact with soil.
3.4.3 EXTERIOR CONSTRUCTION WORK
Provide the following exterior architectural systems.
3.4.3.1 EXTERIOR WALLS
Patch and repair exterior walls of the facility and latrine and perimeter walls in accordance with (IAW) the requirements of this SOW. Exterior walls must have smoke/fire resistance ratings as required by Host Nation, and local fire and life safety codes. Provide exterior wall finishes appropriate for the wall structure as required below.
3.4.3.1.1 EXTERIOR WALL PLASTER
Provide new exterior cementitious plaster and paint on all concrete and masonry surfaces at the interior and exterior of the facility and latrine and perimeter walls. Assume 10% of the exterior walls will require repairs for bidding purposes.
Steel trowel to a smooth surface. Paint with one coat of approved alkali resistant undercoat paint and two coats of super acrylic finish. Paint must be lead free, suitable for exterior applications, washable when dry. Submit a color sample of the paint along with the manufacturer's catalog data including application instructions and product data for KO's acceptance.
18-Mar-23 Page 15 of 38
3.4.3.2 EXTERIOR DOORS
Provide new exterior doors in accordance with the functional requirements of this facility.
3.4.3.2.1 EXTERIOR DOORS
Provide new, locally constructed metal single-leaf doors and frames with mortised lockset. The new main entrance door must contain a half lite. Exterior glass must be finished with reflective coating to reduce solar heat gain. Reinforce flat metal sheets to prevent oil-canning. All door frames must be mounted flush with the surrounding walls and seams must be sealed. Provide standard door 45mm thickness. All metal must be covered with a suitable rust-inhibitive primer and then be painted with a glossy protective coating. Coordinate key system with the KO and end user.
Each door must have the following hardware as a minimum:
a. Three hinges on each leaf;
b. Lever latch handles;
c. Fully mortised lockset;
d. Top and bottom sliding bolts on the exterior of door to secure inactive door leaf in the closed position; and
e. Physical locking mechanism on the exterior of door.
3.4.3.3 ROOFING
Roof design and materials must comply with Host Nation requirements.
3.4.3.3.1 ROOF CONSTRUCTION AND ROOF COVERING
Provide new screed roof surface to provide proper roof slope for water drainage to the rainwater collection system. Submit material and color samples for approval by the KO. Patch and repair damaged areas of the parapet as required.
3.4.3.3.2 ROOF GUTTERS, DOWNSPOUTS AND FLASHING
Replace the roof drainage system. Replace/repair gutter and downspout supports and anchorage as required. Existing supports and anchorage must support the roof drainage system at full capacity. Provide new pre-finished galvanized steel roof gutters, downspouts, and flashing. PVC gutters and downspouts are not acceptable.
Size gutters and downspouts for roof drainage area and 10-year storm rainfall intensity. Assume 100% of the roof drainage system will require replacement for bidding purposes. Submit gutter and downspout sizing calculations in the Design Analysis. Coordinate storm drainage connections with the requirements of Section
2.0 CIVIL AND GEOTECHNICAL. Submit material and color samples for approval by the
KO.
3.4.3.3.3 CONCRETE ROOF SEALER
Provide low VOC, clear epoxy concrete sealer on all roof surfaces. Concrete sealer must be appropriate for high-traffic areas and have high oil and chemical resistance. Apply epoxy concrete sealer in accordance with manufacturer instructions. Test concrete for appropriate moisture content prior to application.
3.4.3.4 EXTERIOR METAL
All new exterior metal must be finished with an architectural coating. Provide exterior metal elements with a factory applied finish to the greatest extent practicable. For all new metal elements that have not been provided with a factory applied finish, are showing evidence of corrosion, or have failing coatings, clean and paint the metal in the field. Scrape and clean all surfaces to remove rust and dirt before painting. Paint system must be one coat of rust inhibitive primer and two coats of an alkyd-base finish paint. Submit paint samples and colors for review and approval by the KO.
18-Mar-23 Page 16 of 38
3.4.4 INTERIOR CONSTRUCTION WORK
Provide the following interior architectural systems.
3.4.4.1 INTERIOR WALL FINISHES
Provide new interior wall finishes as described below. Submit data sheets, color, and pattern of all wall finishes for review and approval by the KO.
3.4.4.1.1 INTERIOR WALL PLASTER AND PAINT
Patch and repair the interior wall finishes throughout the facility. Provide new cementitious plaster and paint on all concrete and masonry surfaces. Steel trowel to a smooth surface. Paint with one coat of approved alkyd resistant undercoat paint and two coats of super acrylic finish. Paint must be lead free, suitable for exterior applications, and washable when dry. Submit paint samples and colors for review and approval by the KO.
3.4.4.1.2 CERAMIC WALL TILE
Provide glazed ceramic wall tiles from floor to ceiling in the toilet room and delivery room. New wall tile to match existing floor tile. Protect all walls in toilet room with elastomeric waterproofing membrane half meter high above floors.
Provide ceramic wall tiles on windowsills in all rooms to receive ceramic wall tiles. Install tiles according to manufacturer’s instructions with appropriate grout-filled joints. Submit tile samples and colors for review and approval by the
KO.
3.4.4.2 CEILINGS
Provide new ceilings as described below. Submit data sheets, color, and pattern of all ceiling finishes for review and approval by the KO.
3.4.4.2.1 INTERIOR CEILING PLASTER AND PAINT
Patch and repair the interior ceiling finishes throughout the facility. Provide new cementitious plaster and paint on all concrete and masonry surfaces. Steel trowel to a smooth surface. Paint with one coat of approved alkyd resistant undercoat paint and two coats of super acrylic finish. Paint must be lead free, suitable for exterior applications, and washable when dry. Submit paint samples and colors for review and approval by the KO.
3.4.4.3 FLOOR FINISHES
Provide new interior floor finishes as described below. Submit data sheets, color, and pattern of all floor finishes for review and approval by the KO.
3.4.4.3.1 CERAMIC TILE FLOORING
Replace any existing damaged floor tiles. The finish of new ceramic floor tile to match existing type. Provide new non-slip ceramic tile flooring to match existing.
Protect ceramic tile flooring in wet rooms/areas with elastomeric waterproofing membrane on the concrete slabs and turn up half meter high above floor. Tiles in wet rooms/areas must have a minimum slip resistance of Group B/R11. New tiles must be sized to match existing floor tiles. Fill joints with water resistive grout. Do NOT fill joints between wall and floor with grout, but with permanent elastic silicone. Color of grout and silicone must match. Ceramic tile flooring must match ceramic wall tile. Install proofing layer suited for the application. Install ceramic tile baseboards in all rooms that receive ceramic tile flooring but not ceramic wall tile.
3.4.4.3.2 CONCRETE FLOOR SEALER
Provide low VOC, clear epoxy concrete sealer on all exposed concrete floors.
Concrete sealer must be appropriate for high-traffic areas and have high oil and chemical resistance. Apply epoxy concrete sealer in accordance with manufacturer instructions. Test concrete for appropriate moisture content prior to application.
18-Mar-23 Page 17 of 38
3.4.4.4 INTERIOR DOORS
Provide new, locally constructed metal single-leaf doors and frames with mortised lockset. Reinforce flat metal sheets to prevent oil-canning. All door frames must be mounted flush with the surrounding walls and seams must be sealed. Provide standard door 45mm thickness. Provide moisture resistant doors and door frames for the toilet room. All metal must be covered with a suitable rust-inhibitive primer and then be painted with a glossy protective coating. Submit color for review and approval by the KO.
Each door must have the following hardware as a minimum:
a. Three hinges on each leaf;
b. Lever latch handles;
c. Fully mortised lockset; and
d. All doors must have a mortise lockset. All locksets must be keyed separately.
3.4.4.5 INTERIOR WINDOW ACCESSORIES
Provide the following accessories on all windows.
3.4.4.5.1 WINDOW COVERINGS
Provide a surface mounted curtain rod over all windows. Curtain rod must be steel or aluminum and be adequately sized to span the window without sagging once curtains have been installed.
3.4.4.6 BATHROOM AND TOILET ACCESSORIES
Provide bathroom and toilet accessories as described below. All bathroom and toilet accessories must be made from corrosion resistant materials and have corrosion resistant, concealed fasteners. All bathroom and toilet accessories made from the same material must be finished to match. For toilet and plumbing fixtures, see Section 6.0 MECHANICAL. Submit data sheets and color/finish for all bathroom and toilet accessories for review and approval by the KO.
3.4.4.6.1 TOILET ROOM MIRRORS
Provide mirrors of 6 mm minimum thickness over each sink. Size must be approximately 450 x 800 mm (width x height). Securely fasten mirrors to the wall using mechanical fasteners through a steel frame. Do not hang or hook mirrors.
3.4.4.6.2 TOILET TISSUE DISPENSER
Provide one, two-roll metal toilet tissue dispenser at each toilet. Toilet tissue dispenser must be surface mounted with horizontal dispensing.
3.4.4.6.3 TOWEL BAR
Provide one surface mounted metal towel bar near the sink in the toilet room.
Towel bar must be sized to fit two hand towels.
3.4.4.6.4 GARMENT HOOKS
Provide heavy duty, commercial grade, stainless steel double-hooks. Unless indicated otherwise, mount garment hooks on the inside of each toilet cubicle door at a minimum.
3.4.4.7 BUILT-IN FURNISHINGS
Provide the following built-in furnishings. Provide samples of all materials and colors to KO for approval.
3.4.4.7.1 BUILT-IN STORAGE CABINETS
Provide new built-in storage cabinets in the pharmacy room, consultation room, delivery room and pre-delivery room, and treatment room. Provide base cabinets of solid wood and constructed from locally produced materials. Storage cabinets must
18-Mar-23 Page 18 of 38 be a minimum of 2000 mm tall and have two horizontal shelves, spaced to create three equally sized compartments. Shelves in new built-in storage cabinets must have minimum dimensions of 1600 mm wide and 450 mm deep. Shelving must support a minimum load of 45 kilograms. Provide locally produced double doors, sized to span the full width and height of the storage cabinet. Doors must match exterior doors in materials, construction, and hardware. All doors must be keyed separately.
Provide a minimum of two keys for each door.
3.4.4.7.2 COUNTERTOPS
Provide countertops constructed from solid wood countertops shall be fabricated with locally produced materials. Countertops must be minimum 40mm thick. Provide minimum 100 mm x 15 mm back and side splashes on all countertops adjacent to walls. Countertops must have a 20 mm overhang. Coordinate openings in countertops for sinks, refer to Section 6.0 MECHANICAL. Coordinate height of base cabinetry with thickness of countertops to provide 900 mm finished height at countertop.
3.4.4.7.3 UPPER CABINETS
Provide upper cabinets to match base cabinets. Provide upper cabinets of solid wood and constructed from locally produced materials. Provide double-door upper cabinets with opposing doors. Upper cabinets must be as wide as base cabinets.
Upper cabinets must be minimum 800 mm tall and mounted to provide a minimum 455 mm clearance above counter. All hardware on upper cabinets must match base cabinets.
Provide each upper cabinet with two adjustable shelves. Anchor upper cabinets to walls.
3.4.4.8 MISCELLANEOUS ACCESSORIES
Provide the following miscellaneous accessories in sizes and quantities as described below. Ensure all mounting surfaces have the appropriate structure for the weight and expected use of each accessory.
3.4.4.8.1 INCINERATOR
Repair/replace the existing incinerator on site. Repair/replace the ash door and chimney as required. The incinerator must be fully functional upon completion of work.
3.4.4.8.1 JUNCTION BOX COVER
Replace the existing plastic junction box cover with a steel cover. Repair areas around the junction box and ensure that the replacement cover is seated flush with adjacent concrete. The junction box must be fully functional upon completion of work.
3.4.4.8.2 EXPOSED PIPES
Paint all exposed ferrous piping. Paint system must be one coat of rust inhibitive primer and two coats of finish for all pipes that are not painted. Pipes that are already painted must be cleaned and painted with adequate coats to provide uniformity with newly painted surfaces. Finish coat paint must be an alkyd base paint. Submit data sheets and colors for all paints review and approval by the KO.
3.4.5 SIGNAGE
Provide all signage in accordance with Host Nation standards.
3.4.5.1 EXTERIOR SIGNAGE
Provide exterior signage as described below. Construct all exterior signs from corrosion resistant materials appropriate for continuous exposure to the elements.
3.4.5.1.1 EXTERIOR DEDICATION PLAQUE
Provide a dedication plaque approximately 600 mm wide x 450 mm high fabricated from powder coated aluminum with permanent printed 18 mm high, “Arial“ font letters as indicated below. Adhesive applied images or text are not acceptable.
18-Mar-23 Page 19 of 38
Provide the emblem of the Africa Command between two flag emblems, one flag of the United States of America and one of the Republic of Mauritania. Plaque location and mounting height to be directed by the KO.
The exterior dedication plaque must have text similar to the following in both English and the Host Nation language: “The Construction of Aouintt Health Clinic was accomplished as a partnership between the people of the United States of America and the people of the Republic of Mauritania, with support from the United States Africa Command and the Office of Security Cooperation, U.S. Embassy Mauritania.” Provide the year of project completion below the text. Coordinate the final dedication plaque verbiage and graphics with the KO prior to procuring the sign. See attached dedication plaque template for reference.
18-Mar-23 Page 20 of 38
4.0 STRUCTURAL
4.1 GENERAL
The Contractor must provide and perform structural engineering design and construction services as required to provide a complete, accessible, functional, and usable project.
The primary structural effort of this project includes
a. Minor structural repairs to include patch work, crack repair, concrete thin-surface repairs, and misc. equipment anchorage.
b. PV frame assembly
c. Remove excess reinforcement bars which protrude from the roof slab flush with slab and coat ends of bars with a rust inhibiting compound.
d. Other items as required for a complete and usable system
The Contractor must have as part of his design team a licensed structural engineer per Host Nations standards. If work is being performed in a country that does not have licensed structural engineers, then engineering degrees along with extensive structural design experience…