SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

01/21

PART 1 GENERAL

PAYMENT TYPES

The costs for performance of any work required by the contract which is not associated with a specific base or option item description shall be included in the first base item (Base Item 0001).

Single Job Payment Items

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

SCHEDULE OF ITEMS: BASE ITEMS

Base Item 0001: Health Clinic Renovation

Unit of Measure: Job.

Payment will be made for costs associated with the design and renovation of the existing health clinic facility as indicated in SECTION 01 10 10, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Base Item 0002: Photovoltaic Power System

Payment will be made for costs associated with the design and construction of a photovoltaic power system as indicated in SECTION 01 10 10, with the exceptions of the bid options listed. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Base Item 0003: Site Work

Payment will be made for costs associated with the work required to improve the overall conditions of the site, inclusive of the removal of rainwater catchment system, clearing of grub and vegetation, walkway repairs, as indicated in SECTION 01 10 10, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Option 1: Item 0004: Refrigerator

Payment will be made for costs associated with the supply and installation of a refrigerator as indicated in SECTION 01 10 10, with the exceptions of the bid options listed. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Option 2: Item 0005: Split AC-Unit and Hot-Water Boiler

Payment will be made for costs associated with the supply and installation of a split AC-unit and hot-water boiler as indicated in SECTION 01 10 10, with the exceptions of the bid options listed. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Option 3: Item 0006: Plumbing Replacement

Payment will be made for costs associated with the supply and replacement of the embedded piping within the clinic as indicated in SECTION 01 10 10, with the exceptions of the bid options listed. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section - V7 Aug 2020 SECTION 01 22 00 Page 3