B.08.02 Final Solicitation W912EF22B0002.pdf

PDF 1 MB Posted

Attached to
Towboat Services Federal contract opportunity
Solicitation number
W912EF22B0002
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

This is a solicitation for towboat services to transport juvenile fish along the Snake and Columbia Rivers between April and August 2022. The U.S. Army Corps of Engineers Walla Walla District is seeking contractors to provide a minimum of four towboats, each with a full operating crew, to push up to four government-owned fish barges daily or every other day from Lower Granite Dam to release points below Bonneville Dam. Towboats must complete the round trip within 80 hours, including loading times at dams. Contractors must also fuel the barges and provide limited mechanical assistance. The period of performance is from April 2022 through March 2023 with two one-year options to extend. Pricing will be paid by the trip, with separate rates for full trips, half trips, deadhead moves, and fuel. The solicitation includes detailed specifications for towboat equipment, staffing, safety requirements, and performance standards subject to payment deductions.

View the file

Other files for this federal contract opportunity

Other files attached to Towboat Services, newest first.
File Type Posted
W912EF22B0002 Bid Opening Results.pdf PDF
B.08.03 KO released Solicitation Amendment W912EF22B0002 U0001.pdf PDF
22B0002 Attachment 2 Towboat Inspection Checklist.pdf PDF
22B0002 Attachment 3 Activity Hazard Analysis Form.pdf PDF
22B0002 Attachment 1 Map .pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 10:00 AM local time 03 Mar 2022

A X B X C

D E

X G F 77 - 78

79 - 84 H 85 melita.s.doyle@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 85

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912EF 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

MELITA S DOYLE 509-527-7207

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 22

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

23 - 37 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE 38 - 41

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

42 - 71

PART II - CONTRACT CLAUSES

USAED, WALLA WALLA - CONTRACTING DIV.

MELITA S. DOYLE

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876 509-527-7207

509-527-7802FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

72 - 76

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

02 Feb 2022

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912EF22B0002

12/29/21, 8:53 AM Wage Determination: 2015-0213, 26 https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 2/3

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Towboat 1

FFP

Period of Performance 01 April 2022 - 31 March 2023

NET AMT

0001AA 30 Job Towboat 1

FFP

Towboat 1 Full Trip FOB: Destination

PSC CD: V125

https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 3/3

0001AB 1 Job Towboat 1

FFP

Towboat 1 Half-trip

0001AC 2 Job Towboat 1

FFP

Towboat 1 Deadhead

Towboat 2 https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 4/3

0002AA 30 Job Towboat 2

FFP

Towboat 2 Full Crew

0002AB 1 Job Towboat 2

FFP

Towboat 2 Half-Trip

0002AC 2 Job Towboat 2

FFP

Towboat 2 Deadhead https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 5/3

Towboat 3

0003AA 8 Job Towboat 3

FFP

Towboat 3 Full Crew

0003AB 1 Job Towboat 3

FFP

Towboat 3 Half-Trip https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 6/3

0003AC 2 Job Towboat 3

FFP

Towboat 3 Deadhead

Towboat 4

0004AA 8 Job Towboat 4

FFP

Towboat 4 Full Crew https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 7/3

0004AB 1 Job Towboat 4

FFP

Towboat 4 Half-Trip

0004AC 2 Job Towboat 4

FFP

Towboat 4 Deadhead https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 8/3

0005 1 Lot Diesel Fuel

FFP

Diesel Fuel - Barges Diesel fuel for Government fish barges - Routine Operations. Fuel will be paid at actual costs paid by the contractor and supported by invoices submitted by the Contractor to the Contracting Officer Representative (COR). Offerors shall not price this line item. The line item will be funded at the time of award using a Not to Exceed limitation of 13,000 gallons based on historical fuel usage.

0006 2 Job Research Trips

FFP

Research Trips Period of Performance 01 April 2022 - 31 March 2023 https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 9/3

OPTION Towboat 1

Option Year One Period of Performance 01 April 2023 - 31 March 2024

1001AA 30 Job OPTION Towboat 1

FFP

Towboat 1 Full Trip

1001AB 1 Job OPTION Towboat 1

FFP

Towboat 1 Half-Trip https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 10/

1001AC 2 Job OPTION Towboat 1

FFP

Towboat 1 Deadhead

OPTION Towboat 2

1002AA 30 Job OPTION Towboat 2

FFP

Towboat 2 Full Crew https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 11/

1002AB 1 Job OPTION Towboat 2

FFP

Towboat 2 Half-Trip

1002AC 2 Job OPTION Towboat 2

FFP

Towboat 2 Deadhead

OPTION Towboat 3 https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 12/

1003AA 8 Job OPTION Towboat 3

FFP

Towboat 3 Full Crew

1003AB 1 Job OPTION Towboat 3

FFP

Towboat 3 Half-Trip https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 13/

1003AC 2 Job OPTION Towboat 3

FFP

Towboat 3 Deadhead

OPTION Towboat 4

1004AA 8 Job OPTION Towboat 4

FFP

Towboat 4 Full Crew https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 14/

1004AB 1 Job OPTION Towboat 4

FFP

Towboat 4 Half-Trip

1004AC 2 Job OPTION Towboat 4

FFP

Towboat 4 Deadhead https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 15/

1005 1 Lot OPTION Diesel Fuel

FFP

Diesel Fuel - Barges Diesel fuel for Government fish barges - Routine Operations. Fuel will be paid at actual costs paid by the contractor and supported by invoices submitted by the Contractor to the Contracting Officer Representative (COR). Offerors shall not price this line item. The line item will be funded at the time of award using a Not to Exceed limitation of 13,000 gallons based on historical fuel usage.

1006 2 Job OPTION Research Trips

FFP

Research Trips Option Year One Period of Performance 01 April 2023 - 31 March 2024 https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 16/

OPTION Towboat 1

Option Year Two Period of Performance 01 April 2024 - 31 March 2025

2001AA 30 Job OPTION Towboat 1

FFP

Towboat 1 Full Trip

2001AB 1 Job OPTION Towboat 1

FFP

Towboat 1 Half-Trip https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 17/

2001AC 2 Job OPTION Towboat 1

FFP

Towboat 1 Deadhead

OPTION Towboat 2

2002AA 30 Job OPTION Towboat 2

FFP

Towboat 2 Full Crew https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 18/

2002AB 1 Job OPTION Towboat 2

FFP

Towboat 2 Half-Trip

2002AC 2 Job OPTION Towboat 2

FFP

Towboat 2 Deadhead

OPTION Towboat 3 https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 19/

2003AA 8 Job OPTION Towboat 3

FFP

Towboat 3 Full Crew

2003AB 1 Job OPTION Towboat 3

FFP

Towboat 3 Half-Trip https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 20/

2003AC 2 Job OPTION Towboat 3

FFP

Towboat 3 Deadhead

OPTION Towboat 4

2004AA 8 Job OPTION Towboat 4

FFP

Towboat 4 Full Crew https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 21/

2004AB 1 Job OPTION Towboat 4

FFP

Towboat 4 Half-Trip

2004AC 2 Job OPTION Towboat 4

FFP

Towboat 4 Deadhead https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 22/

2005 1 Lot OPTION Diesel Fuel

FFP

Diesel Fuel - Barges Diesel fuel for Government fish barges - Routine Operations. Fuel will be paid at actual costs paid by the contractor and supported by invoices submitted by the Contractor to the Contracting Officer Representative (COR). Offerors shall not price this line item. The line item will be funded at the time of award using a Not to Exceed limitation of 13,000 gallons based on historical fuel usage.

2006 2 Job OPTION Research Trips

FFP

Research Trips Option Year Two Period of Performance 01 April 2024 - 31 March 2025 https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 23/

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT FOR TOWBOAT SERVICES IN SUPPORT OF THE JUVENILE FISH

TRANSPORTATION PROGRAM FOR WALLA WALLA DISTRICT

TABLE OF CONTENTS

SECTION-1 GENERAL INFORMATION

1.1. LOCATION AND EXTENT OF WORK

1.2. JUVENILE FISH TRANSPORTATION PROGRAM

1.3. TOWBOAT REQUIREMENTS

1.3.1. TOWBOAT INSPECTIONS

1.3.2. BARGE PUSHING REQUIREMENTS

1.3.3. FISH BARGE TRANSPORT

1.3.4. REPLACEMENT TOWBOATS

1.3.5. TOWBOAT LIVING ACCOMMODATIONS

1.3.6. COMMUNICATIONS EQUIPMENT

1.3.7. ELECTRICAL AND COMPRESSED AIR REQUIREMENTS FOR TOWBOATS.

1.4. STAFFING

1.4.1. NAMES AND QUALIFICATIONS

1.4.2. VETERANS EMPLOYMENT EPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

SECTION-2 SAFETY REQUIREMENTS

2.1. GENERAL SAFETY REQUIREMENTS

2.2. CONTRACTOR PERSONNEL

2.2.1. CONTRACT MANAGER

2.2.2. CONTRACT PERSONNEL

2.3. SAFETY DOCUMENTATION

2.3.1. ACCIDENT PREVENTION PLAN (APP)

2.3.2. ACTIVITY HAZARD ANALYSIS (AHA)

2.3.3. MISHAP REPORTING

2.4. MEETINGS

2.4.1. PRE-TRANSPORT AND SAFETY MEETINGS

SECTION-3 ANTITERRORISM, TRAINING AND SECURITY REQUIREMENTS

3.1. HAZARDOUS ENERGY CONTROL PROGRAM

3.2. AT LEVEL I TRAINING

3.3. OPERATIONS SECURITY (OPSEC) TRAINING

3.4. ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

3.5. CONTRACTORS WHO DO NOT REQUIRE COMMON ACCESS CARD (CAC), BUT

REQUIRE ACCESS TO A DOD FACILITY OR INSTALLATION

3.6. ACCESS REQUIREMENTS TO DOD FACILITY OR INSTALLATION

3.7. SUSPICIOUS ACTIVITY REPORTING TRAINING

3.8. ESCORTS IN RESTRICTED AREAS

3.9. PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM

SECTION-4 GOVERNMENT FURNISHED PROPERTY

4.1. GOVERNMENT FURNISHED PROPERTY (GFP)

SECTION C-5 BARGES

5.1. FISH BARGES

5.2. BARGE ACCESS

5.3. BARGE OPERATION

5.4. BARGE FUELING

SECTION-6. RESPONSIBILITIES

6.1. GOVERNMENT RESPONSIBILITIES

https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 24/

6.1.1. TIMEKEEPING & RECORD KEEPING

6.1.2. LOG BOOKS

6.1.3. FUEL, OPERATING SUPPLIES, LUBRICATION, ETC.

6.1.4. GOVERNMENT PERSONNEL

6.2. CONTRACTOR RESPONSIBILITIES

6.2.1. CONTRACTOR RESPONSIBILITIES

6.2.2. MISPLACED MATERIAL

6.2.3. MARINE RISK

6.2.4. SIGNAL LIGHTS

6.2.5. CREW ASSIST

6.2.6. EXCLUSION

SECTION-7 PAYMENTS

7.1. INVOICES

7.2. RATES

7.3. BREAKDOWN

7.5. DEADHEAD RATES

7.6. MISCELLANEOUS COSTS

7.7. TOWBOAT CREWS

7.8. FUEL

SECTION-8 COMMENCEMENT, PROSECUTION AND COMPLETION

8.1. COMMENCEMENT

8.2. PROSECUTION

8.3. COMPLETION

SECTION-9 PERFORMANCE REQUIREMENTS

9.1. PERFORMANCE REQUIREMENTS SUMMARY

9.2. DEDUCTIONS FOR NON-PERFORMANCE

SECTION-10 ATTACHMENTS

10.1. Map

10.2. Inspection Checklist

10.3. Activity Hazard Analysis

SECTION-1 GENERAL INFORMATION

1.1. LOCATION AND EXTENT OF WORK

Work will be performed on the Snake and Columbia rivers in the area between Lower Granite Reservoir (near Lewiston, ID) and Portland, OR. The Contractor shall provide equipment and perform services for the following operations:

1.2. JUVENILE FISH TRANSPORTION PROGRAM

The Contractor shall provide four towboats, each staffed with crews for 24-hour per day operation, to transport Government-owned fish barges from Lower Granite Juvenile Fish Facility to fish release areas below Bonneville Dam (see map – Attachment 1). Stops will be made at Little Goose and Lower Monumental dams to load additional fish or to pick up an additional fish barge for transport to the release site. The initiation of barging operations is based on runoff and fish outmigration projections. During years when runoff is forecasted to be near or above normal or average runoff, barging of fish could begin as late as May 2. During low flow or drought years, barging of https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 25/ fish may begin as early as 21 April. Transporting of fish by barge from Snake River dams will therefore begin sometime between April 21 and May 2, as directed by the Contracting Officer or Contracting Officer’s Representative (COR), and could last through August 14 or 15, but could end as early as June 20 depending on fish collection numbers or as coordinated with regional fish managers. The COR shall give the Contractor not less than 7 days (168 hours) notice for end of fish transport by barge operations for the year. Unlike past contracts, no provisions are included for the transport of fish from McNary Dam.

Early in the season, two Towboats may alternate, leaving Lower Granite Dam every-other-day for the trip downriver. If fish numbers increase, two additional Towboats will be placed in service so that a towboat and barge leave Lower Granite Dam daily. Later, when numbers of fish decrease, the program will return to the every-other-day operation. Since every-other-day or daily barge operations begin April 21 or later at Snake River dams, the Corps may direct a Towboat to barge fish once a week from Lower Granite Dam in support of fish research until the start of daily or every other day transport. The weekly transport of research fish may begin as early as April 1 and will cease at the direction of the Corps or when every-other-day or daily barge operations are in progress. During part or all of the daily Snake River fish barging operation, the Government may be direct-loading fish barges at Little Goose Dam. The Contractor will routinely transport a loaded fish barge from Lower Granite Dam, stop and pick up a loaded fish barge at Little Goose Dam, stop and load additional fish at Lower Monumental Dam and then continue on the trip downstream to the release site. On return trips back to Lower Granite Dam, one of the empty barges will be left at Little Goose Dam. Direct loading of fish at Little Goose Dam may also take place during part of the every-other-day barging operation. Barging may continue until approximately mid-August or when fish numbers decline to where trucks will be used for their transport or based on regional agreements regarding the start and ending of fish transport by barge.

Additionally, a stop at Lyon’s Ferry Hatchery may be required during a downriver trip to pick up fish from Washington Department of Fish and Wildlife.

1.3. TOWBOAT REQUIREMENTS

1.3.1. TOWBOAT INSPECTIONS. The Contractor is responsible for having a marine surveyor or marine architect inspect all towboats considered for use under this contract, including all towboats that may be used as spare towboats, prior to beginning work on this contract. The marine surveyor/architect will determine seaworthiness, capability of meeting contract requirements, and that towboats provided are safe to operate under weather, wind, and flow conditions prevalent on the Columbia and Snake rivers during the contract period. The marine surveyor/architect shall complete the inspection checklist (Attachment 2) for each towboat and shall certify that each boat proposed for use under this contract satisfies all requirements of this contract including stability, horsepower, propulsion and other requirements. All towboats or other equipment which do not pass the safety inspections must be modified to meet the requirements. Towboats that do not meet the requirements of this contract may not be used by the Contractor for work performed under this contract. Certified inspections that each proposed boat satisfies all requirements of this contract shall be provided to the COR by March 25 of the first (base) contract work year. The Contractor must complete all modifications to towboats to correct deficiencies noted in inspections and provide written notice of those modifications to the COR prior to towboats going into service under this contract. Inspection reports and correction of deficiencies must be approved by the COR prior to the use of any towboat on this contract.

Certified inspections for each towboat may be resubmitted in subsequent option years under this contract. However, if a vessel has been modified, repowered, or have been involved in an accident or incident resulting in damage to the towboat since the initial certification, then another inspection and recertification will be required. Re-inspection results and re-certification documentation must be provided to and reviewed by the COR prior to the vessel returning to service.

1.3.2. BARGE PUSHING REQUIREMENTS. Each towboat provided shall have a minimum total of 1,350 shaft horsepower, be equipped with at least two engines and two propellers, have watertight hatches on main decks, and meet or exceed requirements on the inspection checklist (Attachment 2). Each towboat shall be capable of routinely moving two to four fully loaded Government owned fish-hauling barges, in any combination of sizes, downstream simultaneously as well as moving up to four empty barges upstream. Other combinations of up to four barges may be moved to and from moorage spaces or to and from dams within the contract area as requested by the COR.

1.3.3. FISH BARGE TRANSPORT. Towboats shall be capable of maintaining a round trip time from Lower Granite Dam to the release site below Bonneville Dam (Skamania Light/Warrendale area) and back with fish barges https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 26/ not to exceed 80 hours total time. This 80 hour turnaround time shall include up to 3 hours loading time at Little Goose Dam and up to 3 hours at Lower Monumental Dam. Deducting loading time allows 74 hours to progress downstream through seven reservoirs and seven navigation locks to the release site below Bonneville Dam, unload fish, and to return back upstream to Lower Granite Dam. Fish releases will be made at dusk or after sunset in order to minimize exposure to avian predation. In addition to total turn-around time, the contractor must complete the downstream run from Lower Granite Dam to Little Goose Dam in 5 hours or less and from Little Goose Dam to Lower Monumental Dam in 4 hours or less. The Contractor must consider the fact that substantial river flows, high flow velocities, inclement weather, and strong winds can be anticipated during the contract period. Any delays caused by flow or weather conditions are to be reported immediately to the COR or their designee the barge rider.

Lock operators at all Corps dams in the contract area will be notified that fish-hauling barges shall receive first priority when using the various navigation locks. Lockage, fueling, and crew replacement times are to be considered in the 80 hour transit time. Towboat captains are to request priority lockage on all fish-hauling trips. Any delays in movement of towboats and fish barges caused by the Government will not be charged to the 80-hour turn-around time. Partial trips may be necessary when transiting to Lower Granite Dam from the contractor home point of origin when beginning service ("Deadhead" or not in tow), transitioning to home point of origin upon completion of service ("Deadhead" when not in tow), or when directed to move or transfer barges to a designated moorage location before going out of service. If the duration of the operation is less than 40 hours, then the government shall be invoiced at half the rate of a single trip. If the operation takes 40 hours or more to complete, then the government may be billed for a single trip. The government shall not be invoiced for partial trips resulting from contractor negligence or equipment failure or for circumstances beyond government control such as inclement weather. A partial trip may also result from special purpose barge movement for repairs or for a special run to return barges to Lower Granite Dam.

1.3.4. REPLACEMENT TOWBOATS. In the event that the Contractor's towboats are not meeting the maximum turn-around times, the Government reserves the right to require the Contractor to provide alternate towboat(s) that meet the minimum requirements specified in this contract. If the Contractor cannot supply satisfactory replacement towboat(s), the Government reserves the right to supply a replacement and deduct the cost from moneys due to the Contractor.

1.3.5. TOWBOAT LIVING ACCOMMODATIONS. Each towboat shall have fully equipped sleeping, cooking, and dining facilities adequate to house a full operating crew and one assigned representative of the Government (barge rider). Towboats shall be equipped with both hot and cold potable water for showering, washing hands in restrooms, cooking, drinking, and washing dishes. The Government representative (barge rider) shall have a private stateroom or bunk room to ensure privacy. The Contractor shall also be responsible for providing all meals for the Government representatives (barge riders) on the towboats. It is acceptable to add temporary living space for the Government representative provided that the living space is secure from weather and elements, securely fastened to the deck, heated and air-conditioned, and not exposed to any more noise and fumes than would be encountered in the boat's normal crew quarters. Research or news media personnel may accompany some transport trips however, they would not require overnight accommodations because they would be onboard for less than a day.

1.3.6. COMMUNICATIONS EQUIPMENT. Towboats shall be equipped with adequate communications equipment, including cellular telephones, to ensure contact with the Government representative onboard, navigation locks, and emergency services at all points along the river in the contract area.

1.3.7. ELECTRICAL AND COMPRESSED AIR REQUIREMENTS FOR TOWBOATS. Towboats are required to supply 120 volt AC power to the barges for running navigation lights, cabin lights, and engine alarms. All towboats must have correct wiring (polarity) as indicated by checking with an approved circuit tester made by a company such as Hubbell, Ideal, or Leviton. Towboats shall provide compressed air to the barges on an as needed basis if required for operating the fish hold opening mechanisms.

1.4. STAFFING

1.4.1. NAMES AND QUALIFICATIONS. Provide plans in accordance with the requirements outlined in Appendix A of the most recent EM 385-1-1 (https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf)including the following:

https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 27/

Names and qualifications (resumes including education, training, experience and certifications) of site safety and health personnel designated to perform work on this project to include the designated Contract Manager and other competent and qualified personnel to be used. Specify the duties of each position.

Qualifications of competent and of qualified persons. As a minimum, designate and submit qualifications of competent persons for each of the following major areas: excavation; scaffolding; fall protection; hazardous energy;

confined space; health hazard recognition, evaluation and control of chemical, physical and biological agents; and personal protective equipment and clothing to include selection, use and maintenance.1.7. COVID 19. The Contractor shall follow federal Centers for Disease Control, State and Local guidelines.

1.4.2. VETERANS EMPLOYMENT EPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS. In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs-VOW to Hire Heroes Act http://benefits.va.gov/vow Army Recovery Care Program – https://www.arcp.army.mil U.S. Chamber of Commerce Foundation – Hiring Our Heroes http://www.hiringourheroes.org/ Guide to Hiring Veterans – Reference Material https://obamawhitehouse.archives.gov/blog/2012/04/10/white-house-business-councils-guide-hiring-veterans

SECTION 2. SAFETY REQUIREMENTS

2.1. GENERAL

2.1.1. GENERAL SAFETY REQUIREMENTS. The contractor, towboats, barges, and any other equipment provided by the Contractor shall comply and/or meet all applicable Occupational Safety and Health Act (OSHA), American Society of Safety Engineers (ASSE/SAFE) and National Fire Protection Associations (NFPA) standards as well as United States Department of Transportation laws and regulations, United States Coast Guard (USCG) laws and regulations and the latest Corps of Engineers' Safety and Health Requirements found in the updated version of the EM 385-1-1 Manual. Contractor personnel and equipment shall be subject to safety inspections by Government personnel.

2.2. CONTRACTOR PERSONNEL

2.2.1. CONTRACT MANAGER. The contractor shall designate an on-site Contract Manager and alternate to be responsible for overseeing work performance and safety. The individual(s) shall be present during all hours of operation discussed in sections 1.2., 1.3.3., 2.4.1., 5.2., 5.3., 5.4. and 6.2. The contract manager and alternate shall have full authority to act for the Contractor on all matters related to daily operation and safety related to and within this contract. The individual(s) shall be available during normal business hours and is expected to provide call back within the same day to discuss issues related to this contract. The name, contact/cell phone number and e-mail address of the individual(s) must be designated in writing and provided to the Contracting Officer Representative (COR) at the pre-work meeting. The Contract Manager and alternate shall be able to fluently read, write, speak and understand English.

2.2.2. CONTRACT PERSONNEL. To minimize risk, the contractor shall not employee persons for work on this contract if the COR considers such person a risk to the health, safety, security or well-being of the public, Government employees or mission of the Government. The contractor personnel and subcontractor shall ensure that all personnel wear appropriate work attire for work activities as outlined in the EM-385-1-1. The contractor shall https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 28/ ensure that all personnel have appropriate training and necessary certificates to conduct work as outlined within the contract to ensure the safety of human life and to prevent damage to government property.

2.3. SAFETY DOCUMENTATION

2.3.1. ACCIDENT PREVENTION PLAN (APP). A qualified person must prepare the written site-specific Accident Prevention Plan. Prepare the APP in accordance with the format and requirements to cover all paragraph and subparagraph elements found in Appendix A of the EM 385-1-1.The APP must be job-specific and address any unusual or unique aspects of the project or activity for which it is written. The APP must interface with the Contractor's overall safety and health program referenced in the APP in the applicable APP element, and made site-specific. Describe the methods to evaluate past safety performance of potential subcontractors in the selection process. Also, describe innovative methods used to ensure and monitor safe work practices of subcontractors. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance. The APP must be signed by the Contract Manager for each applicable location. The Contract Manager must provide and maintain the APP and a log of signatures by each subcontractor foreman, attesting that they have read and understand the APP, and make the APP and log available on-site to the COR. If English is not the foreman's primary language, the Prime Contractor must provide an interpreter.

Submit the APP to the COR ten (10) calendar days prior to the date of the on-site contract performance for acceptance. Work cannot proceed without an accepted APP. Once reviewed and accepted by the COR, the APP and attachments will be enforced as part of the contract. Disregarding the accepted APP is cause for stopping of work, at the discretion of the COR, until the matter has been rectified. Continuously review and amend the APP, as necessary, throughout the life of the contract. Changes to the accepted APP must be made with the knowledge and concurrence of the COR and the Contract Manager. Incorporate unusual or high-hazard activities not identified in the original APP as they are discovered. Should any severe hazard exposure (i.e. imminent danger) become evident, stop work in the area, secure the area, and develop a plan to remove the exposure and control the hazard. Notify the Contracting Officer within 24 hours of discovery. Eliminate and remove the hazard. In the interim, take all necessary action to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public and the environment.

2.3.2. ACTIVITY HAZARD ANALYSIS (AHA). Before beginning each activity, task or Definable Feature of Work involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work, the Contractor(s) performing that work activity must prepare an AHA (Attachment 3). AHAs must be developed by the Prime Contractor or subcontractor and provided for Prime Contractor review and approval before submitting to the COR. AHAs must be signed by the Contract Manager and/or subcontractor Foreman performing the work. Submit the AHA for review at least one (1) government working day prior to the start of each activity task. The Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work sequences, specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented.

The activity hazard analyses shall be developed using the Project Schedule as the basis for the activities performed.

Any activities listed on the Project Schedule will require an AHA. The AHAs will be developed by the Contractor, supplier or subcontractor and provided to the Prime Contractor for submittal to the Contracting Officer.

AHAs must identify competent persons required for phases involving high risk activities, including, but not limited to, confined entry, crane and rigging, excavations, trenching, electrical work, fall protection, and scaffolding.

Each employee performing work as part of an activity, must review the AHA for that work and sign a signature log specifically maintained for that AHA prior to starting work on that activity. The Contract Manager must maintain a signature log on site for every AHA. Provide employees whose primary language is other than English, with an interpreter to ensure a clear understanding of the AHA and its contents.

2.3.3. MISHAP REPORTING. A mishap constitutes an incident, near miss, or accident involving the Contractor, subcontractors, which may or may not have caused obvious damage to persons or property. This includes injuries to Contractor employees, Corps employees, members of the public, or damage to Government or personal property.

The Contractor shall notify the COR by telephone of any Mishap as soon as reasonably possible but no later than the end of the day, followed by a written report.

Within notification include Contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any;

https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 29/ extent of injury, if known, and brief description of accident (for example, type of equipment used and PPE used).

Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted. Assist and cooperate fully with the Government's investigation(s) of any mishap.

The report shall include, but not be limited to, location, nature of the injury or accident, name(s) of injured party(ies), conditions/circumstances surrounding the occurrence, cause of the occurrence, parties notified, and actions taken. The report shall be accompanied by sketches, graphs, drawings, and photographs, as needed, and forwarded to the COR within seven (7) calendar days following the occurrence of accident or injury.

2.4. MEETINGS

2.4.1. PRE-TRANSPORT AND SAFETY MEETINGS. The Contractor shall attend a pre-transport meeting at a location agreed to with the COR to ensure that all parties involved are aware of the safety requirements and fish transport procedures. This meeting will be held prior to the start of the transport operations at a date each year to be decided.

The Contract Manager or alternate who have a responsibility or significant role in accident prevention and the development of the APP must attend a pre-work meeting. Discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the COR as to which phases will require an analysis. In addition, establish a schedule for the preparation, submittal, and Government review of AHAs to preclude project delays. Deficiencies in the submitted APP, identified during the COR’s review, must be corrected, and the APP re-submitted for review prior to the start of work.. All Contractor employees shall attend a project orientation meeting prior to the collection and transportation season and weekly safety meetings while they are working at the operating projects.

In addition, conduct safety meetings with all applicable contract staff to review past activities, plan for new or changed operations, review pertinent aspects of appropriate AHA (by trade) and APP, establish safe working procedures for anticipated hazards, and provide pertinent safety training and motivation. Conduct meetings at least once a month for all supervisors on the project location. The Contract Manager or alternate must conduct safety meetings for all crew members at least once a week. Document meeting minutes to include the date, persons in attendance, subjects discussed, and names of individual(s) who conducted the meeting. Maintain documentation on-site and furnish copies to the COR on request. Notify the COR of all scheduled meetings seven (7) calendar days in advance.

SECTION-3. ANTITERRORISM, TRAINING AND SECURITY REQUIREMENTS

3.1. HAZARDOUS ENERGY CONTROL PROGRAM. All Contractor work on site shall meet the requirements of "Safety and Occupational Health Office; Safe Clearance Program for the Control of Hazardous Energy, NWWP 385-1-20" which can be found on the Walla Walla District Internet site at:

http://www.nww.usace.army.mil/Portals/28/docs/contracting/OP385120.pdf.

Contractor, subcontractor, vendors and visitors shall take the appropriate level of HECP Procedure training commensurate with their job duties. Training and written tests for the modules below shall be completed on-line prior to commencing on-site work. Time estimates for training follow:

Awareness Level Training: Approximately 1 hour (non-working personnel, vendors and visitors).

Affected Persons: Approximately 2 hours in addition to Awareness Level training.

All costs for this training shall be considered incidental to the work, and therefore, no additional payment will be made. Training is an annual requirement and will expire one year from completion date. Training is provided by Vivid Learning Systems and is available on line at http://Hecp.vividlms.com. Cost for the training is displayed on the home page. Submit the training completion certification a minimum of seven days prior to the individual’s arrival at site. Maintain training documentation on site, including the individual's name and date of training completion, in accordance with NWWP 385-1-20.

Violations will be reported to the Issuing Individual and violations may result in disciplinary action ranging from retraining to removal of safe clearance authorization.

3.2. AT LEVEL I TRAINING. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 30/ each affected contractor employee and subcontractor employee, to the COR or to the Contracting Officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel.

To complete AT Level I awareness training, you must:

1. Download a certificate to authenticate access to enter the Antiterrorism Awareness Training and other DoD cyber websites from the following Link: https://public.cyber.mil/installroot_5-6/ (Click "InstallRoot

5.5 NIPR 64-bit Windows Installer" to begin downloading),

2. Use Chrome for the best connection if possible,

3. take the AT Level I awareness training is available at the following website:

JKO LCMS (jten.mil) or https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf

3.3. OPERATIONS SECURITY (OPSEC) TRAINING. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the Contracting Officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following website: OPSEC Awareness for Military Members, DOD Employees and Contractors GS130.16 (cdse.edu), then click on “Take this course.”

3.4. ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

3.5. CONTRACTORS WHO DO NOT REQUIRE COMMON ACCESS CARD (CAC), BUT REQUIRE ACCESS

TO A DOD FACILITY OR INSTALLATION. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available).

3.6. ACCESS REQUIREMENTS TO A DOD FACILITY OR INSTALLATION. The Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

3.7. SUSPICIOUS ACTIVITY REPORTING TRAINING. The contractor and all associated sub-contractors shall receive a brief/training on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training. Provide a letter to the COR certifying the individuals who completed the training and the date after viewing the training videos found below:

1. https://youtu.be/GLJ4Gbv8kkY

2. https://youtu.be/v5ybLc18dQE

3.8. ESCORTS IN RESTRICTED AREAS. All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

3.9. PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 31/ requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

SECTION-4. GOVERNMENT FURNISHED PROPERTY

4.1. GOVERNMENT FURNISHED PROPERTY (GFP). The Government will furnish to the Contractor the following property. The Contractor shall check the quantity and condition of such Government-furnished property when delivered and shall acknowledge receipt thereof in writing to the Contracting Officer, and, in case of damage to or loss of such property, the Contractor shall, within 24 hours, report in writing such damages and/or loss to the Contracting Officer. At the conclusion of the contract, the Contractor shall return these items to the Government.

Fish Barge Description, Number, and Acquisition Cost:

Item Description Barge Number Acquisition Cost Fish Barge Sockeye 2127 $500,000 Fish Barge Blueback 2817 $500,000 Fish Barge Steelhead 4382 $910,000 Fish Barge Coho 4394 $910,000 Fish Barge Chinook 8105 $1,340,000 Fish Barge King 8106 $1,340,000 Fish Barge 8107 $1,700,000 Fish Barge 8108 $1,700,000

The acquisition cost shall not be included by the Contractor in the contract proposed prices.

SECTION C-5 BARGES

5.1. FISH BARGES. The Government owns eight barges that will be used for transporting fish during the course of this contract. Two of the barges (SOCKEYE barge number 2127 and BLUEBACK barge number 2817) have a fish carrying capacity of 23,000 pounds and are double bottom three-compartment steel barges, approximately 130 feet long, 30 feet wide, with three diesel-driven pumps and attendant equipment. They weigh approximately 165 tons empty. Two barges (STEELHEAD barge number 4382 and COHO barge number 4394) have a fish carrying capacity of 50,000 pounds and are four-compartment steel barges, approximately 150 feet long, 35 feet wide, with three diesel-driven pumps, and weigh approximately 250 tons empty. The other four barges (CHINOOK barge number 8105, KING SALMON barge number 8106, and barges 8107 and 8108) each have a fish carrying capacity of 75,000 pounds and are six-compartment steel barges, approximately 196 feet long, 40 feet wide, with four diesel-driven pumps, and weigh approximately 450 tons empty. All of the barges draft approximately 2 feet when empty and 5 feet when loaded. Pushing knees have been installed on the bow and sterns of all barges to facilitate hooking barges together. The Contractor shall provide pushing protection on the towboat(s) to prevent any damage to the barge(s) while being pushed. The Contractor will be required to provide protection to structural members inside the barge(s) if necessary. The Government furnished fish barges are supplied with wire rope on winches and mooring ropes (poly) for lashing barges to each other or to the towboat.

5.2. BARGE ACCESS. Any required walkways or handrails from the towboat(s) to barge(s) shall be furnished and installed by the Contractor. The contractor shall follow applicable USCG and EM 385-1-1 section 19 rules and regulations. This shall include adequate provisions at the crossover point between the towboats and barges to afford safe passage for the Government barge rider. Safe access to the barge is needed at all hours of the day or night and under all weather conditions. The Contractor may be required to provide assistance such as having a crew member present during crossovers by the Government barge rider.

5.3. BARGE OPERATION. The Contractor shall provide a mechanic or deckhand to assist the Government representative on board the barge(s) in operation and maintenance of the barge engines and/or pumps, if requested. This shall include starting up and shutting down the diesel pump engines, minor lubrication, and any maintenance of the pump engines, shafts, and machinery on the barges during fish transport and the return trip https://whdapps.dol.gov/SF98/getwd.jsp?wdid=123250 32/ upriver. The towboat operators shall assist the Government representative on board the barge(s) in monitoring the engines, gages, alarm systems, and subsequent notification of the towboat(s) mechanics in the event abnormal conditions are displayed. If mechanical problems with barge engines and/or pumps are beyond the Contractor's immediate capabilities, the COR shall be notified. Cost of mechanical services incurred by the Contractor shall be included in Item numbers 0001, 0002, 0003, 0004, 0006, 1001, 1002, 1003, 1004,1006, 2001, 2002, 2003, 2004, and 2006.

5.4. BARGE FUELING. The Contractor shall provide all diesel fuel for operation of the diesel-engine driven pumps on the Government-owned fish barges. The Contractor shall refuel towboats and barges on the return trips from the release site back to Lower Granite Dam. In April, May and June, the barges shall be refueled on each return trip or on an alternate schedule if it is approved by the COR. In subsequent months (July and August), barges shall be filled every other trip or on an alternate schedule provided to and approved by the COR. All barges shall be completely refueled (“topped off”) on the return trip to Lower Granite Dam when being taken out of service for the season (as required under section (8.3. COMPLETION). The 23,000 pound capacity barges have a fuel holding capacity of 500 gallons, the 50,000 pound capacity barges have a fuel holding capacity of 750 gallons, and the 75,000 pound capacity barges have a fuel holding capacity of 1,650 gallons. After refueling a barge, the Contractor shall inform the Government representative on board the towboat of the number of gallons of diesel fuel added to each fish barge. Cost of fuel and fueling service incurred by the Contractor shall be included in Item numbers 0005, 1005 and 2005.

SECTION-6. RESPONSIBILITIES

6.1. GOVERNMENT RESPONSIBILITIES

6.1.1. TIMEKEEPING & RECORD KEEPING. The COR will be responsible for keeping the official record of operation of the Contractor's equipment and approve the Contractor's invoices for payment.

6.1.2. LOG BOOKS. The COR, or his authorized representative (barge rider), will certify the Contractor's log (Captains log book) of trip details including arrival and departure times, fish release times, delays encountered, and barge refueling.

6.1.3. FUEL, OPERATING SUPPLIES, LUBRICATION, ETC. All fuel, lubrication, operating supplies, etc., necessary for the operation of the towboat(s) shall be the responsibility of the Contractor. The Contractor shall also provide all diesel fuel for the diesel-powered pumps on the Government-owned fish barges.

Lubricants and other operating supplies for the diesel-powered pumps on the Government-owned fish barges will be provided by the Government.

6.1.4. GOVERNMENT PERSONNEL. The Government will have one representative on board each barge during fish loading and transportation operations. It shall be the responsibility of the Government representative to monitor the condition of the fish.

This is the start of the file's text. The full file is on GovTribe.