B.08.02 Solicitation Attachment 7.docx

DOCX document 20 KB Posted

Attached to
MEGA Small Business Pre-placed Remedial Action Contract (PRAC)
Solicitation number
W912DQ21R3004
Issued by

About this file

This document contains a Pre-award Survey of Prospective Contractor Accounting System Checklist and information on a related federal contract opportunity for hazardous waste remediation services. The Checklist evaluates whether an accounting system is adequate for cost reimbursement contracts and ready for audit by the Defense Contract Audit Agency. It addresses requirements for proper cost segregation, timekeeping, labor distribution, cost determination, allowability, and financial reporting. The related federal opportunity is a Pre-placed Remedial Action Contract to provide hazardous, toxic and radioactive waste cleanup services for the U.S. Army Corps of Engineers, Environmental Protection Agency and other government agencies. Work will include Defense Environmental Restoration Program, Superfund, Brownfields, Formerly Utilized Sites Remedial Action Program, and other environmental compliance and pollution prevention projects.

View the file

Other files

File Type Posted
B.08.03 Amendment 0001 20210226.pdf PDF
B.08.03 Solicitation Attachment 1.docx DOCX document
B.08.02 Solicitation Attachment 3.docx DOCX document
B.08.02 Solicitation Attachment 8.docx DOCX document
B.08.02 Solicitation Attachment 9.docx DOCX document
B.08.02 SB PRAC Solicitation - W912DQ21R3004 20210129.pdf PDF
B.08.02 Solicitation Attachment 5.docx DOCX document
B.08.02 Solicitation Attachment 1.docx DOCX document
B.08.02 Solicitation Attachment 10.docx DOCX document
B.08.02 Solicitation Attachment 2.docx DOCX document
B.08.02 Solicitation Attachment 6.docx DOCX document
B.08.02 Solicitation Attachment 4.docx DOCX document
B.08.02 Solicitation Attachment 11.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J, ATTACHMENT 7

Pre-Award Survey of Prospective Contractor Accounting System Checklist

FAR 16.301-3 states that a cost-reimbursement type contract may be used only when the contractor’s accounting system is adequate for determining costs applicable to the contract. If no information is available in the files to make this determination, the Contracting Officer may request a Preaward Survey of Prospective Contractor’s Accounting System (SF1408) from DCAA.

Instructions:

0. Mark “X” in the appropriate column.

0. On Page 2, provide a narrative describing how the current accounting system supports your response to each item. Be as descriptive as necessary.

Contractor Name:

Point of Contact (Name, Phone No., Email):

CAGE Code

Ready for Audit (YES)/(NO):

Yes
No
N/A
Note

1. Is the accounting system in accord with generally accepted accounting principals?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate the final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees’ labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to Government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principals and Procedures, or other contract provisions

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments.

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

5. Is the accounting system currently in full operation? (if not, describe in Page 2 narrrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent).

Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note
Narrative

PLEASE ANSWER ALL QUESTIONS BELOW:

1. Are you planning on bidding on cost type contracts?

2. Are you ready for a DCAA Audit?

3. Have you read the requirements in the SF1408?

4. Have you read the “Information for Contractors” Document on DCAA’s website, located at http://www.dcaa.mil?

5. Please identify the DCAA office that is cognizant over your company (found on DCAA’s website, located at http://www.dcaa.mil)

6. Please identify your company’s point of contact (Name, Phone No, Email)

If an Outside CPA/Consultant/Non DoD agency has reviewed your Accounting System, please provide a copy of the Report.

[Insert name and title of individual responsible for design of the accounting system]

Name:_________________________Signature:____________________________
Title:__________________________Date:______________________

Contractor:____________________________________________________

File details come from the government source that posted it. Updated .