This solicitation seeks construction services for shoreline stabilization and jetty repair projects at Harlan County Lake in Nebraska. The scope of work includes shoreline protection through installation of erosion control materials like riprap, grading, and seeding. It also involves rehabilitating jetties by replacing displaced riprap and crushed rock. The period of performance is 120 calendar days from notice to proceed. The solicitation includes line items for work areas at Methodist Cove, Gremlin Cove, and Cedar Point, with options for Hunter Cove and Patterson Harbor. Bids are due by September 21, 2020 and the award will be firm-fixed-price. The Army Corps of Engineers district office in Kansas City is the contracting agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT: HARLAN COUNTY LAKE PROJECT SHORELINE AND JETTY REPAIR
The U.S. Army Corps of Engineers, Kansas Ciy District, intends to issue an invitation for bid (IFB) for Construction Activities for Shoreline and Jetty repair due to damages sustained during the 2019 f lood events. The w ork covered by this contract consist of furnishing all equipment, labor, operators, supervisors/site superintendent, quality control, supplies, materials, and incidentals necessary to safisfactorily perform and provide construction to potentially include but not limited to earthw ork operations, bringing in f ill and borrow material from a pre-determined site, haul roda development, clearing of debris asnecessary, erosion repair, rutting repair, levee surfacing, various stone surfacing/placement, installation of stone armored protection, installation and rehabilitaton of drainage structure and associated apertures, and establishment of turf for repairs of compromised landsid, riverside, and crow n levee sections.
X
SHEILA D NIMROD 816-389-2252
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
20-Aug-2020
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________120 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 Sep 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
816-389-2029/2030FAX:TEL: 816-389-3812 TEL: FAX:
W912DQ20B1080 80
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Shoreline Protection and Jetty Rehabilitation Harlan County Lake Project
01 11 00-3
Section 00 01 05 - Certification Page
CAUTION PAGE
CAUTION!
Notice: Several changes have been made as a result of the COVID-19 virus and its impacts on the normal course of business regarding the invitation for bid (IFB) and the bid submission process. Those changes are reflected with “red letter” font
BEFORE SIGNING AND EMAILING YOUR BID, please take note of the following, as failure to perform any one of these actions may cause your bid to be rejected.
1. AMENDMENTS: Have you acknowledged receipt of ALL Amendments? If in doubt as to number of amendments issued, please contact our office.
2. AMENDED IFB PAGES: If Amendments are issued and as a result, a form or page included in the IFB is changed those changed forms or pages must be used in submitting your bid.
3. EMAILED BIDS: INCLUDE A BID COVERSHEET WITH THE EMAILED BID. The Coversheet will show the Contractor name and address, the solicitation number, title of project, amendments received, and the date and time proposals are due. Mail in bids will not be accepted.
4. MISTAKES IN BIDS: Have you reviewed your bid prices for possible errors in calculations or work left out?
5. FACSIMILE BIDS AND MODIFICATIONS: Will not be considered. Facsimile withdrawals will not be considered.
6. SUPPLEMENTAL BID SCHEDULE: In addition to the Contract Line Item Schedule, contractors should complete the Supplemental Bid Schedules provided. The Supplemental Bid Schedules are not contractually binding. The Government will use the Supplemental Bid Schedules to assist in the evaluation of prices. The individual supplemental bid schedule items should add up to the prices for the Contract Line Item Schedule. In the event that the CLIN subtotal in a Supplemental Bid Schedule does not match the CLIN total in the Contract Line Item Schedule, the Contract Line Item Schedule will be the price evaluated by the Government.
7. BID GUARANTEE: Sufficient bid guarantee in proper form must be furnished with your proposal, if your proposals exceeds $150,000.
01 11 00-4
8. BUY AMERICAN ACT: All are cautioned that, prior Government conduct notwithstanding, the Contractor's selection of a domestic construction material which would require the subsequent selection of a foreign construction material for compatibility is not a justification for waiver of the Buy American Act. It is the Contractor's responsibility to verify, prior to submitting the materials for approval that each system can be built to meet the contract specifications without the use of foreign construction materials.
9. SYSTEM FOR AWARD MANAGEMENT (SAM): In accordance with FAR 52.204-7: By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to submitting a bid, prior to award, during performance and through final payment of any contract/task order resulting from this solicitation.
If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered bidder. Bidders may obtain information on registration and annual confirmation requirements via the SAM database accessed through https://www.sam.gov/SAM/pages/public/loginFAQ.jsf It is highly encouraged that all prospective BIDDERS start the SAM’s registration process as soon as possible.
SAM.GOV REGISTRATION IS FREE OF CHARGE
OFFEROR MUST HAVE AN ACTIVE REGISTRATION IN SAM AT THE TIME OF
BID SUBMISSION OR THE CONTRACTING OFFICER MAY PROCEED WITH
AWARD TO THE NEXT SUCCESSFUL CONTRACTOR.
If you have questions about Government procurements in general or need assistance in the preparation of your proposal, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to https://www.aptac-us.org/contracting-assistance/
THIS A FREE SERVICE BY A NON PROFIT PAID FOR BY THE US GOVERNMENT
https://www.sam.gov/SAM/pages/public/loginFAQ.jsf https://www.aptac-us.org/contracting-assistance/
01 11 00-5
Section 00 01 10 - Table of Contents
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Statement of Work 12 12-AUG-2020 Attachment 2 Exhibits 9 13-AUG-2020
01 11 00-6
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Shoreline Stabilization
FFP
and Jetty Repair
Harlan County Lake Areas:
Gremlin Cove Contractor shall provide all labor, equipment, material, and personnel necessary to successfully complete the work in accordance with the incorporated statement of work (SOW) dated 23 June 2020 FOB: Destination
PSC CD: Z2KB
NET AMT
0002 1 Job Shoreline Stabilization
FFP
and Jetty Repair
Harlan County Lake Areas:
Methodist Cove Campground Contractor shall provide all labor, equipment, material, and personnel necessary to successfully complete the work in accordance with the incorporated statement of work (SOW) dated 23 June 2020.
01 11 00-7
0003 1 Job Shoreline Stabilization
FFP
and Jetty Repair
Harlan County Lake Areas:
Cedar Point Contractor shall provide all labor, equipment, material, and personnel necessary to successfully complete the work in accordance with the incorporated statement of work (SOW) dated 23 June 2020.
0004 1 Job OPTION Shoreline Stabilization
FFP
and Jetty Repair
Harlan County Lake Areas:
Hunter Cove Contractor shall provide all labor, equipment, material, and personnel necessary to successfully complete the work in accordance with the incorporated statement of work (SOW) dated 23 June 2020.
01 11 00-8
0005 1 Job OPTION Shoreline Stabilization
FFP
and Jetty Repair
Harlan County Lake Areas:
Patterson Harbor Jetty Contractor shall provide all labor, equipment, material, and personnel necessary to successfully complete the work in accordance with the incorporated statement of work (SOW) dated 23 June 2020.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 120 dys. ANP 1 HARLAN COUNTY PROJECT OFC
TOM ZIKMUND
70788 CORP ROAD A
REPUBLICAN CITY NE 68971-9742
816-389-3496
966505
0002 120 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0003 120 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0004 120 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0005 120 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY FULL TEXT
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
01 11 00-9
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision)
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
SEE INCLUDED SPECIFICATIONS AND DRAWINGS
(End of clause)
SCR_CT_001 FIELD OFFICE OVERHEAD (JUL 2002)
NOTICE TO BIDDERS: For your bid to be responsive, you must declare below the single accounting practice that you apply to contracts to calculate field office overhead for all change orders, modifications and requests for equitable adjustment. Pursuant to Federal Acquisition Regulations (FAR) Parts 31.105(d)(3) and 31.203(d)(1), an accounting practice that varies from modification to modification is not allowable. Select one of the following:
1. TIME DISTRIBUTION BASE FOR A PER DIEM RATE
If you use this practice, see Special Clause “Field Office Overhead Per Diem Rate” _____
01 11 00-10
2. DIRECT COST DISTRIBUTION BASE FOR A PERCENTAGE MARKUP
If you use this practice, see Special Clause “Field Office Overhead Percentage Markup” _____
3. OTHER ACCOUNTING PRACTICE THAT IS ALLOWABLE _____
UNDER THE FAR AND THAT USES A SINGLE DISTRIBUTION BASE.
If you choose 3, you must describe the accounting practice in sufficient detail below to allow the contracting officer to determine what accounting practice is being utilized by your company and that it complies with the FAR.
FAILURE TO FULLY COMPLY WITH THE ABOVE REQUIREMENT OR, IF ALTERNATIVE 3 IS
DECLARED AND YOUR DESCRIPTION DOES NOT CLEARLY STATE OR DESCRIBE A CONSISTENT
ACCOUNTING PRACTICE USING A SINGLE DISTRIBUTION BASE, WILL BE CAUSE FOR YOUR BID
TO BE REJECTED AS NON-RESPONSIVE.
(End)
SCR_CT_007 MAGNITUDE OF PROJECT—CONSTRUCTION (Jul 2002)
The magnitude of this project is represented by the following estimated price range (contracting officer mark as appropriate):
_____Less than $25,000
_____Between $25,000 and $100,000
_____Between $100,000 and $250,000
_____Between $250,000 and $500,000
_XX_Between $500,000 and $1,000,000
_____Between $1,000,000 and $5,000,000
_____Between $5,000,000 and $10,000,000
_____Between $10,000,000 and $25,000,000
_____Between $25,000,000 and $100,000,000
_____Between $100,000,000 and $250,000,000
_____Between $250,000,000 and $500,000,000
_____Over $500,000,000
01 11 00-11
(End)
TPL_NWK_001 Points of Contact
CONTRACT
SPECIALIST:
Sheila Nimrod PHONE: (816) 389-2252 E-MAIL: Sheila.d.nimrod@usace.army.mil
PROJECT
MANAGER:
Thomas Zikmund
PHONE:
816) 389-3496
E-MAIL:
Thomas.J.Zikmund@usace.army.mil
STATEMENT OF WORK 6 AUGUST 202
SECTION 01 11 00
DESCRIPTION OF WORK AND GENERAL
REQUIREMENTS
REVISION 23 JUNE 2020
1. GENERAL:
1.1 Existing Conditions
In 2019, the lake experienced higher than average lake levels, which caused damages to the shorelines at multiple recreational areas around the lake. In addition to the shoreline repair, several public access walkways, which are located on top of rock jetties were also damaged.
1.2 Description of Work
The Contractor shall complete the repair of both the shoreline protection, rock jetties and associated work. The Contractor shall provide all site preparation, materials (unless otherwise noted as supplied by Government), equipment, and labor necessary to meet the requirements of the scope of work.
1.3 Location: Harlan County Reservoir
U.S. Army Corps of Engineers 70788 Corp Rd A, Republican City, NE 68971
1.4 Points of Contact: Lawrence Janicek
Lawrence.D.Janicek@usace.army.mil 816-389-3943
Thomas Zikmund Thomas.J.Zikmund@usace.army.mil 816-389-3496
1.5 Work Hours
mailto:Lawrence.D.Janicek@usace.army.mil mailto:Thomas.J.Zikmund@usace.army.mil
01 11 00-12
The standard workday is 7:30am to 4:30pm Monday thru Friday, excluding Federal holidays. Work hours may be adjusted with approval of Contracting Officer Representative (COR) or Operations Project Manager.
1.6 Plans and Documentation
1.6.1 Contractor Daily Written and Photographic Documentation
Contractor shall submit daily logs of work conducted. Contractor may use own form for documentation.
Photos of all phases of the project are required and shall be submitted to Tom Zikmund in .jpeg formatting upon job completion. Each photo shall have a time date stamp. It is recommended that daily logs are submitted on a daily basis.
1.6.2 Contractor may use own form for documentation.
The following information must be included:
Date Equipment Used Total hours worked that day
01 11 00-13
Contractor Name Precipitation Controversial Matters Weather description Methods Used Miscellaneous Remarks Air temperature Work completed that day Size of crew
1.7 Site Visit/Project Photos
Problems encountered
Contractors are encouraged to schedule a site visit prior to bidding on this contract. Tom Zikmund (816-389-3496) can be contacted to schedule a site visit. Existing site pictures, installation pictures, and installation diagrams are included in attached drawing section.
Dra. 1 – Typical Cross Section Dra. 2 - Typical Overhead Pic. M1 – Methodist Cove Area Pic. H1- Hunter Cove Area Pic. G1 – Gremlin Cove Area Pic. C1 – Cedar Point Area Pic. P1 – Patterson Cove Area
1.8 Occupancy of Premise
Before work is started, it is the contractor’s responsibility to arrange with COR a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors and stairways.
1.9 Construction Process Plan
Construction Plan shall include all of the following:
1.9.1 A plan clearly indicating areas of work and description of the work to be completed.
Description of work must include processes for demolition, excavation, backfill and final grading.
1.9.2 A time line/schedule of the construction from start to completion.
1.9.3 The construction process plan shall be submitted for approval prior to work being started.
1.10 Submittals
Once submittals are received the government has 10 working days for review and acceptance.
1.10.1 Preconstruction Submittals
1.10.1.1 Construction Process Plan
1.10.1.2 Material, Delivery, Storage and Placement Plan
1.10.1.3 Disposal of Demolition Materials Plan
1.10.1.4 Quality Control Plan
1.10.1.5 Daily Log Format
1.10.1.6 Project Schedule
1.10.2 Closeout Submittals
01 11 00-14
1.10.2.1 Daily Reports
1.10.2.2 Photographic Documentation
1.10.3 All submittals (one copy of each) shall be sent electronically or hard copy to the following:
Primary Contact:
U.S. Army Corps of Engineers Harlan County Lake Attn: Lawrence Janicek .
70788 Corp Rd A, Republican City, NE 68971 Phone: 816- 389-3493
Alternate Contact:
U.S. Army Corps of Engineers Harlan County Lake Attn:
Thomas Zikmund 70788 Corp Rd A, Republican City, NE Phone: 816-389-3496
Email:Lawrence.D.Janicek@usace.army.mil Email: Thomans.J.Zikmund@usace.army.mil
1.11 Period of Performance
Work shall be begin immediately upon Notice to Proceed and, weather permitting, shall have a period of performance (POP) of 120 calendar days. Contractor shall coordinate scheduling (minimum of five working days’ notice prior to mobilizing) and the construction sequence with project personnel to minimize interference and allow for planning/coordination by project staff.
1.12 Measurements and Quantities
The Contractor shall verify all measurements at the project site and shall be responsible for all dimensions, fittings, and the proper installation of all materials and equipment specified.
1.13 Permits
The Contractor shall be responsible for obtaining any required permit.
1.13.1 Hot Work Permit
The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by terms of this contract.
1.14 Safety Requirements
1.14.1 Protection from Hazards
During progress of work, the Contractor shall protect all personnel, whether Government or civilian, from any and all safety hazards caused by the construction operations.
1.14.2 Traffic Control
Contractor shall provide all temporary signs and markers as necessary to maintain safety in the worksite. All signs shall conform to the latest edition of the Manual of Uniform Control Devices (MUTCD).
mailto:Thomans.J.Zikmund@usace.army.mil
01 11 00-15
1.14.3 U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL, EM 385-1-1 (2014)
EM 385-1-1 and its changes are available at http://www.hq.usace.army.mil (at the HQ homepage, select Safety and Occupational Health). Select the appropriate manual. The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
2014 Version: http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_3 85-1- 1.pdf
1.14.3.1 Accident Prevention Plan
Contractor shall prepare a site-specific Accident Prevention Plan (APP). Prepare the APP in accordance with the format and requirements of USACE EM 385-1-1. Cover all paragraph and subparagraph elements in USACE EM 385-1-1, Appendix A, "Minimum Basic Outline for Accident Prevention Plan". The APP shall be job-specific and address any unusual or unique aspects of the project or activity for which it is written.
1.14.3.2 Activity Hazard Analysis
An Activity Hazard Analysis must be provided prior to breaking ground. The Activity Hazard Analysis must address all foreseeable safety concerns such as electrical safety, safety zone protection, fall protection, fire safety, personal protective equipment, signage/protective fencing and hazardous material handling.
1.14.3.3 Utilities Clearance
At least 72 hours prior to any excavation Nebraska 811 shall be contacted for utilities clearances.
1.15 Special Requirements
Contractor shall ensure that means of access is not impeded during construction.
1.16. Security:
1.16.1 In unoccupied facilities, the Contractor shall be responsible for the security of the facility; i.e., all exterior doors shall be locked, windows closed and locked, etc.
1.16.2 The Contractor shall not be on site without prior notification to the Corps of Engineers COR or otherwise designated person(s).
1.16.3 Contractor personnel shall have valid civilian ID's and Contractor vehicles shall have a valid registration.
1.17 Antiterrorism/Operation Security Requirements
http://www.hq.usace.army.mil/ http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_3
01 11 00-16
1.17.1 All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.17.2 All contractor and all associated sub-contractors employees will receive a CORPS Watch information paper
(provided by the authorized government representative) and provide a written acknowledgement to the COR, no later than 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract.
1.17.3 The Contractor must pre-screen candidates using the E-verify Program (http://www.dhs.gov/E- Verify) website to meet the established employment eligibility requirements. The vendor must ensure that the candidate has two valid forms of government issued identification to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 3 business days after the initial contract award.
1.17.4 Per the E-Verify Website the following exemptions apply:
Employers whose contracts are exempt from the E-Verify federal contractor rule are not required to enroll in E- Verify. A contract is considered exempt if any one of the following applies: (1) It is for fewer than 120 days. (2) It is valued at less than $150,000, the simplified acquisition threshold (Source: http://www.uscis.gov/e-verify/federal-contractors/exemptions-and-exceptions).
1.17.5 All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.18 Applicable Publications
The publications referenced herein shall be the most recent at the time of solicitation.
1.19 Worksite Housekeeping
1.19.1 The Contractor shall remove all trash and disposal material from the worksite before the end of each day. The
Contractor shall take all possible precautions to maintain the work site, at all times, in a condition that will prevent damage or injury to person or property, Government or otherwise. The Contractor shall be responsible for all damages caused by the negligent acts or omissions of his employees, sub-contractors, or agents during Contract performance.
1.19.2. Materials are not to be stockpiled on-site, but shall be coordinated with supplier on an as needed basis for direct placement. However, if any items are allowed to be stockpiled per the Operations Project Manager or COR, such items shall be placed in an orderly manner (i.e. dirt, rock, etc., in piles at a specified location and stackable items such as pipe, brick, lumber, etc., stacked off the ground on pallets in an orderly manner).
http://www.dhs.gov/E-http://www.uscis.gov/e-verify/federal-contractors/exemptions-and-exceptions) http://www.uscis.gov/e-verify/federal-contractors/exemptions-and-exceptions)
01 11 00-17
1.20 Responsibility for Damage
1.20.1 Damage to Personal Property:
The Contractor shall be solely responsible for all damage to Government and occupant personal property caused by the Contractors' personnel, subcontractors, his agents, or by the performance of his work.
1.20.2 Damage by Negligence
Damage resulting in gas leaks, electrical outages, loss of heat during cold weather, water leaks, unsecured facilities, weather damage, or oil/hazardous waste spills shall be responded to by the Contractor within 2 hours and repaired within one workday. If the Contractor fails to comply with these requirements, the Government reserves the right to repair the damage and charge the cost to the Contractor. Contractor shall protect all areas through which he will be transporting demolition debris or construction materials. All structures, including roadways, shall be carefully protected from damage by equipment or the impact of stones or blocks. Any damaged turf, sidewalks, roads, vegetation, site amenities, etc., shall be replaced or repaired by the Contractor prior to final Contract closeout at the Contractor’s expense.
1.21 Disposal of Materials
All materials removed, not reused or surplus material for this project shall transported to locations as directed by the COR. Location of material reuse site shall be located within 8 miles of the project office.
1.21.1 All other wastes generated during Contractor operations shall be disposed of by the Contractor at his/her expense.
1.21.2 Solid wastes (excluding clearing debris) shall be placed in containers which are emptied on a regular schedule.
Handling, storage, and disposal shall be conducted to prevent contamination. Segregation measures shall be employed so that no hazardous or toxic waste will become co-mingled with solid waste. The Contractor shall transport solid waste off Government property and dispose of it in compliance with Federal, State, and local requirements for solid waste disposal. A Subtitle D RCRA permitted landfill shall be the minimum acceptable off-site solid waste disposal option. The Contractor shall verify that the selected transporters and disposal facilities have the necessary permits and licenses to operate. The Contractor shall comply with Federal, State, and local laws and regulations pertaining to the use of landfill areas.
1.21.3 Wastes classified as hazardous wastes under the Resource Conservation and Recovery Act shall be disposed of, unless otherwise specified in this contract. No hazardous waste shall be disposed of without prior review of the disposal documents, and the approval of the Contracting Officer and the Directorate of Public Works Environmental Coordinator, or his designated representative. The Contractor shall provide an original copy of the disposal document from the approved EPA or State permitted disposal facility for each shipment of hazardous waste generated in this project to the Contracting Officers Representative.
1.21.4 Unified Facilities Guide Specifications (UFGS) 01572, “Construction and Demolition Waste Management,” indicates the Government policy is to “use all reasonable means to divert construction and demolition waste from landfills and incinerators and to facilitate their recycling and reuse.”
The Contractor shall make all attempts to divert waste material from landfills in coordination of this guidance.
2. MATERIALS
01 11 00-18
2.1 Filter Fabric
A non-woven geotextile/filter fabric must be placed between the soil and gravel bedding. Filter fabric shall be placed from the bottom of the keyed elevation up to the elevation of the boat ramp parking lot. Filter fabric will meet or exceed the following specifications:
Table 1 PROPERTY Minimum Average Roll Value Tensile Strength (Grab) 380 lbs.
Elongation 50% Puncture 240 lbs.
CBR Puncture 1025 lbs.
Mullen Burst 750 psi Trapezoidal Tear 150 lbs.
UV Resistance 70% Apparent Opening Size 100 US Std. Sieve Permittivity 0.7 sec-1 Water Flow Rate 50 gpm/ft2
2.2 Gravel Filter Blanket & Jetty Top Access Rock
Filter blanket material and rock used to create walkways on top of the jetties shall consist of fragments of sound, durable stone or crushed rock, free from disintegrated stone, alkali, salt, vegetable matter, or adherent coating.
Aggregate shall be reasonably free from thin or elongated pieces. The size should be conforming to ASTM No. 57 with a maximum size of 1” and a minimum of the #4 sieve (4.75 mm).
Table 2
ASTM No. 57 Grading Requirements for Base Course Aggregates ASTM Sieve Size Percent Passing (by weight)
1-½ in. 100 1 in. 95 to 100 ½ in. 25 to 60 ¼ in. 0 to 10 No. 4 0 to 5
2.3 Rip-Rap Material
The rock shall be sandstone, limestone, quartzite, or other hard stone. It shall be clean and free from earth, clay, or refuse. The solid rock shall have a density of at least 140 pounds per cubic foot. Each load of rock shall be graded as shown in Table 4. USACE reserves the right to deny any material deemed unsuitable. The rock shall be angular in shape to allow interlocking between the various rock sizes. Gradation control shall be done by a visual inspection that verifies the rock is reasonably well graded and conforms to the gradation requirements in Table 4. Rock riprap shall not have a soundness loss greater than 14 percent by weight at the completion of 16 cycles of freezing and thawing when tested in accordance with Nebraska Department of Roads, Standard Method T 103.
01 11 00-19
Table 3 Gradation Requirements for Rip Rap
Size of Rock Percent of Total Weight Smaller than Given Size
1,120.0 LBS 100%
472.5 LBS 30%
140.0 LBS Not to exceed 10%
2.4 Grass Seed
All seed needed for seeding applications shall be provided by USACE. The Contractor shall coordinate with the Contracting Officer for application rates for seed varieties.
2.4.1 Planting Dates
Planting Season Planting Dates Season 1 1 March to 30
May Season 2 1 September to
31 October Temporary Seeding No Restrictions
2.5 Erosion Control Blanket
Erosion control blanket shall provide a temporary, biodegradable cover material to reduce slope and/or channel erosion and enhance vegetation. Erosion control blanket performance capabilities shall be determined by ASTM D 6459, “Determination of Erosion Control Blanket (ECB) Performance in Protecting hill slopes from Rainfall- Induced Erosion”, and ASTM D 6460, “Determination of Erosion Control Blanket (ECB) Performance in Protecting Earthen Channels from storm water-Induced Erosion.”
Erosion control blanket shall have the following material characteristics, substitutions can be made at the approval of the Contracting Officer:
Width 8.0 ft (2.4 m) 16.0 ft (4.9 m) Length 112.5 ft (34.3 m) 112.5ft (34.3m) Area 100.0 yd2(83.6 m2) 200.0yd2(167.2m2)
Weight 50.0 lb (22.7 kg) 100.0 lb (45.4kg Mass Per Unit Area
(+/- 10%)
0.50 lb/yd2 (0.27 kg/m2) 0.50 lb/yd2 (0.27 kg/m2)
Net Openings (Polypropylene)
0.50 in x 0.50 in (12.7 mm x 12.7 mm)
0.50 in x 0.50 in (12.7 mm x 12.7 mm)
2.6 Erosion Control Blanket Staples
Staples shall be a minimum 4 in biodegradable, or 6 in wire for cohesive soils and 6 in or 8 in wire for non-cohesive soils. All staples shall have a U-shaped top.
3.0 EXECUTION:
01 11 00-20
3.1 General Excavation
Perform excavation of every type of material encountered within the limits of the project to the lines, grades, and elevations indicated and as specified. Perform the grading in accordance with the typical sections shown and the tolerances specified in paragraph FINISHING. During construction, perform excavation in a manner and sequence that will provide proper drainage at all times.
3.2 Removal of Tress
Large trees, both standing and fallen, line the shoreline area. Care should be taken to preserve those trees that stand above the 1950’ elevation and do not have the root area undercut at the present time. All trees that must be removed will be transported to a location agreed upon by both the COR and Contractor.
Regulations preventing removal of standing trees are in place from April 1 to July 15. If trees are going to be removed during these dates coordination will be performed between the Corps and other agencies, prior to any standing trees being removed.
3.3 Base Preparation for Shoreline Repair
3.3.1 Prior to the placement of riprap, the slope shall be graded to 1 foot vertical to 2.5 foot horizontal (1V:2.5H). The slope shall be graded in a manner that does disturb material beneath the sub-base elevation. All grading shall conform to the lines and grades indicated on the typical drawings. At the base of the slope the Contractor shall extend the slope along the same grade to 2 feet below the ground surface, forming a toe trench. The two feet measurement shall be from the existing ground to the deepest point of the trench, excluding teeth marks imprints.
3.3.2 Areas of the slope that have experienced sloughing, scouring, or voids that prohibit a uniform slope from the toe to the shoulder shall be repaired prior to final grading of the earthen slope. Deficiencies shall be repaired by placing graded materials from adjacent areas in vertical lifts within the deficient area. The Contractor shall utilize the method benching both horizontally and vertically when placing material into the deficient area. The benches shall be no more than 1 foot in the vertical and 1 foot in the horizontal into the embankment. This method shall begin at the lowest point of the deficient area and proceed up the slope in a stair step manner. The Contractor shall place material in no more than a 1 foot vertical lift.
3.3.3 After completion of the foot lift the Contractor shall compact soil by either operating a rubber tired machine, sheepsfoot roller, or vibratory plate compactor a minimum of 3 passes over the entire area. To ensure proper compaction, the Contractor shall visually inspected each lift and ensure that and no more than a ¼” indentation is made to the surface from the Contractor walking across the surface. After each lift and prior to placement of the next lift the Contractor shall scarify the preceding lift across the entire lift surface a minimum of 2” in depth to allow for soil adhesion between layers.
3.4 Placement of Filter Cloth
Filter fabric as specified in Table 2 shall be placed on the properly graded foundation. Placement of filter fabric shall be in strict conformance with the manufacturer’s written instructions and recommendations. The filter fabric should not extend into the lake beyond the riprap layer, rather it should be placed so that the furthest extent is at the deepest point in the toe trench. Filter cloth shall be secured in place by a 12” Geopin with washer at increments that prevent the cloth from sliding during rock placement.
01 11 00-21
3.5 Bedding Material
A layer of ASTM No. 57 course aggregate shall be placed upon the filter fabric prior to placement of riprap.
Material shall be placed and graded to follow the lines of the slope. The material does not require compaction. The material shall be placed from the bottom of the toe to the top of the slope. Bedding material is to be placed uniformly across the slope in a 6” layer +0.00”/-0.25”.
3.6 Rip-Rap Placement
Rock shall be placed uniformly in final position using powered equipment. Contractor shall not allow steel tracked equipment to transit over or on top of rip-rap being placed. Placement shall commence at the toe and proceeding up the slope. Dropping stone from heights greater than 2 feet can cause fracturing of the rip-rap and thus is not authorized, unless work area is partially submerged. If work area is partially submerged, the Contractor shall make every attempt to limit the height of the drop as to limit the impact of rock to rock contact when placing. Depth of riprap shall be at least 2 feet thick extending from the bottom of the key trench to the top elevation of the existing campground, parking lot, or otherwise noted adjoining area.
In some cases the placed rip rap will not reach the height of the adjoining campground. In those cases the bank will be sloped according to specifications and reseeded. An estimated length and width is provided for each area. The quantity of small stones shall be kept as low as possible, sufficient only to fill the voids between the larger stones.
Care shall be taken that this small material is well distributed throughout the mass and not allowed to segregate or form pockets of small stone. All bridging shall be broken down.
Large interstices, or open channels, or voids shall be filled by chinking or otherwise manipulating the rock. The finished riprap surface shall in general conform to the slope lines shown on attachment and tie into any existing revetment at the site. The final product shall appear uniform across the placement. The Contractor shall ensure that depressions, voids, and mounding are manipulated as to provide a uniform appearance.
3.7 Grass Seeding
3.7.1 Ground Preparation
Provide soil preparation prior to planting (including soil conditioners as required), fertilizing, seeding, and surface topdressing of all newly graded finished earth surfaces, unless indicated otherwise, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations. The Contractor shall prepare the graded areas by by disking, harrowing, tilling or other method approved by the Contracting Officer. Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic.
3.7.2 Seed Application Seasons and Conditions
Do not seed when ground is muddy, frozen, snow covered, or in an unsatisfactory condition for seeding. If special conditions exist that may warrant a variance in the above seeding dates or conditions, submit a written request to the Contracting Officer stating the special conditions and proposed variance. Seeding may be accomplished through one of two methods: broadcasting onto bare ground then lightly harrowing the soil to cover seed, or drilling grass seed directly into the soil, no greater than 1/4” deep. If broadcast method is utilized, then immediately after seeding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width. If seeding is performed with
01 11 00-22 cultipacker-type seeder or by drill, rolling may be eliminated. Application rate shall be 100 lbs. to the acre for broadcast and 50 lbs. to the acre for drilling.
3.7.3 Erosion Control
Install in accordance with manufacturer's instructions, where indicated or as directed by the Contracting Officer.
Erosion control blanket shall be orientated in vertical strips and anchored with staples on 4 foot centers. Adjacent strips shall be overlapped to allow for installation of a common row of staples that anchor through the nettings of both blankets. Horizontal joints between erosion control blankets shall be sufficiently overlapped with the uphill end on top for a common row of staples so that the staples anchor through the nettings of both blankets.
3.8 Shoreline Stabilizations Areas (Base)
3.8.1 Methodist Cove Campground
3.8.1.1 Boat Ramp Area (Exhibit M1)
Boat Ramp Area Estimated Dimensions 650’ L x 12’ W
Elevations Top Rock Elevation Est 1954 msl Bottom Elevation 1944 msl
3.8.1.2 Campsite 6-21 (Exhibit M1)
Campsite Area 6-21 Estimated Dimensions 280’ L x 15’ W
3.8.1.3 Boat Ramp Jetties (Exhibit M1)
Boat Ramp Jetties
Estimated Dimensions West Methodist Boat Ramp Jetty 440’ L x 10’W x 10” Deep East Methodist Boat Ramp Jetty 300’ L x 10’W x 10” Deep
3.8.2 Gremlin Cove Area
3.8.2.1 Dredge Containment Pit Area (Exhibit G1)
Dredge Containment Pit Area Estimated Dimensions 1200’ L x 12’ W
Top Rock Elevation Varies Bottom Elevation Varies
3.8.2.2 South Boat Ramp Area (Exhibit G1)
South Boat Ramp Area Estimated Dimensions 305’ L x 20’ W
Top Rock Elevation Est 1952 msl Bottom Elevation Est 1944 msl
01 11 00-23
3.8.2.3 Gremlin Area Jetties (Exhibit G1)
Gremlin Area Jetties
Northeast Gremlin Jetty 260’ L x 10’W x 10” D Southeast Gremlin Jetty 200’ L x 10’W x 10” D West Gremlin Jetty 530’ L x 10’W x 10” D
3.8.3 Cedar Point Area
3.8.3.1 Cedar Point Parking Lot Area (Exhibit C1)
Cedar Point Parking Lot Area Estimated Dimensions 225’ L x 22’ W
Top Rock Elevation Est 1954 msl Bottom Elevation 1944 msl
3.8.3.2 Cedar Point Abutment Area (Exhibit C1)
Cedar Point Abutment Area Estimated Dimensions 280’ L x 22’ W
Top Rock Elevation Est 1955 msl Bottom Elevation 1944 msl
3.9 Shoreline Stabilizations Areas (Options)
3.9.1 Hunter Cove (Exhibit H1)
Hunter Cove Campground Estimated Dimensions 810’ L x 18’ W
Top Rock Elevation Est 1954 msl Bottom Elevation 1945 msl
3.9.2 Patterson Harbor Area Jetty (Exhibit P1)
Patterson Harbor Area Jetty
Patterson Harbor Jetty 1240’ L x 10’W x 10” D
W912DQ20B1080
LEFT BLANK INTENTIONALLY
Section 00 21 13 - Instructions to Bidders
INSTRUCTIONS TO BIDDERS
SUBMISSION OF BIDS: Due to the COVID-19 Global Pandemic, the Government is taking precautions to ensure the safety and health of all Contractors and Government employees.
Therefore, ‘in person’ bids submissions will not be accepted.
ELECTRONIC BIDS ARE REQUIRED. MAILED AND HAND-DELIVERED BIDS ARE
NOT ALLOWED.
The Contractor is required to ensure that the bid package is legible and complete. Bid bonds shall be copied and scanned so that all required raised seals are legible.
To submit your bid by electronic mail (email) submit it to Contract Specialist, Sheila Nimrod (sheila.d.nimrod@usace.army.mil). Keep in mind that due to email safeguards and the size of your bid package, emails may not be received immediately by the Government. The USACE email system will not accept attachments larger than 50MB. Bids shall be received by the date and time specified in the solicitation document.
Alternatively, you may submit your bid via DoD SAFE (secure access file exchange) https://safe.apps.mil/ . You will receive a drop-off request from the Contract Specialist via email. The drop-off request includes a code that is needed to submit the bid via the DoD SAFE system. A drop-off request will be submitted to every potential bidder that provides a contact name and email address to Contract Specialist, Sheila Nimrod (816) 389-2252 or sheila.d.nimrod@usace.army.mil. The drop-off code is valid for fourteen (14) days and will be provided fourteen (14) days prior to the bid close date.
It is recommended you contact the Contract specialist by phone or email to confirm receipt of your bid. Due to possible delays in networks and electronic mail systems, it is highly recommended that bids are submitted as early as possible. Do not wait until the last minute or your proposal may be late.
If the emailed bid is not received due to technical issues or network issues, Refer to FAR 52.215- 1 for how late proposals are handled. If you have not confirmed receipt of your proposal please note: Per this clause it is recommended that proposers ensure;” …it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bid;…”
If you have any questions, or cannot gain access to the conference line, contact Contract Specialist at (816) 389-2252.
SUBMISSION REQUIREMENTS
https://safe.apps.mil/ mailto:sheila.d.nimrod@usace.army.mil
All bids are due by the time specified in box 13 A.
The public bid opening will begin at the time specified in Box 13 A, at the following address:
ALSO REFER TO SECTION 00 01 05 CAUTION PAGE
Submit one (1) original and one (1) copy of the following:
a. Bid schedule - complete by fully entering all amounts in the supplemental bid schedule.
b. Ensure Bid is signed by a Principal of your company with authority to do so.
c. Ensure all Amendments are acknowledged.
d. Bid Bonds – (Original with raised seal) required with your submission. (See solicitation for details).
e. Ensure your company DUNS and CAGE code numbers are included
INQUIRIES/QUESTIONS
Prospective Bidders shall submit contracting and technical inquiries and questions concerning this solicitation document via Bidder Inquiry in ProjNet at www.projnet.org/projnet .
Prospective Bidders that require additional assistance or have questions feel free to contact the Project Manager, Thomas Zikmund at (816) 389-3946 thomas.j.zikmund@usace.army.mil , or email the Contracting Specialist at sheila.d.nimrod@usace.army.mil .
a. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on the next screen is correct and click continue.
b. From this page, you may view all bidder inquiries or add a new inquiry.
c. Bidders will receive an acknowledgement of their questions via email, followed by an answer to their questions after it has been processed by our technical team. ***Please Note: Bidders shall only submit one (1) Question per inquiry. All inquiries containing multiple questions shall be rejected***
d. The Solicitation Number is: W912DQ20B1080
e. The Plan Room Key is: N/A
f. The Bidder Inquiry Key is: WHW9XG-7QFGA6 The Bidder Inquiry System will be unavailable for new inquiries after, 11 September 2020 at 2:00 p.m. Central time in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the Solicitation if necessary.
http://www.projnet.org/projnet mailto:thomas.j.zikmund@usace.army.mil mailto:sheila.d.nimrod@usace.army.mil
Bidders are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP.